| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.2 LAccepted-Finance | ₹19.2 L | L1 | Accepted-Finance LOWER RATE FOUND |
| 2 | L2₹19.2 L+₹1,153.87 (0.06%)Rejected-Finance | ₹19.2 L+₹1,153.87 (0.06%) | L2 | Rejected-Finance HIGHER RATE FOUND |
Tender Value
₹22.8 L
EMD Value
₹45,520
Closing Date
21 Apr 2026, 2:00 pmClosed
BDO KUREBHAR
BDO KUREBHAR, SULTANPUR
KASBA SULTANPUR BANDHA ROAD SE SHIV MANDIR TAK CC ROAD NIRMAN KARYA
2026_RDUP_1134364_1
28/2LEKHA-ETENDER/2026-27 DT. 06.04.2026
Open Tender
Civil Works
Percentage
180 days
KUREBHAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
BDO KUREBHAR
₹45,520
27 Apr 2026
8 Apr 2026
21 Apr 2026
8 Apr 2026
21 Apr 2026
8 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W in Excavation in foundations in ordinary soil and disposal malwa out of 1Km. Distance from site and including dressing of sides and rammings of bottom. SI No. - 251 | - | Cum. | - | - |
| 2 | E/W in cutting or filling in embankment in ordinary soil i/c ramming dressing and leveling the same to required level and slope also i/c cartage of earth from 1 Km. Distance as per SI No. - 253 | - | Cum. | - | - |
| 3 | Providing and laying PCC 1:6:12 (1 cement : 6 fine sand : 12 graded brick aggregate 40 mm. nominal size) i/c supply of all materials. Labour and T&P etc. SI No. 273 | - | Cum. | - | - |
| 4 | Class-150 brick work in 1 : 4 cement and coarse sand mortar including necessary cutting and moulding of bricks as required and also including supply of all materials, labour and T & P etc. required for proper completion of the work. SI No.305 | - | Cum. | - | - |
| 5 | Centering and Shuttering i/c strutting, propping etc. and removal of form work for Foundation, Columns, Slab etc. | - | Sqm. | - | - |
| 6 | Providing and laying RCC 1:1 1/2:3 (1 cement : 1 1/2 C. sand : 3 graded Stone aggregate 20 mm. nominal size) i/c supply of all materials. Labour and T&P etc. required for proper completion of the work. SI. No. 284(b) | - | Cum. | - | - |
| 7 | Mild steel or iron in plain work shch as reinforced concrete work i/c cutting , bending for proper completion of the work . SI No. 504 | - | Qtls. | - | - |
| 8 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement | - | Cum. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
BOQ_2117670.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .