Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.2 CrAdmitted-Finance | ₹17.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹18.7 CrAdmitted-Finance | ₹18.7 Cr | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | VISHVARAJ ENVIRONMENT LIMITED L2 | Vikas Electricals L1 |
|---|---|---|---|---|---|
| 1.00 | Operation and Maintenance of existing 9 nos. schemes with intake points on Mahanadi River having command area between 500 Ha. to 2000 Ha. in Megalift Cluster-VI in the districts of Cuttack comprising all electro-mechanical & instrumentation equipments installed in pump house & MCC room including pumps and motors, switchyard & Transmission lines, intake well, Sump well, Rising main, Distribution chamber, Gravity main, complete distribution network by UGPL covering culturable command area of 16,750Ha. with operation of maintenance of all its 9 completed schemes including its power system connectivity, proper distribution of water to the ayacut including watch & ward with testing and calibration of all electro-mechanical components before the start of each irrigation period in the O & M period of 5 years on “Turn-key basis”. | 1 | Nos | 18,65,65,862.93 ₹18.7 Cr | 17,19,00,000 ₹17.2 Cr |
Tender Value
Refer Docs
EMD Value
₹20.7 L
Closing Date
27 Apr 2026, 5:00 pmClosed
CHIEF ENGINEER, MEGALIFT, BHUBANESWAR
PLOT NO. A-8/2, BHOI NAGAR, BHUBANESWAR-751022
MEGALIFT PROJECTS
2026_CEMLP_128047_1
1ML/2026-27
Open Tender
Civil Works - Lift Irrigation Schemes
720 days
CUTTACK
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹20.7 L
Yes
O/O CHIEF ENGINEER, MEGALIFT, BHUBANESWAR
1 Jun 2026
13 Apr 2026
28 Apr 2026
13 Apr 2026
27 Apr 2026
13 Apr 2026
13 Apr 2026 - 16 Apr 2026
18 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Operation and Maintenance of existing 9 nos. schemes with intake points on Mahanadi River having command area between 500 Ha. to 2000 Ha. in Megalift Cluster-VI in the districts of Cuttack comprising all electro-mechanical & instrumentation equipments installed in pump house & MCC room including pumps and motors, switchyard & Transmission lines, intake well, Sump well, Rising main, Distribution chamber, Gravity main, complete distribution network by UGPL covering culturable command area of 16,750Ha. with operation of maintenance of all its 9 completed schemes including its power system connectivity, proper distribution of water to the ayacut including watch & ward with testing and calibration of all electro-mechanical components before the start of each irrigation period in the O & M period of 5 years on “Turn-key basis”. | - | Nos | - | - | item1 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 13.36 MB
BOQ_587644.xls
BOQ • 0.23 MB
biddoc.pdf
Tender Documents • 12.32 MB
Download all tender documents and submit your bid