Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Responsive |
| 2 | Accepted-Technical | Accepted-Technical Responsive |
| 3 | Accepted-Technical 280 B NIZAMUDDINPURA POWER HOUSE ROAD MAU | MAU | MAU | UTTAR PRADESH | Accepted-Technical Responsive |
Tender Value
₹11.3 L
EMD Value
₹21,000
Closing Date
30 May 2026, 2:00 pmClosed
BDO Pahadi
BDO Pahadi
Bhusaghar Guard room Work in Gram Panchayat Chandi Gaushala
2026_RDUP_1152171_2
448/Samgri Kraya/2026-27 Dt. 22-05-2026
Open Tender
Civil Works
Percentage
30 days
BDO Pahadi
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
BDO
₹21,000
2 Jun 2026
22 May 2026
1 Jun 2026
22 May 2026
30 May 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Boring of 30cm dia piles of single under reamed of 50cm dia of bulb and 3.5 metre depth in black cotton soil with hand operated auger machine including all labour T&P etc. for proper completion of work. | 34 | Nos | 650 | ₹22,100 |
| 2 | R.C.C. work in Pile Foundation in 1:2:4 cement, sand and 20mm mortar including supply of all materials, labour and T&P etc. required for proper completion of work as per E/I | 9.13 | m3 | 5,500 | ₹50,203.89 |
| 3 | S/F M.S. Square Pipe 50x50x5mm Including S/o material, including All complition of work | 26.24 | Qtl | 5,900 | ₹1,54,792.77 |
| 4 | Supply and fixing Galvanized corrugated iron roofing 24 B.W.C. in position including supply of materials, labour and tools and plants etc. required for proper completion of the work and including wastage.S.I. No 536 | 89.86 | m2 | 750 | ₹67,395 |
| 5 | Supplying and fixing 22 B.W.G. ridges valley and gutters for iron roofing fixed with J or U 10 mm (3/8") dia, with G.I. Umpet and bitumen washers complete including supply of all materials, labour and tools and plants etc. required for proper completion of the work including wastage.SI No.537 | 15.6 | m2 | 400 | ₹6,240 |
| 6 | Jungle Cleaning | 600 | m3 | 4 | ₹2,400 |
| 7 | Earth work in excavation in Foundation in B.C. soil including lead 30m & lift up to 1.52 mtr | 10.48 | m3 | 120 | ₹1,257.6 |
| 8 | Sand Filling in foundation Including supply of all materials, labour T&P etc. | 9.46 | M3 | 1,000 | ₹9,460 |
| 9 | Laying C.C. with 1:4:8 cement sand & 40mm gauge S.S.B. | 11.55 | M3 | 4,200 | ₹48,510 |
| 10 | R.C.C. work with 1:1.5:3 cement sand & 20mm G.S.B. Column above P.L. to Top | 4.26 | M3 | 7,400 | ₹31,524 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
BOQ_2158360.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .