Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 2 ARYA NAGAR NARMADA ROAD JABALPUR 482001 | JABALPUR | JABALPUR | MADHYA PRADESH | 482001 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical 7TH FLOOR KALPATARU SYNERGY OPP GRAND HYATT SANTACRUZ EAST MUMBAI 400055 MAHARASHTRA INDIA | MUMBAI | MUMBAI | MAHARASHTRA | 400055 | Rejected-Technical Not Acceptable |
| 4 | Rejected-Technical S 2 TECHNOCRAT INDUSTRIAL ESTATE BALANAGAR HYDERABAD 500 037 TELANGANA INDIA | HYDERABAD | HYDERABAD | TELANGANA | 500037 | Rejected-Technical Not Acceptable |
Tender Value
Refer Docs
EMD Value
₹82.3 L
Closing Date
17 Aug 2020, 3:00 pmClosed
As per NIT
As per NIT
LSTK-1 STANDYBY SULPHUR RECOVERY UNIT (SRU) TRAIN OF 525 TPD ALONG WITH INCINERATOR AND WASTE HEAT EXCHANGER, STACK AND INTERCONNECTING WORKS FOR IOCL PARADIP REFINERY, ODISHA, INDIA
2020_REFHQ_118806_1
080557C/T/SRU/LSTK-1
Global Tenders
Lump Sum TurnKey
750 days
Paradip
As per NIT
5 documents required · 5 mandatory
₹82.3 L
Yes
RHQ, NEW DELHI
24 Nov 2020
15 Jun 2020
18 Aug 2020
15 Jun 2020
17 Aug 2020
11 Aug 2020
15 Jun 2020 - 4 Jul 2020
7 Jul 2020
Amount
Residual Process Design, Detailed Design and Engineering including HAZOP,HAZID,SIL Study & Other Safety Studies as mentioned in Bidding Documents, Project Management, Site enabling jobs, Topography Survey and Soil Investigation, Demolition/Dismantling works mentioned in the bidding document, Procurement (including consumables, special tools and tackles, Pre-Commissioning Spares, Commissioning Spares, Start-up spares & Mandatory spares), Fabrication, Manufacturing, Quality Assurance, Vendor Drawing Review, Inspection & Expediting, Third Party Inspection, Supplies, Transportation, Insurance, Handling & Storage of all Equipment, Materials, items and other Construction Materials at yard/site, Engineering for Construction, Fabrication, Assembly, Construction, Erection, Installation of all plant machinery including civil, Structural, Mechanical, Piping, Electrical and Instrumentation including tie-ins, Testing, Insulation, Painting, Lubricants, Obtaining all Statutory Approvals (except for Environment Clearance), Pre-commissioning & Mechanical Completion of Plant, Preparation of plant specific operating manuals, Start-up, Commissioning and Performance Guarantee Test Runs (PGTR), Training of Owner’s O&M personnel, Contract closure activities of Standby SRU, Incinerator, Waste Heat Exchanger, stack & associated equipment and interconnection systems as per bidding document, Handing over of the facilities with Final and “As Built” documentation, supply of Chemicals, Catalysts (other than free issue), supply of start-up material if any, Tool & Tackles, Consumables, Lubricants, Refrigerants, etc. for initial charge and replenishment of any loss of these during commissioning up to handing over after successful PGTR of the facilities as defined in the bidding documents.
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
Description of Work / Item(s)
Amount
Lumpsum Price for Supply portion for completion of Scope of Work as per Bidding Document
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
Description of Work / Item(s)
Amount
RESIDUAL PROCESS ENGINEERING, DETAIL ENGINEERING AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF BIDDING DOCUMENT
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
LUMPSUM PRICE FOR CONSTRUCTION,INSTALLATION AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF BIDDING DOCUMENT
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
LUMPSUM PRICE FOR START-UP & COMMISSIONING, PGTR, TRAINING PORTION AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF BIDDING DOCUMENT
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
Description of Work / Item(s)
Amount
GST ON SUPPLY OF INDIGENOUS GOODS (PART BREAK-UP OF SP-1 )
Customs Duty on Foreign Component of SP-1
SWS on Customs duty on Foreign Component of SP-1
IGST/ (CGST+SGST) on (Foreign Component of SP-1 + (Customs duty at Sr.2.1 + SWS at 2.2 above))
GST ON SUPPLY OF SERVICES (PART BREAK-UP OF SP-2)
Description of Work / Item(s)
Amount
AMOUNT OF FOREIGN COMPONENT
AMOUNT OF INDIAN COMPONENT
Description of Work / Item(s)
Amount
Annual charges for Post Warranty maintenance for ANALYSERS as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for AMADAS as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for AC UPS as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Description of Work / Item(s)
Amount
GUARANTEED UTILITIES CONSUMPTION FOR LSTK-1 PACKAGE AS PER BIDDING DOCUMENT
GUARANTEED POWER CONSUMPTION
GUARANTEED HP STEAM GENERATION
GUARANTEED LP STEAM GENERATION
GUARANTEED FUEL GAS CONSUMPTION
Toyo Engineering India Private Limited
Toyo Engineering India Private Limited
Toyo Engineering India Private Limited
Bharat Heavy Electricals Ltd.
Bharat Heavy Electricals Ltd.
Bharat Heavy Electricals Ltd.
Bharat Heavy Electricals Ltd.
US Dollar
European Euro
British Pound
Japanese yen
Singapore Dollar
US Dollar
US Dollar
US Dollar
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid