Tender Value
₹80.7 L
EMD Value
₹1.6 L
Closing Date
4 Feb 2026, 9:30 pmClosed
Minor Irrigation Department
ALWYN AGERA
Construction of Canal and Improvement works to tank of Muddhinakatte Mata near Madhre village of Dundalli grampanchayath in Somwarapete taluk of Kodagu district
MI/2025-26/MT/WORK_INDENT10231
MI/2025-26/MT/WORK_INDENT10231
Open
Modernization of tanks
Two Tender Document System(Two Cover)
Minor Irrigation Division Mangalore
7 documents required · 7 mandatory
Contractor Registration Certificate
3.2 (c) Executed in any one financial year the minimum quantities of work, Desilting/Earthwork in both excavation and embankment (combined quantities) : 6000.00Cum, Cement concrete (including RCC and PSC) : 541.00 Cum, Steel works for RCC : 5.90 MT
3.2 (a)To qualify for award of this contract each tenderer in his name should have in the last five years period..2020-21 to 2024-25 (a) achieved in atleast two financial years an average annual financial turnover ( in all classes of civil engineering construction works only) of Rupees 80.71 Lakhs (usually not less than the estimated cost under this contract )
3.2 (b)Satisfactory completion (at least 90% of the contract value) as a prime contractor at least one similar work such as Construction/improvement works to tank of value not less than Rs. 40.35 Lakhs.
Availability of Project Engineer And Organization Chart
Details of Ongoing Works
Details of works already Tendered for
3.3(b)liquid assets and /or availability of credit facilities of not less than Rs. 24.21 Lakhs (Credit lines/ letter of credit/ certificates from banks for meeting the fund requirement etc. for works costing upto Rs.100.00 lakhs)
Affidavit
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
₹2,020
₹1.6 L
4 Feb 2026
28 Jan 2026
5 Feb 2026
3 Feb 2026
Format for 3.2 (b)
SI.No Name of Work Estimated cost Tendered cost Cost of work executed Cost of work to be executed Date of agreement Stipulated period of completion Scheduled date of completion
Divisional Officer
Note:- The statement showing the value of existing commitments and On - Going works as well as the stipulated period of completion remaining for each of the works listed should be countersigned by the employer in charge, not below the rank of an Executive Engineer or equivalent.
Programme of work
Name of work: Construction of Canal and Improvement works to tank of Muddhinakatte Mata near Madhre village of Dundalli grampanchayath in Somwarapete taluk of Kodagu district
MI/2025-26/MT/WORK_INDENT10231
SNo Item Name Unit Estimate Quantity Rate Amount 1st Month 2nd Month 3rd Month 4th Month 5th Month 6th Month 7th Month 8th Month 9th Month 10th Month 11th Month Total Amount
Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness, by Mechanical Means using Dozer in area of light jungle, complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. 100 Sqm 67.00 440.16 29,490.72 67.00 29,490.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 29,490.72
2 Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work -In all kinds of soils Depth upto 3 m, complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. Cum 238.00 114.24 27,189.12 60.00 6,854.40 60.00 6,854.40 65.00 7,425.60 53.00 6,054.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 27,189.12
3 Earth work excavation for Foundation by mechanical means In all kinds of soil & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work-In all kinds of soils Depth upto 3 m, (Including cost of Dewatering) .complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. Cum 659.80 118.88 78,437.02 200.00 23,776.00 200.00 23,776.00 190.00 22,587.20 69.80 8,297.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 78,437.02
4 Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. Cum 54.18 6,707.68 363,422.10 13.00 87,199.84 14.00 93,907.52 14.00 93,907.52 13.18 88,407.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 363,422.10
5 Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. Cum 621.72 7,664.16 4,764,961.56 75.00 574,812.00 75.00 574,812.00 75.00 574,812.00 75.00 574,812.00 75.00 574,812.00 75.00 574,812.00 75.00 574,812.00 75.00 574,812.00 21.72 166,465.56 0.00 0.00 4,764,961.56
6 Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h)All other type of structures. Complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. t 7.367 78,118.88 575,501.79 0.80 62,495.10 0.80 62,495.10 0.80 62,495.10 0.80 62,495.10 0.80 62,495.10 0.80 62,495.10 0.88 68,744.61 0.88 68,744.61 0.81 63,041.94 0.00 0.00 575,501.79
7 Providing rubble stone/boulder filling between or behind abutment below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification. Complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. Cum 199.65 1,431.36 285,771.02 30.00 42,940.80 30.00 42,940.80 0.00 0.00 0.00 0.00 0.00 65.00 93,038.40 74.65 106,851.02 0.00 0.00 285,771.02
8 Providing and constructing 450 mm thick hand packed rough stone revetment consisting of 300 mm thick rough stones with 400 to 450 mm long through stones at 1.5 m c / c over a backing of 150 mm thick 40 mm down graded coarse aggregate layer including cost of all materials machinery, labour, laying to specified slope, wedging with chips, finishing & all necessary works as directed and complete as per specification. Complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. Sqm 210.00 823.20 172,872.00 0.00 0.00 0.00 0.00 0.00 0.00 50.00 41,160.00 55.00 45,276.00 55.00 45,276.00 50.00 41,160.00 0.00 172,872.00
9 Providing new embankment abutting to existing bund to strength the existing bund using soil from approved borrow area in layers of 200 to 250 mm and compacting each layer to density control of not less than 95 percent by vibrating plate compactor or pnuematic tamper including cost of all materials, machinery, labour, picking previous layer, spreading soil in layer, breaking clods, watering & all necessary works as directed and complete as per specification with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. Cum 1,202.00 508.48 611,192.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 550.00 279,664.00 652.00 331,528.96 611,192.96
10 Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. m 147.00 377.44 55,483.68 0.00 0.00 34.00 12,832.96 0.00 40.00 15,097.60 0.00 40.00 15,097.60 0.00 33.00 12,455.52 0.00 0.00 55,483.68
11 Providing and laying reinforced cement concrete pipe NP3 750 mm dia for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1101.6. Complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. m 10.00 3,735.20 37,352.00 0.00 0.00 0.00 10.00 37,352.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 37,352.00
12 Dewatering Pump 10 HP Complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. hr 40.00 230.00 9,200.00 5.00 1,150.00 5.00 1,150.00 5.00 1,150.00 5.00 1,150.00 5.00 1,150.00 5.00 1,150.00 5.00 1,150.00 5.00 1,150.00 0.00 0.00 0.00 9,200.00
13 Providing and fixing 200 x 200 x 750 mm roughly dressed boundary / demarcation / chainage/ arrow stones including cost of all materials, labour, engraving marks, excavating pit, fixing in position, murum filling with all other ancillary operations complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. Each 50.00 302.40 15,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.00 15,120.00 15,120.00
14 De-silting in Tank bed/Feeder Channel/Canal in dry condition by excavating the deposited bed material and disposing off the same by stacking/ formation of Embankment or as directed including cost of all machinery, labour & all necessary works as directed and complete as per specification complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. Cum 5,400.00 105.28 568,512.00 600.00 63,168.00 600.00 63,168.00 600.00 63,168.00 600.00 63,168.00 600.00 63,168.00 600.00 63,168.00 600.00 63,168.00 600.00 63,168.00 475.00 50,008.00 125.00 13,160.00 0.00 568,512.00
15 Providing and constructing coursed rubble ( size stone ) face stone masonry in CM 1 : 4 proportion by volume with stones from approved source including cost of all materials, machinery, labour, ramps,cleaning, batching and mixing mortar, packing mortar and wedging stone chips into joints, finishing, curing and all other ancillary operations complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. Cum 95.08 5,009.76 476,327.98 0.00 0.00 22.00 110,214.72 22.00 110,214.72 22.00 110,214.72 29.08 145,683.82 0.00 0.00 0.00 0.00 0.00 476,327.98
EW/Desilting /embankment 7499.80 6000.00 Cum
Cement concrete 675.90 541.00 Cum
Steel 7.37 5.90 MT
WORK DONE CERTIFICATE
Name of the Department
Name of Division
1 Name of work :
2 Estimated Cost :
3 Agreement No. :
4 Name of Contractor :
5 Tendered cost :
6 Date of work order :
7 Stipulated period of completion :
8 Intended date of Complition :
9 Final Date of completion, (For completed work) :
10 Revised amount of work (including claims/extra/arbitration amount,if any) :
11 Cost of work executed :
12 Balance cost of work :
13 Whether final bill is paid :
14 Reasons for non completion of work in schedule period of completion :
15 Whether any penalties fine/stop notice/compensation/liquidated damage imposed/Imposed & canceled :
a) Earth Excavation :
b) Embankment :
c) Providing & laying M-15 :
d) Providing & laying M-10 :
f) Rubber & Earth Filling :
g) Providing & laying M-20
16 Remarks of the Engineer performance of the Contractor working style quality consciousness tendency of claims :
Divisional Officer
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Star rate GO.pdf
Others - Star rate GO • 2.13 MB
Format for 3 2b.xls
Others - Format for 3 2b • 0.01 MB
General specifications new.pdf
Instructions to Tenderers • 0.57 MB
10231_kw-3_bid document.doc
Tender Document • 2.00 MB
E payment new.doc
Others - E payment new • 0.22 MB
10231_programme_of_work.xlsx
Others - Programe of work • 0.21 MB
Labour.docx
Others - Labour • 0.98 MB
Royalty new.pdf
Others - Royalty new • 0.06 MB
New LOC format.pdf
Others - New LOC format • 0.35 MB
Work done.xls
Others - Work done • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .