Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical accept |
| 2 | Accepted-Technical | Accepted-Technical accept |
Tender Value
₹60.0 L
EMD Value
₹5.1 L
Closing Date
24 Nov 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DDC MANDI PARISHAD PRAYAGRAJ
DDC MANDI PARISHAD PRAYAGRAJ
LINK ROAD PRATAPGARH JEDHWARA ROAD SE BASHIPUR TAK ROAD REPAIR WORK
2025_RKUMP_1091575_1
815/15.11.2025
Open Tender
Civil Works - Roads
Fixed-rate
90 days
PRATAPGARH
LINK ROAD PRATAPGARH JEDHWARA ROAD SE BASHIPUR TAK ROAD REPAIR WORK
2 documents required · 2 mandatory
₹10,700
DDC MANDI PARISHAD PRAYAGRAJ
₹5.1 L
Yes
10 Dec 2025
17 Nov 2025
24 Nov 2025
17 Nov 2025
24 Nov 2025
17 Nov 2025
17 Nov 2025 - 24 Nov 2025
Earth work in cutting or in embankment in ordinary soil excavtion to be in the form of reqular pits not exceeding 1/2 metre in deptk and earthwork in embankment to be in 20 cm layers including ramming & dressing the surface to required levels and slopes and also inclduing 1.5 metre lifts and 30m lead the earth from cutting to be used in making embankement or to be deposites as directed as directed by EC
W.B.M. Grading-3 Providing, laying, spreading and compacting stone aggregated of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 Kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading-3 as per Technical Specification Clauses 405.
Providing and applying Primer coat with bitumen VG-10 using pressure disributor at rate of 0.35 kg per sqm on the prepared bituminous/granular surface cleaned with mechnical broom (MORD 503) As per Analysis
Providing and applying tack coat with bitumen VG-10 using pressure disributor at rate of 0.35 kg per sqm on the prepared bituminous/granular surface cleaned with mechnical broom (MORD 503) As per Analysis
Providing laying and rolling of open graded premix surfacing of 20mm thickness composed of 13.2 mm to 5.6mm aggregates either using penetration grade bitumen of cut back or emulsion to required line grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant laying and rolling with a smooth wheeled roller 8-10 tone capacity finished to required level and qrades
Providing and laying seal coat sealing the voids in a bituminous surface
supply and fixing of 350 mm dia hume pipe
S/F of signboard as per direction of engineer in charge
Excavtion in foundation in ordinary soil
P/L of cement concreet in 1:6:12 including all supply and matriales
M-150 class brick work in 1:4 in foundation up to plinth
5cm thick c.c thick cement concrete with all complete work
W.B.M. Grading-3 Providing, laying, spreading and compacting stone aggregated of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 Kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading-3 as per Technical Specification Clauses 405.
Providing and laying of rubber moulded reflective Zig-zag 80mm thick tiles of precast compressed c.c passing minimum 30mpa compressive strength ISI marked concrete block pavements having thickness 80mm as per technical specification clause 1504
The routine maintenance of above road work including earthen shoulder and bitumenous pavement etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material T&P labour but excluding GST) for 2nd year maintenance [email protected] %
The routine maintenance of above road work including earthen shoulder and bitumenous pavement etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material T&P labour but excluding GST) for 3rd year maintenance [email protected]%
The routine maintenance of above road work including earthen shoulder and bitumenous pavement etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material T&P labour but excluding GST) for 4th year maintenance [email protected]%
The routine maintenance of above road work including earthen shoulder and bitumenous pavement etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material T&P labour but excluding GST) for 5th year maintenance [email protected]%
The routine maintenance of above road work including earthen shoulder and interlocking work etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material T&P labour but excluding GST) for 2nd year maintenance [email protected]%
The routine maintenance of above road work including earthen shoulder and interlocking work etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material T&P labour but excluding GST) for 3rd year maintenance [email protected]%
The routine maintenance of above road work including earthen shoulder and interlocking work etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material T&P labour but excluding GST) for 4th year maintenance [email protected]%
The routine maintenance of above road work including earthen shoulder and interlocking work etc to the required standards and in the manner as defined in cb condidtion and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after years(including cost of material T&P labour but excluding GST) for 5th year maintenance [email protected]%
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.81 MB
BOQ_2005265.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .