Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC HANS BHAWAN KALAGARH ROAD DHAMPUR DISTRICT BIJNOR UTTAR PRADESH | DHAMPUR | BIJNOR | UTTAR PRADESH | ₹1.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.2 CrRejected-Finance | ₹1.2 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹1.2 CrRejected-Finance MOHALLA LUHARI SARAI NAGINA DISTRICT BIJNOR UTTAR PRADESH | NAGINA | BIJNOR | UTTAR PRADESH | ₹1.2 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹1.3 CrRejected-Finance ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | ₹1.3 Cr | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | BHAMAR SINGH L4 | LAIQUE AHMAD L3 | YOGESH KUMAR CONTRACTOR L1 | dinesh kumar contractor L2 |
|---|---|---|---|---|---|---|---|
| 1.00Laying and Jointing PVC Pipe. Heading | |||||||
| 1.01 | Earth work in cutting or in embankment in ordinary Soil, excavation to be in the form of regular pits and earth Work in embankment to be in 20 cm layers including ramming and dressing the surface to the required levels and slops and also including 1.50meter lift and 30 meter lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank within 30 meter distance as directed by Engineer-in-charges. | 9,738.9 | M³ | 50 ₹4.9 L | 43 ₹4.2 L | 35 ₹3.4 L | 35 ₹3.4 L |
| 1.02 | Earth work in filling for raising bank for stone pitching or in embankment in ordinary Soil, earth Work in embankment to be in 20 cm layers including ramming and dressing the surface to the required levels and slops and also including All lift and lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank within 30 meter distance as directed by Engineer-in-charges. | 6,605.85 | M3 | 80 ₹5.3 L | 72 ₹4.8 L | 40 ₹2.6 L | 40 ₹2.6 L |
| 1.03 | Supplying, laying & Packing HDPE GABION rope case Size 1.80 x1.80x 0.50 m with Filled GEO Bags 200 GSM with ordinary Soil i/c Contractor profit all taxes etc. complete. | 2,103 | Nos | 3,000 ₹63.1 L | 3,098 ₹65.2 L | 3,000 ₹63.1 L | 3,000 ₹63.1 L |
| 1.04 | Spplying and Laying of Geo Textile Sheet made of Non woven geo textile (Sheet) of 250 gsm below Pitching with pegs i/c preparation of surface i/c all cost of material, labour, T&P etc complete. | 2,688.4 | M2 | 80 ₹2.2 L | 58 ₹1.6 L | 80 ₹2.2 L | 80 ₹2.2 L |
| 1.05 | Supplying, Laying & Packing 20 kg to 40 kg weight boulder in G.I. wire crates Size (1.00×1.00×1.00)M., i/c tying the crates with all cost of material, labour, taxes, T&P etc. complete /M³. | 343.8 | M3 | 2,300 ₹7.9 L | 1,628 ₹5.6 L | 2,050 ₹7.0 L | 2,050 ₹7.0 L |
| 1.06 | Proveding and laying mechanically woven double twisted Hexagonal Shaped wire mesh gabion box/ wire crate of size 1.00x1.00x1.00 m. with mesh size 10cmx12cm, 10 SWG G.I. wire i/c all cost of material, labour, T&P etc complete. | 382 | Nos | 1,200 ₹4.6 L | 916 ₹3.5 L | 1,050 ₹4.0 L | 1,055 ₹4.0 L |
| 1.07 | Supplying, Laying Dry stone pitching up to 3m height with 60 meters lead of material. i/c cost of all material, labour & T&P etc. complete. | 1,241.09 | M3 | 2,400 ₹29.8 L | 1,712 ₹21.2 L | 2,000 ₹24.8 L | 2,000 ₹24.8 L |
| 1.08 | Supplying & filling EC bags with ordinary earth i/c placing in position lead upto 160 M. i/c all labour T&P ect. Complete | 72,986 | M3 | 20 ₹14.6 L | 15 ₹10.9 L | 10 ₹7.3 L | 10 ₹7.3 L |
| 1.09 | Providing, laying & Packing Nylon Rope Crates for filling EC Bags filled with Local earth (size 0.90x0.90x0.90 M), i/c Contractor profit all taxes etc. complete. | 2,834 | M3 | 80 ₹2.3 L | 63 ₹1.8 L | 70 ₹2.0 L | 70 ₹2.0 L |
Tender Value
₹1.7 Cr
EMD Value
₹3.4 L
Closing Date
17 Mar 2026, 12:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer Irrigation Work Circle Tubewell colony Moradabad
LOT 06 Janpad Bijnor mein Kho nadi ke bayen kinare par sthit gram Kopa evam Dhurahara ki suraksha hetu katav nirodhak karya.
2026_UPIDC_1122949_6
04/SEIWC/2025-26
Open Tender
Civil Works
90 days
DHAMPUR
AS PER NIT
2 documents required · 2 mandatory
₹2,354
₹3.4 L
10 Apr 2026
9 Mar 2026
17 Mar 2026
9 Mar 2026
17 Mar 2026
9 Mar 2026
Laying and Jointing PVC Pipe. Heading
Earth work in cutting or in embankment in ordinary Soil, excavation to be in the form of regular pits and earth Work in embankment to be in 20 cm layers including ramming and dressing the surface to the required levels and slops and also including 1.50meter lift and 30 meter lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank within 30 meter distance as directed by Engineer-in-charges.
Earth work in filling for raising bank for stone pitching or in embankment in ordinary Soil, earth Work in embankment to be in 20 cm layers including ramming and dressing the surface to the required levels and slops and also including All lift and lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank within 30 meter distance as directed by Engineer-in-charges.
Supplying, laying & Packing HDPE GABION rope case Size 1.80 x1.80x 0.50 m with Filled GEO Bags 200 GSM with ordinary Soil i/c Contractor profit all taxes etc. complete.
Spplying and Laying of Geo Textile Sheet made of Non woven geo textile (Sheet) of 250 gsm below Pitching with pegs i/c preparation of surface i/c all cost of material, labour, T&P etc complete.
Supplying, Laying & Packing 20 kg to 40 kg weight boulder in G.I. wire crates Size (1.00×1.00×1.00)M., i/c tying the crates with all cost of material, labour, taxes, T&P etc. complete /M³.
Proveding and laying mechanically woven double twisted Hexagonal Shaped wire mesh gabion box/ wire crate of size 1.00x1.00x1.00 m. with mesh size 10cmx12cm, 10 SWG G.I. wire i/c all cost of material, labour, T&P etc complete.
Supplying, Laying Dry stone pitching up to 3m height with 60 meters lead of material. i/c cost of all material, labour & T&P etc. complete.
Supplying & filling EC bags with ordinary earth i/c placing in position lead upto 160 M. i/c all labour T&P ect. Complete
Providing, laying & Packing Nylon Rope Crates for filling EC Bags filled with Local earth (size 0.90x0.90x0.90 M), i/c Contractor profit all taxes etc. complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
techsummary_2091819.pdf
BOQ Comparative Chart
xlsx
finsummary_2091819.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.06 MB
BOQ_2091819.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid