Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹44.1 L+₹2.4 L (5.65%)Rejected-AOC PERAMBALUR | TAMIL NADU | 621101 | L2 | Rejected-AOC L2 |
Tender Value
₹41.8 L
EMD Value
₹43,000
Closing Date
21 Dec 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director
DRDA Perambalur
Construction of New Open Well , Pump Room with Motor Arrangements at Kavulpalayam Malaiyadivaram West Side for Slum clearance Board in Kavulpalayam Panchayat in Perambalur Block in Perambalur District Package No. TN11-03
2023_RDTN_398410_1
Lr.No.3162/2023/B4 dt 06.12.2023
Open Tender
Civil Works
Item Wise
120 days
DRDA Perambalur
As Per Tender Document
2 documents required · 2 mandatory
₹0
₹43,000
DRDA Perambalur
31 Jan 2024
12 Dec 2023
21 Dec 2023
12 Dec 2023
21 Dec 2023
14 Dec 2023
14 Dec 2023
Amount
New Open well Geophysical survey charges including conveyance charges for the Geo-physical instruments and other accessories.
Drilling of trial Bore well at the center of the Open well
Earth work open well excavation complying with relevant clauses of TNDSS well sinking and with a lead up to 10m in Medium rock and Dense medium rock not requiring blasting etc complete Ist depth from 0.00m to 2.00 m
Earth work open well excavation complying with relevant clauses of TNDSS well sinking and with a lead up to 10m in Medium rock and Dense medium rock requiring blasting etc complete 2nd depth from 2.00m to 4.00 m
Earth work open well excavation complying with relevant clauses of TNDSS well sinking and with a lead up to 10m in Medium rock and Dense medium rock requiring blasting etc complete 3rd depth from 4.00m to 6.00 m
Earth work open well excavation complying with relevant clauses of TNDSS well sinking and with a lead up to 10m in Medium rock and Dense medium rock requiring blasting etc complete 4th depth from 6.00m to 8.00 m
Earth work open well excavation complying with relevant clauses of TNDSS well sinking and with a lead up to 10m in Medium rock and Dense medium rock requiring blasting etc complete 5th depth from 8.00m to 10.00 m
Earth work open well excavation complying with relevant clauses of TNDSS well sinking and with a lead up to 10m in Medium rock and Dense medium rock requiring blasting etc complete 6th depth from 10.00m to 12.00 m
Earth work open well excavation complying with relevant clauses of TNDSS well sinking and with a lead up to 10m in Medium rock and Dense medium rock requiring blasting etc complete 7th depth from 12.00m to 14.00 m
Earth work open well excavation complying with relevant clauses of TNDSS well sinking and with a lead up to 10m in Medium rock and Dense medium rock requiring blasting etc complete 8th depth from 14.00m to 16.00 m
Earth work open well excavation complying with relevant clauses of TNDSS well sinking and with a lead up to 10m in Medium rock and Dense medium rock requiring blasting etc complete 9th depth from 16.00m to 18.00 m
Earth work open well excavation complying with relevant clauses of TNDSS well sinking and with a lead up to 10m in Medium rock and Dense medium rock requiring blasting etc complete 10th depth from 18.00m to 20.00 m
P.C.C.1:4:8 mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and all labours etc complete
Centering for sides and soffits of R.C.C slab for plane surface / curved surface including strutting upto required height using MS sheets of size 90cmx60cm and BG 10 gauge, stiffend with welded MS angle of size 25mmx25mmx3mm laid over silver oak (country wood) joists of size 10cmx6.5cm (space at about 90cm c/c) and supported by casurina props of 10cm to 13cm dia spaced at 75cm c/c complying with standard specification etc., complete as directed by the TWAD Board Officers for the following items Plain surface
Supplying, fabricating and placing in position of RTS rods at all heights for reinforcement including the cost of steel and binding wire, labour charges etc., complete for all RCC works and as directed by TWAD Board Officers.
R.C.C 1:1.5:3 mix using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges etc.,complete.
Pump Room Earth work excavation and depositing on bank with initial lead and lift asper SS20B for foundation etc., complete.
Filling with good M. sand including cost and conveyance of all materials to site and all labour charges etc., complete
Earth Filling in Basement & sides of foundation with excavated earth including ramming and conslidatio etc completed
P.C.C.1:4:8 mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and all labours etc complete
Supplying and Delivery of Following Size Steel Door Including all Labour Charges etc.,Complete.
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc.,Cmplete.
Brick work in cement mortar 1:5 mix using country bricks all cost and conveyance of all materials to site and all labour charges etc.,Cmplete.
Centering for sides and soffits of R.C.C slab for plane surface / curved surface including strutting upto required height using MS sheets of size 90cmx60cm and BG 10 gauge, stiffend with welded MS angle of size 25mmx25mmx3mm laid over silver oak (country wood) joists of size 10cmx6.5cm (space at about 90cm c/c) and supported by casurina props of 10cm to 13cm dia spaced at 75cm c/c complying with standard specification etc., complete as directed by the TWAD Board Officers for the following items Plain surface
Supplying, fabricating and placing in position of RTS rods at all heights for reinforcement including the cost of steel and binding wire, labour charges etc., complete for all RCC works and as directed by TWAD Board Officers.
R.C.C.1:1.5:3 mix using 20mm ISS HBG metal including cost and Labours etc.,
Flooring in C C 1:4:8 (one cement ,four sand and eight HBS) 10 cm thick using 40mm HBS metal and top finished with Cement mortar 1:3 (one cement and three sand) 12 mm thick including labour charges for mixing,finishing and curing etc. complete and as directed by TWAD Board Officers.
Plastering with cement mortar 1:5 mix to 12mm thick including all cost and conveyance of all materials to site and all labour charges etc.,Complete.
Plastering with cement mortar 1:3 mix to 10mm thick including all cost and conveyance of all materials to site and all labour charges etc.,Complete.
White washing two coats with new wall surface including cleaning preparing the surface and curing etc complete.
Exterior emulsion two coats of approved colour new wall surface including cleaning preparing the surface and curing etc complete.
Supplying and fixing RCC jolly in all charges
Submersible Motor Pumpset Supply, Delivery of submersible pumpset suitable for bore well conforming to I.S Specification for the following duty conditions 7.5H.PX100 lpm x 200m
Supply, Delivery of pannel Board with necessary fitting suitable for compressor pumpset for the following duty conditions For 7.50 HP
Supply, Delivery of the following size of the flat PVC 3 corre copper conducted cable conforming to I.S 694/90 Suitable for submersible 2.50sqmm.3 core flat copper cablepumpset
Supply, Delivery of G.I Medium class pipes & specials as relavant I.S Specification 90mm HDPE Hose
Service Wire
EB Deposit
Labour charges for erection of 7.5 HP Submercible pumpset in bore well including fixing and jointing the cable with clamps ,twin earthing trial run etc., complete
Weld mesh Arrangement Supplying and delivery of following materials to site including all labour charges etc (including welding and Loading and unloding charges) Towards cost 40x40x6 Angle in all labour charges.
Towards cost supply of 25mm Flat in all labour charges
Towards cost supply of weld mesh including all labour charges including all charges
Towards cost and supply of I Section including all labour charges including all charges
Painting for New Iron wrok including all labour charges
Name Board charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
PANNEERSELVAM
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .