Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.1 LAdmitted-Finance | ₹12.1 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | Rejected-Technical Not Qualified for Cost Bid opening as per the requirement of Clause 1.0 |
| Sl No | Description | Qty | Unit | FLORA SCAPE L1 |
|---|---|---|---|---|
| 1.00 | Uprooting rank vegetation and weeds by digging the area to a depth of 60cm, removing all weeds and other growth with roots by forking repeatedly, breaking clods, rough dressing, flooding with waterm uprooting fresh growths after 10 to 15 days and then fine dressing for planting new grass, including disposal of all rubbish with all leads and lifts. | 200 | sqm | 70 ₹14,000 |
| 2.00 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately) a) Holes 45cm dia and 45cm deep | 10 | no | 80 ₹800 |
| 3.00 | Providing and laying Neelgiri/Mexican grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with tools wooden (Dhurmos) and than rolling the surface with light roller make the surface smoothen and light waterning with sprinkler and maintenance for 30 days or more till the grass establish properly, as per direction of officer-in-charge. | 100 | sqm | 270 ₹27,000 |
| 4.00 | Providing & laying Selection no. 1 doob grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with required tools wooden and than rolling the surface with light roller make the surface smoothen and light watering the same maintenance for 30 days or more till the grass establish properly,as per direction of officer in charge | 100 | sqm | 80 ₹8,000 |
| 5.00 | Cutting of Hedge/Edge including removing of cut material, cleaning, hoeing of hedge/edge bed watering, manureing and applying insecticides and fungicides etc. (excluding the cost of material which shall be supplied by the department) and as per direction of officer in charge. Note : Cutting & Hoeing of Hedge/Edge to be carried out minimum once in a month or as and when required and applying insecticides / fungicides once in a Quarter or as and when required in a month as per the direction of the Engineer in charge. Cost includes all above operations in a month per sqm (Top plan area of Hedge/ Edge shall be measured for payment) | 4,800 | sqm | 28 ₹1.3 L |
| 6.00 | Topairy cutting/ shapping of plant removing of cut materials, cleaning, hoeing of plants complete design hoeing of trees (Topairy) watering manure etc. (excluding the cost of material which shall be supplied by the department) and as per direction of officer-in-charge.
(a). Height of Topairy above 120 cm.
Note : Topairy cutting/shapping to be carried out once or as and when required in a month as per the direction of the Engineer in charge. Cost includes all above operations in a month per tree. | 720 | plants | 105 ₹75,600 |
| 7.00Plantation of Trees, Shrubs, and Hedge at site i/c watering and removal of unserveiceable material’s as per direction of officer in charge (excluding cost of plant & water) | ||||
| 7.01 | a) Trees Plant | 10 | no | 7 ₹70 |
| 7.02 | b) Shrubs Plant | 150 | no | 4 ₹600 |
| 7.03 | c) Hedge plant/Ground cover | 500 | no | 2 ₹1,000 |
Tender Value
₹13.2 L
EMD Value
₹26,370
Closing Date
15 May 2026, 6:00 pmClosed
The Executive Engineer(c), ABM CD, Chennai
BSNL Admin Building compound, 16, Greams Road, Chennai-600006
Maintenance of Administrative Building premises landscaping, fountains, trees and plants at Greams Road, Chennai 06 (April 2026 to March 2027)
2026_BSNL_276517_1
06/BSNL/CD-ABM/CH/2026-27
Open Tender
Civil Works - Others
365 days
Chennai
Not applicable
3 documents required · 3 mandatory
₹590
Accounts Officer (Cash), BSNL TN Circle, Chennai
₹26,370
23 May 2026
5 May 2026
18 May 2026
5 May 2026
15 May 2026
5 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Uprooting rank vegetation and weeds by digging the area to a depth of 60cm, removing all weeds and other growth with roots by forking repeatedly, breaking clods, rough dressing, flooding with waterm uprooting fresh growths after 10 to 15 days and then fine dressing for planting new grass, including disposal of all rubbish with all leads and lifts. | 200 | sqm | 196.3 | ₹39,260 |
| 2 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately) a) Holes 45cm dia and 45cm deep | 10 | no | 196.3 | ₹1,963 |
| 3 | Providing and laying Neelgiri/Mexican grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with tools wooden (Dhurmos) and than rolling the surface with light roller make the surface smoothen and light waterning with sprinkler and maintenance for 30 days or more till the grass establish properly, as per direction of officer-in-charge. | 100 | sqm | 196.3 | ₹19,630 |
| 4 | Providing & laying Selection no. 1 doob grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with required tools wooden and than rolling the surface with light roller make the surface smoothen and light watering the same maintenance for 30 days or more till the grass establish properly,as per direction of officer in charge | 100 | sqm | 196.3 | ₹19,630 |
| 5 | Cutting of Hedge/Edge including removing of cut material, cleaning, hoeing of hedge/edge bed watering, manureing and applying insecticides and fungicides etc. (excluding the cost of material which shall be supplied by the department) and as per direction of officer in charge. Note : Cutting & Hoeing of Hedge/Edge to be carried out minimum once in a month or as and when required and applying insecticides / fungicides once in a Quarter or as and when required in a month as per the direction of the Engineer in charge. Cost includes all above operations in a month per sqm (Top plan area of Hedge/ Edge shall be measured for payment) | 4,800 | sqm | 196.3 | ₹9,42,240 |
| 6 | Topairy cutting/ shapping of plant removing of cut materials, cleaning, hoeing of plants complete design hoeing of trees (Topairy) watering manure etc. (excluding the cost of material which shall be supplied by the department) and as per direction of officer-in-charge.
(a). Height of Topairy above 120 cm.
Note : Topairy cutting/shapping to be carried out once or as and when required in a month as per the direction of the Engineer in charge. Cost includes all above operations in a month per tree. | 720 | plants | 196.3 | ₹1,41,336 |
| 7Plantation of Trees, Shrubs, and Hedge at site i/c watering and removal of unserveiceable material’s as per direction of officer in charge (excluding cost of plant & water) | |||||
| 7.01 | a) Trees Plant | 10 | no | 196.3 | ₹1,963 |
| 7.02 | b) Shrubs Plant | 150 | no | 196.3 | ₹29,445 |
| 7.03 | c) Hedge plant/Ground cover | 500 | no | 196.3 | ₹98,150 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
Tendernotice_2.pdf
PDF • 0.55 MB
BOQ_322982.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid