| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.7 L+₹8,413 (1.49%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹7.9 L+₹2.3 L (40.4%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
Refer Docs
EMD Value
₹11,300
Closing Date
22 Jul 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Addl SE, Civil Works Division, PSTCL, Jalandhar
Room No. 301, Shakti Sadan, Jalandhar
Const. of 132 kV Capacitor Bank and allied foundations at 220 kV S/S Butari
2020_POWER_50209_1
CWJ/T-04/2020-21
Open Tender
Civil Works
Item Wise
90 days
220 kV S/S Butari
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹11,300
Yes
15 Apr 2021
9 Jul 2020
23 Jul 2020
9 Jul 2020
22 Jul 2020
9 Jul 2020
120 days
Earth work in excavation in foundations, trenches etc. In all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches , stacking the excavated soil clear from the edge of excavation and subsequent filling around masonary in 15 cm layers with compaction including diposal of all surplus soil as directed within a lead of 30 metres.
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
Centering and shuttering for columns (Square or rectangular or poly gonal in plain)
Cement Concrete 1:6:12 with 40mm gauge stone aggregate.
Cement Concrete 1:5:10 with 40mm gauge stone ballast .
Cement Concrete 1:2:4 with stone ballast or shingle .
Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS : 1791 and vibrated by needle vibrator but excluding steel reinforcement centering and shuttering in foundation and plinth .
First class burnt brick work laid in cement sand mortar 1:6 in foundation and plinth .
115mm thick brick wall laid in cement mortar 1:4 without reinforcement in foundation and plinth .
Conglomerate floor 25mm thick cement concrete topping 1:2:4
Conglomerate floor 50mm thick cement concrete topping 1:2:4.
12.5 mm thick cement plaster 1:3
20mm thick cement plaster 1:4 in two coat work
Cold twisted deformed (Ribbed/ Tor Steel Bar) Bars Fe 500 grade as per IS 1786-1985, for R.C.C works, where not including in the complete rate of RCC including bending and placing in position complete
Brick Kinari
Supplying and spreading of crushed stone3/4" nominal size(20mm) in 3" (75mm) thick layer over PCC flooring in the switch yard area marked or as per directions of Engineer-in-Charge.
Disposal of surplus earth of foundations, trenches at a distance upto 240 mtr.
Fixing of templates along with bolts as per drawing
Providing and Fixing various sizes M.S Cable Racks
Providing and fixing MS Angle iron nosing made out of 50x50x3 angle iron with hold fast complete in all respects
Supply , Hoisting & plaicng of ferro cement trench covers,frames of size given below made of MS Flat 50x3 mm with 6mm dia bars at 4.5 "and 9"welded to flat with lifting hook as per Drg No CW/DS2537 R5 and CS/DS2420 R3 Complete - P - type (3'-4"x1"-6")
Supply , Hoisting & plaicng of ferro cement trench covers,frames of size given below made of MS Flat 50x3 mm with 6mm dia bars at 4.5 "and 9"welded to flat with lifting hook as per Drg No CW/DS2537 R5 and CS/DS2420 R3 Complete - T4 - type (1'-9" x 2'-6")
Extra Carriage of materials- Cement
Extra Carriage of materials- Steel
Extra Carriage of materials- Fine sand
Extra Carriage of materials- Coarse sand,crusher and stone ballast
Extra Carriage of materials- Bricks
Difference of Rates of Material- Crushed bajri 13.2mm
Difference of Rates of Material- Crushed bajri 11.2mm
Difference of Rates of Material- Coarse Sand
Difference of Rates of Material- Stone metal 40mm
Difference of Rates of Material- Bricks
Mahesh Kohli Goverment Contractor
INDO ENGINEERING WORKS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .