| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.9 LAccepted-Finance | ₹36.9 L | L1 | Accepted-Finance 1st Lowest Bidder |
| 2 | L2₹39.1 L+₹2.2 L (6.03%)Rejected-Finance | ₹39.1 L+₹2.2 L (6.03%) | L2 | Rejected-Finance 2nd Lowest Bidder |
| 3 | L3₹39.5 L+₹2.6 L (7.14%)Rejected-Finance 12 120 AZAD NAGAR TYUVVEL COLONY DEORIA DEORIA | ₹39.5 L+₹2.6 L (7.14%) | L3 | Rejected-Finance 3rd Lowest Bidder |
| 4 | L4₹40.4 L+₹3.5 L (9.59%)Rejected-Finance | ₹40.4 L+₹3.5 L (9.59%) | L4 | Rejected-Finance 4th Lowest Bidder |
| 5 | L5₹42.4 L+₹5.5 L (14.9%)Rejected-Finance | ₹42.4 L+₹5.5 L (14.9%) | L5 | Rejected-Finance 5th Lowest Bidder |
Tender Value
₹46.8 L
EMD Value
₹47,000
Closing Date
14 Sept 2023, 5:00 pmClosed
Superintending Engineer
Electricity Transmission Circle, UPPTCL, 132 KV S/s Mohaddipur Old , Gorakhpur
SUPPLY OF MATERIALS AND ASSOCIATED WORKS FOR SHIFTING / HEIGHT RAISING OF TOWER LOCATION No. 27-I , 27-II AND 28 OF 132 KV BARAHUWA-MOHADDIPUR OLD LINE (DUE TO WIDENING OF LANE OF DEORIA BYPASS ROAD) UNDER ETD-I , GORAKHPUR
2023_UPTCL_831810_1
Short Term E-Tender No. 27-ETC(G)/2023-24
Open Tender
Electrical Works
Item Rate
180 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
SE, ETC, Gorakhpur
₹47,000
13 Oct 2023
24 Aug 2023
15 Sept 2023
24 Aug 2023
14 Sept 2023
24 Aug 2023
Amount
PART-A (FOUNDATION WORK)
Detail Survey and Profiling
Check Survey and Peg Marking
Cost of excavation of 132 KV Tower foundation , pit including all earth work , back filling , levelling etc.
STUB SETTING
Setting of Stub setting NBDD+6
Setting of Stub setting NBDC+3
Installation of Steel reinforcement bars in R.C.C. foundation including cost of Steel reinforcement bars with cutting , bending , placing , binding etc.
Cost of concreting for all type of 132 KV S/C tower foundation including cost of cement , dewatering , shoring and shuttering , forming , curing but excluding cost of reinforcement bars with 1:2:4 ratio.
PART-B ( ERECTION WORK)
Erection of Superstructure of 132 KV S/C on DC Tower and extension wherever required including all work above ground level excluding hoisting of insulator , hardware and accessories but including fitting of danger plate , number plate , phase plate and bird guard fixing and punching.
Tack welding of all the bolts up to height one section of the tower or 5 meter from the ground level whichever in higher wit three tacks of 1200 seperation of minimum 10 mm thickness with 10 mm / 12 mm electrod and application of Zinc rich Aluminium paint on the affected surface including cost of all materials.
Grounding work including earth work etc. for pipe type grounding including cost of coke and salt.
Laying , stringing , clamping , jointing etc. of ACSR Panther conductor including hoisting of insulators , fitting of all necessary hardware and accessories i.e. fitting around rod, vibration damper etc. on all three phase of 132 KV S/C Line.
Laying , stringing , tensioning , clamping , jointing of 7/3.25 SWG earth wire including necessary hardware and accessories.
PART-C (DISMANTLING WORK)
Arrangement of back stay at different location wherever in required with the help of 18 mm wire rope at 3 phase separately to avoid tower collapse / bend at time of the de-stringing of conductor.
Dismantling of all 3 phase of existing ACSR Panther conductor of hardware fitting and conductor accessories e.g. armour rod , vibration damper , insulator string etc. of existing line and re-rolling of dismantled conductor on empty drums for re-use , safely transportation of all removed materials to UPPTCL Stores.
De-stringing of earth wire , rolling of dismantled earth wire and all associated work.
Dismantling of Tower after cutting of bolt with all safety and precaution along with associated work stacking of tower parts and all associated work etc.
Transportation of dismantled materials including shifting up to loading point loading into vehicle , transportation and unloading at store of S/s Store.
Watch and ward of tower parts , conductor , insulator , hardware etc. through out the work .
Dismantling of earlier foundation.
Dismantling of earlier foundation which includes excavation , breaking of foundation up to 2 mtrs. Depth and removing of concrete , cutting , removing of stub and steel reinforcement , backfilling , leveling and making field,
PART-D (SUPPLY)
Earth Wire 7/3.25
TOWER ACCESSORIES
Phase Plate in sets of red , blue and yellow for Tower.
Danger Plate
Number Plate
Pipe type earthing material per tower
PORCELAIN DISC INSULATOR
120 KN Disc Insulator
HARDWARE SUITABLE FOR ACSR PANTHER
Single Tension Fitting
Double Tension Fitting
Vibration Damper
Mid Span Compression Joint
Repair Sleeve
EARTH WIRE ACCESSORIES
Tension Clamp
Mid Span Compression Joint
Vibration Damper
Copper Bond
Tower Parts NBDD+6 (02 Nos.) NBDC+3 (01 Nos.) with template and Nut of fabrication , galvanizing , inspection and supply of various types of towers including stubs , tower extension and stub setting templates , gantry structure as per drawing and BOM and hangers , D-shackles , pack washers etc.
High Tensile Steel
Mild Steel
Hot deep galvanized , hexagon round hexagon head transmission tower bolts , nuts and washers for above structures as per BOM including step bolts and spring washers.
GANGOTRI ENTERPRISES
M/s Arun Kumar Singh
shiv shankar enterprises
Transtec Engineers and Constructions Co.
M/S A K ELECTRICAL
shivamenterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .