Loading…
Loading…
Tender Value
₹90.3 L
EMD Value
₹55,200
Closing Date
5 Oct 2026, 11:00 am
Superintending Engineer
Office of the Superintending Engineer, PWD, Building Construction and Maintenance Circle, Thanjavur-1
Construction of Revenue Divisional Officers Camp Office Cum Quarters at Kumbakonam in Thanjavur District
2026_PWD_706453_1
11-1/2026-2027
Open Tender
Civil Works - Buildings
Lump-sum
210 days
Kumbakonam
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹55,200
21 Sept 2026
21 Sept 2026
6 Oct 2026
21 Sept 2026
5 Oct 2026
21 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 372.5 | M3 | - | - |
| 2 | Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as direct-ed by the departmental officers. | 25 | M3 | - | - |
| 3 | Supplying and filling in foundation, basement, etc with conveyed earth in layers of not more than 150mm thick layers well watered, rammed with surface vibrator and consolidated including conveyance charges etc. complete complying with standard
specification and as directed by the departmental officers. | 41 | M3 | - | - |
| 4 | Supplying and filling in foundation, basement, etc with Sand Gravel mix in ratio of 1:3 in layers of not more than 15cm thick thoroughly mixed, well watered, rammed with surface vibrator and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 44.15 | M3 | - | - |
| 5 | Supplying and FILLING GRAVEL Supplying and filling in 'foundation and basement with filling crushed stone sand in layers of not more than 15cm.thick well rammed watered and compacted -1m3 etc., complete complying with standard specification. | 344 | M3 | - | - |
| 6 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 24 | M3 | - | - |
| 7 | Cement Concrete 1:5:10 (One Cement, Five sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification Mixing by manuval means | 20.85 | M3 | - | - |
| 8Brick work in following Cement Mortar using best quality Burnt Clay Brick of size 8 3/4” x 4 1/4” x 2 1/4” with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | |||||
| 8.01 | In cement mortar 1:5 Foundation and basement | 49.5 | M3 | - | - |
| 9Brick work in following Cement Mortar using best quality Burnt Clay Brick of size 8 3/4” x 4 1/4” x 2 1/4” with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
RDOOFFICEKUMBAKOANCON.pdf
Tender Documents • 2.25 MB
BOQ_849055.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .