Tender Value
Refer Docs
Closing Date
20 Nov 2023, 2:00 pmClosed
DGM E
2nd floor, World trade centre, Babar Road, New Delhi
Supply, Installation, testing and Commissioning and AMC of various capacity STPs at Ambala, Bijwasan and Rewari Terminal under Delhi and Haryana State Office
2023_DLSO_172633_1
DSO/ENG/LT-37/2023-24
Limited
Instrumentation - All
Works
120 days
Delhi and Haryana
As per NIT
6 documents required · 6 mandatory
Exempted
No physical prebid meeting
12 Dec 2023
7 Nov 2023
21 Nov 2023
7 Nov 2023
20 Nov 2023
8 Nov 2023
14 Nov 2023
Amount
Part-A: Supply, Commissioning of STP: Ambala Terminal SEWAGE TREATMENT PLANT as per the Technical Specification . (As below) a) The scope of activity shall include design, drawings, getting approval from statutory authorities, supply, supervision, erection, testing and commissioning of required capacity of STP as specified below with all electrical, mechanical, civil and piping works. b) Scope of supply of each Sewage Treatment Plant shall include but not necessarily be limited to following equipments to achieve the outlet quality as per Clause 4.0 Design Parameters of the Technical Specification. Any additional equipment required to achieve treated water quality shall be included by the Vendor in their scope of supply. List of Equipments for each of the skid mounted STPs Bar Screen (1 No), Grit Chamber (1 No), Oil & Grease Trap Chamber(where required) (1 No), Sewage Collection Tank(1 No), Raw Sewage Pumps (2 Nos(1W+1S)), Air Blower( 2 Nos(1W+1S)), FBBR/MBBR containerized (1 No), Recirculation Pumps (1 No), Dosing Tanks (2 No), Dosing Pumps (2 Nos(1W+1S)), Filter feed pumps (2 Nos(1W+1S)), Pressure Sand filter (1 No), Activated Carbon filter (1 No), Treated Water Collection Tank(1 No), Treated water Transfer pumps (2 Nos(1W+1S)), Sludge holding tank(1 No ), Mechanical filter pree Mechanical filter press (1 No), Sludge feeding pumps (2 Nos(1W+1S)), Sludge Drying Bed( 1 No) No extra payment shall be made to the successful contractor for making the Sewage treatment plant fully operational and meeting the desired treated water quality by aforesaid means including all accessories which might be needed for the system to serve its purpose. Scope of work also includes design and construction of all types of civil works for underground/above ground RCC chambers, tanks etc. for screen chamber, Oil & Grease traps, equalization tank, sewage collection tank etc. and foundations for equipment such as pumps, blowers, filter press, pipe supports etc., all complete as per manufacturer’s specifications and directions of the Engineer-in-Charge. Scope also includes getting design and drawings approved through TPI inspector from the list of TPI Inspection agencies as well as TPI of materials before dispatch
a) 5 kLD in 8 hours (Unit of measurement EA (Lump sum)
Part B: Associated Lumpsum Civil and Electrical/ Instrumentation works for functioning of STP
Civil, Electrical/ Instrumentation work
Part-C: Cost of credible spares for operation of STP
Cost of credible spares as per bidder's design and detailed engineering
Part D: AMC cost for STP for period of 5 years AMC 5 years for STPs after warranty of 2 years
2x5 kLD in 8 hours (Unit of measurement of quarter)
Charges for additional visits beyond specified in scope of AMC. (Per visit comprises of 2 days)
Part-A: Supply, Commissioning of STP: Rewari Terminal SEWAGE TREATMENT PLANT as per the Technical Specification . (As below) a) The scope of activity shall include design, drawings, getting approval from statutory authorities, supply, supervision, erection, testing and commissioning of required capacity of STP as specified below with all electrical, mechanical, civil and piping works. b) Scope of supply of each Sewage Treatment Plant shall include but not necessarily be limited to following equipments to achieve the outlet quality as per Clause 4.0 Design Parameters of the Technical Specification. Any additional equipment required to achieve treated water quality shall be included by the Vendor in their scope of supply. List of Equipments for each of the skid mounted STPs Bar Screen (1 No), Grit Chamber (1 No), Oil & Grease Trap Chamber(where required) (1 No), Sewage Collection Tank(1 No), Raw Sewage Pumps (2 Nos(1W+1S)), Air Blower( 2 Nos(1W+1S)), FBBR/MBBR containerized (1 No), Recirculation Pumps (1 No), Dosing Tanks (2 No), Dosing Pumps (2 Nos(1W+1S)), Filter feed pumps (2 Nos(1W+1S)), Pressure Sand filter (1 No), Activated Carbon filter (1 No), Treated Water Collection Tank(1 No), Treated water Transfer pumps (2 Nos(1W+1S)), Sludge holding tank(1 No ), Mechanical filter pree Mechanical filter press (1 No), Sludge feeding pumps (2 Nos(1W+1S)), Sludge Drying Bed( 1 No) No extra payment shall be made to the successful contractor for making the Sewage treatment plant fully operational and meeting the desired treated water quality by aforesaid means including all accessories which might be needed for the system to serve its purpose. Scope of work also includes design and construction of all types of civil works for underground/above ground RCC chambers, tanks etc. for screen chamber, Oil & Grease traps, equalization tank, sewage collection tank etc. and foundations for equipment such as pumps, blowers, filter press, pipe supports etc., all complete as per manufacturer’s specifications and directions of the Engineer-in-Charge. Scope also includes getting design and drawings approved through TPI inspector from the list of TPI Inspection agencies as well as TPI of materials before dispatch
a) 10 kLD in 8 hours (Unit of measurement EA (Lump sum)
a) 15 kLD in 8 hours (Unit of measurement EA (Lump sum)
Part B: Associated Lumpsum Civil and Electrical/ Instrumentation works for functioning of STP
Civil, Electrical/ Instrumentation work
Part-C: Cost of credible spares for operation of STP
Cost of credible spares as per bidder's design and detailed engineering
Part D: AMC cost for STP for period of 5 years AMC 5 years for STPs after warranty of 2 years
10 kLD in 8 hours (Unit of measurement of quarter)
15 kLD in 8 hours (Unit of measurement of quarter)
Charges for additional visits beyond specified in scope of AMC. (Per visit comprises of 2 days)
Part-A: Supply, Commissioning of STP: Bijwasan Terminal SEWAGE TREATMENT PLANT as per the Technical Specification . (As below) a) The scope of activity shall include design, drawings, getting approval from statutory authorities, supply, supervision, erection, testing and commissioning of required capacity of STP as specified below with all electrical, mechanical, civil and piping works. b) Scope of supply of each Sewage Treatment Plant shall include but not necessarily be limited to following equipments to achieve the outlet quality as per Clause 4.0 Design Parameters of the Technical Specification. Any additional equipment required to achieve treated water quality shall be included by the Vendor in their scope of supply. List of Equipments for each of the skid mounted STPs Bar Screen (1 No), Grit Chamber (1 No), Oil & Grease Trap Chamber(where required) (1 No), Sewage Collection Tank(1 No), Raw Sewage Pumps (2 Nos(1W+1S)), Air Blower( 2 Nos(1W+1S)), FBBR/MBBR containerized (1 No), Recirculation Pumps (1 No), Dosing Tanks (2 No), Dosing Pumps (2 Nos(1W+1S)), Filter feed pumps (2 Nos(1W+1S)), Pressure Sand filter (1 No), Activated Carbon filter (1 No), Treated Water Collection Tank(1 No), Treated water Transfer pumps (2 Nos(1W+1S)), Sludge holding tank(1 No ), Mechanical filter pree Mechanical filter press (1 No), Sludge feeding pumps (2 Nos(1W+1S)), Sludge Drying Bed( 1 No) No extra payment shall be made to the successful contractor for making the Sewage treatment plant fully operational and meeting the desired treated water quality by aforesaid means including all accessories which might be needed for the system to serve its purpose. Scope of work also includes design and construction of all types of civil works for underground/above ground RCC chambers, tanks etc. for screen chamber, Oil & Grease traps, equalization tank, sewage collection tank etc. and foundations for equipment such as pumps, blowers, filter press, pipe supports etc., all complete as per manufacturer’s specifications and directions of the Engineer-in-Charge. Scope also includes getting design and drawings approved through TPI inspector from the list of TPI Inspection agencies as well as TPI of materials before dispatch
a) 5 kLD in 8 hours (Unit of measurement EA (Lump sum)
a) 15 kLD in 8 hours (Unit of measurement EA (Lump sum)
Part B: Associated Lumpsum Civil and Electrical/ Instrumentation works for functioning of STP
Civil, Electrical/ Instrumentation work
Part-C: Cost of credible spares for operation of STP
Cost of credible spares as per bidder's design and detailed engineering
Part D: AMC cost for STP for period of 5 years AMC 5 years for STPs after warranty of 2 years
5 kLD in 8 hours (Unit of measurement of quarter)
15 kLD in 8 hours (Unit of measurement of quarter)
Charges for additional visits beyond specified in scope of AMC. (Per visit comprises of 2 days)
WATERNEER TECHNOLOGIES INDIA PVT LTD
Mentor Water Experts Pvt. Ltd.
KRISHNA GANGAA ENVIRO SYSTEM PVT.LTD.
WATERNEER TECHNOLOGIES INDIA PVT LTD
Mentor Water Experts Pvt. Ltd.
KRISHNA GANGAA ENVIRO SYSTEM PVT.LTD.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .