Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Ref. No.
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
19 Nov 2026, 6:00 pm7d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Published by the portal on this tender, for queries and grievance redressal.
Design and Development of water conservation and pond
10089258
GEM/2026/B/8207567
Two Packet Bid
Water management
Nashik, Maharashtra
Total value wise evaluation
BOQ
10 documents required · 10 mandatory
1 yrs
₹25 L
₹25 L
10%
Exempted
Yes
27 Oct 2026
27 Oct 2026
20 Nov 2026
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | Site preparation | Site clearance removal of weeds loose vegetation and debris stack dispose within approved lead | 1 | Sqm | watersupply8 | 365 |
| 2 | Setting out | Setting out pond profile pathway and deck levels and profiles | 1 | LS | watersupply8 | 365 |
| 3 | Earthwork | Excavation for irregular pond average 0.90 m depth includes dressing of bed and side slopes | 1 | Cum | watersupply8 | 365 |
| 4 | Earthwork | Loading transportation and disposal of surplus excavated soil within assumed 5 km lead | 1 | Cum | watersupply8 | 365 |
| 5 | Pond formation | Compaction and preparation of pond subgrade removal of sharp stones and local levelling | 1 | Sqm | watersupply8 | 365 |
| 6 | Pond lining | Supply and laying 1.5 mm HDPE geomembrane liner welded seams testing and upturn at edges | 1 | Sqm | watersupply8 | 365 |
| 7 | Pond lining | Non-woven geotextile protection layer below HDPE liner | 1 | Sqm | watersupply8 | 365 |
| 8 | Pond lining | Protective layer local concrete screed and cushioning at vulnerable locations below stone edge | 1 | Sqm | watersupply8 | 365 |
| 9 | Water edge | Natural stone boulder edging selected stone placement and bedding along pond perimeter | 1 | Rmt | watersupply8 | 365 |
| 10 | Water edge | Underwater edge sealing details liner termination clamping strip and sealant | 1 | LS | watersupply8 | 365 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_10089258.pdf
GEM_BID • 0.43 MB
technical_requirement_2026-10-27-17-51-08_523618d65992eaceeb5e019a805ccc4f.pdf
BOQ • 0.40 MB
boq_item_sample_file_2026-10-27-17-51-08_5e4c2b80694767c9c3449cdc43495314.csv
BOQ • 0.01 MB
1793105236.pdf
GEM_OTHER • 0.06 MB
1793104686.xlsx
GEM_OTHER • 0.01 MB
pond_5c51b0da-13f2-4274-b3641793105361085_watersupply8.pdf
GEM_OTHER • 4.96 MB
pond_97182200-8569-4507-9c2c1793105587462_watersupply8.pdf
GEM_OTHER • 4.96 MB
gtc.pdf
GEM_OTHER • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .