Loading…
Loading…
Tender Value
₹20.1 Cr
EMD Value
₹11.5 L
Closing Date
5 Mar 2026, 3:00 pmClosed
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
SR.DEN/CO
26 conditions · 15 needing a document upload
(a) Attested Certificates(s) issued by Executive or Nominated Authority of the government Departments or Semi-Government/Public Sector Undertakings for the value of the work done for them during the qualifying period including current financial year certifying the bill amounts paid Agreement-wise and Date-wise or attested photo copy of such certificate. Such certificates will be accepted only from Govt. / Govt. bodies / PSUs authorities. Certificates issued by Private Bodies will not be considered.
NOTE: (i) Financial Year shall normally, be reckoned as 1st April to 31st March of the Next Year. However, for Turnover Criteria, the Financial Year as applicable to the Company /Tenderer is to be considered, if it defers from the above. (ii) Current Financial year is reckoned as the incomplete Financial year in which the date of tender submission falls. (iii) Chartered Accountant statements duly indicating yearly receipts will not be considered until and unless backed by Audited Balance Sheets or Provisional Balance sheet. (iv) If the tender is not accompanied by the certificate(s) in support of financial eligibility as above, the tender shall be rejected. No post-tender correspondence will be entertained.
If JV firms are allowed to participate; Financial eligibility of the JV Firm shall be adjudged based on satisfactory fulfillment of the Para No.17.15.2 of J.V guide lines of IRSGCC April - 2022 [with up to date correction slip]
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees; N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. In this reference, fourth previous year shall be considered only if bidder(s) give their consent in Annexure VIB as "previous year is yet to be prepared/ audited". The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/Certificate from Chartered Accountant duly supported by Audited Balance Sheet. Criteria with explanation & Format are attached as a link. ( Click here to download Format)
Tenderer shall carefully read clause No. 10 including clause no. 10.1 to 10.5 of IRGCC April 2022.
(a) The tenderer must have successfully completed or substantially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work costing not less than the amount equal to 60% of advertised value of the tender.
The total value of similar nature of work completed during the qualifying period and not the payments received within qualifying period alone, shall be considered. In case, final Bill of similar nature of work has not been passed and final measurements have not been recorded, the paid amount including statutory deductions will be considered. If final measurements have been recorded and work has been completed with negative variation, then also the paid amount including statutory deductions will be considered. However, if final measurements have been recorded and work has been completed with positive variation but variation has not been sanctioned, original agreement value or last sanctioned agreement value whichever is lower shall be considered for judging eligibility.
In case JV firms are allowed to participate, Technical Eligibility of the JV Firm shall be adjudged based on satisfactory fulfillment of the Para No.17.15.1 of J.V. guide lines of IRSGCC April-2022 [read with up to date correction slip].
The value of work completed will not include the cost of any materials issued free of cost by the Railway/ Department concerned. Price Variation amount, if any; if indicated / incorporated in the experience certificate will also be considered towards eligibility.
Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organization, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates.
The work experience certificate shall be in the name and style of the tenderer participating or as per provisions under Clause 17.15 of GCC April-2022 for JV Firm, if eligible to participate. [with up to date correction slip]
The work experience certificate shall be issued by an officer not below the rank of JA Grade or Bill passing Officer in Railways and Bill passing Officer/Executive In-charge of work in other Govt. / Govt. bodies / PSUs. The certificate should bear the signature and seal of the issuing officer, name of the department etc. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
Similar nature of work:- "Any work involving (a) Construction of bridges including RCC/PSC/Composite; or (b) Any Rehabilitation work of Bridges."
10. Eligibility Criteria: 10.1 Technical Eligibility Criteria: (a) The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited:(i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b) (1) In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited:(i) Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii) One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b)(2)In such cases, what constitutes a component in a composite work shall be clearly predefined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows:The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway.
In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract, with prior approval of Chief Engineer in writing. Note for Item 10.1: Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
84 conditions · 11 needing a document upload
Uploading of Proforma -01 attached with Tender document (Certificate signed by Tenderer and Chartered Accountant), when balance sheet for the first previous year is yet to be prepared/audited. ( Click here to download Format)
(i) The tenderer shall clearly specify whether the tender is submitted on his own (Proprietary Firm) or on behalf of a Partnership Firm / Company / Joint Venture (JV) / Registered Society / Registered Trust / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. The tenderer(s) shall enclose the attested copies of the constitution of their concern, and copy of PAN Card along with their tender. Tender Documents in such cases are to be signed by such persons as may be legally competent to sign them on behalf of the firm, company, association, trust or society, as the case may be. (ii) documents shall be submitted according to clause 14 of IRGCC 2022.
Manual tenders, supporting documents etc., sent by Post/FAX/Courier or in Person SHALL NOT BE ACCEPTED
All requisite documents are to be properly submitted online only and the bidders should ensure that the content of the documents uploaded is distinctly legible /readable. Non-readable documents will not be considered and will not be asked again after tender opening date.
CORRIGENDUM NOTICE ON IREPS: Railway may modify the tender document by issuing online corrigendum through "www.ireps.gov.in" 15 days prior to the tender closing date. For the purpose of CORRIGENDUM in the tender, NIT period is splitted as under: (a) ADVERTISEMENT PERIOD: The time during which all information pertaining to tender shall be available but offers cannot be submitted (b) OFFER SUBMISSION PERIOD: 15 days prior to closing of tender, during which tenderers can submit their offer.
No Technical and Financial credentials are required for tenders having value up to Rs 50 lakh. For tenders valuing more than Rs. 50.00 lakh: The offer of Tenderer(s) who do not enclose Experience Certificate & Turnover Certificate with requisite details, and supporting documents along with their Tender to establish their credentials shall be summarily rejected, even though they are working contractors or contractors on approved list.
The offer shall be evaluated only from the certificates/documents submitted along with the tender offer.
Any Certificate /Documents offered / submitted /received after the tender opening shall not be given any credit and shall not be considered.
Attestation of documents may be self attested or attested by a Gazetted Officer.
Railway reserves the right to verify the authenticity of the documents/information furnished.
IRSGCC para 6.0 of part-I (a)(ii) Tenderers will examine the various provisions of The Central Goods and ServicesTax Act, 2017(CGST)/ Integrated Goods and Services Tax Act, 2017(IGST)/ Union Territory Goods and Services Tax Act, 2017(UTGST)/ respective state's State Goods and Services Tax Act (SGST) also, as notified by Central/State Govt.& as amended from time to time and applicable taxes before bidding. Tenderers will ensure that full benefit of Input Tax Credit (ITC) likely to be availed by them is duly considered while quoting rates. (a)(iii) The successful tenderer who is liable to be registered under CGST/IGST/UTGST/SGST Act shall submit GSTIN along with other details required under CGST/IGST/ UTGST /SGST Act to railway immediately after theaward of contract, without which no payment shall be released to the Contractor. The Contractor shall be responsible for deposition of applicable GST to the concerned authority. (a)(iv) In case the successful tenderer is not liable to be registered under CGST/IGST/UTGST/ SGST Act, the railway shall deduct the applicable GST from his/their bills under reverse charge mechanism (RCM) and deposit the same to the concerned authority. (b) When work is tendered for by a firm or company, the tender shall be signed by the individual legally authorized to enter into commitments on their behalf. (c) The Railway will not be bound by any power of attorney granted by the tenderer or by changes in the composition of the firm made subsequent to the execution of the contract. It may, however, recognize such power of attorney and changes after obtaining proper legal advice, the cost of which will be chargeable to the Contractor.
Increase/decrease of TAXES: if rates of existing GST or cess on GST for Works Contract is increased or any new tax /cess on Works Contract is imposed by Statute after the date of opening of tender but within the original date of completion/date of completion extended under clause 17 & 17A and the Contractor thereupon properly pays such taxes/cess, the Contractor shall be reimbursed the amount so paid. Further, if rates of existing GST or cess on GST for Works Contract is decreased or any tax/cess on Works Contract is decreased / removed by Statute after the date of opening of tender, the reduction in tax amount shall be recovered from Contractor's bills/Security Deposit or any other dues of Contractor with the Government of India.
Fixed Deposit Receipts (FDRs) submitted after award of tender towards Security Deposit/Performance Guarantee should be with automatic renewal facility only.
Tenderer(s) shall note that conditional/alternate offer will not be considered and will summarily be rejected, even though such condition makes them as the lowest tenderer.
Shramik kalyan While processing payment of any 'On Account Bill' or 'Final Bill' or release of 'Advances' or 'Performance Guarantee / Security deposit', contractor shall submit a certificate to the Engineer or Engineer's representatives that "I have uploaded the correct details of contract labours engaged in connection with this contract and payments made to them during the wage period in Railway's Shramikkalyan portal at 'www.shramikkalyan.indianrailways.gov.in' till ____Month, ____Year.
Date of inviting tender shall be the date of publishing tender notice on IREPS website if tender is published on website or the date of publication in newspaper in case tender is not published on website.
A)An offer shall become invalid: - (i) if the Bid Security is not paid Online. (ii) if the offer is not digitally signed by the tenderer / by the Attorney / by the person authorized by the tenderer to sign and submit the tender on his/their behalf. (iii)if any individual/ Proprietor / Partnership Firm / Company /JV Firm/HUF/Society etc. uploads more than one offer either in his/their individual capacity or as a Proprietor or as a Partner/Member of Partnership Firm / JV Firm / HUF / Society etc. or as a Director of any Company, etc. B)An offer shall get summarily rejected if the following documents are not submitted /attached with offer as per the list mentioned in the tender documents: - (i) Documents as applicable in case of Proprietary concern/ Partnership firm / JV Firm / Company/HUF/Society/LLP Firm, etc. (ii) Annexure-V(A) linked under heading submission of Standard Format is to be submitted by the each member in case of a Partnership Firm / Joint Venture (JV) / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc.,. (iii) Ballast test certificate, if applicable. (iv) Any other document required for evaluation of the bid. C)An offer shall get summarily rejected if the tenderer adds any condition on his/their own (anywhere in the e-offer), which is in violation of the Railway's Tender Conditions. D) An offer shall become ineligible for award of the tendered work if the tenderer does not fulfil the Eligibility Conditions, (both the Standard Financial Eligibility Criteria and the Standard Technical Eligibility Criteria) prescribed in the Tender Documents and bid capacity if applicable.
IN CASE OF ADVERTISED TENDER VALUE IS MORE THAN Rs. 10 CRORES, JOINT VENTURE (JV) FIRMS ARE ALSO CONSIDERED FOR ELIGIBILITY.
IN CASE OF ADVERTISED TENDER VALUE IS MORE THAN RS. 20 CRORES: The tender/technical bid will be evaluated based on bid capacity formula detailed as Annexure-VI of IRSGCC April - 2022. NOTE: i)The Tenderer(s) shall furnish the details of existing commitments and balance amount of ongoing works with tenderer as per the prescribed proforma of Railway for statement of all works in progress and also the works which are awarded to tenderer but yet not started up to the of inviting of tender. In case of no works in hand, a 'NIL' statement should be furnished. This statement should be submitted duly verified by Chartered Accountant.(ii) In case, the tenderer/s failed to submit the above statement along with offer, their/his offer shall be considered as incomplete and will be rejected summarily.
IN CASE OF ADVERTISED TENDER VALUE IS MORE THAN RS. 50 CRORES: Electronic Reverse Auction (e-RA) method will be applicable as per guide lines issued by Railway Board vide Lr no. 2017/Trans/01/Policy/Pt-S Dt 28/3/2018. (Copy attached in the list of documents)
Price Variation Clause (PVC) is applicable If the advertised tender value above Rs.2 Crores. (As per letter No. 2022/CEI/GT/GCC2022/Policy dated 14.07.2022) As detailed in - Para 46A of IRGCC April - 2022 attached to the tender in - DOCUMENTS. Base Month: The Base Month for 'Price Variation Clause' shall be taken as the one month prior to closing of tender, unless otherwise stated elsewhere. The quarter for applicability of PVC shall commence from the month following the Base month. The Price Variation shall be based on the average Price Index of the quarter under consideration. [with up to date correction slip/ Railway Board Letter].
The Bid Security shall be deposited either in cash through epayment gateway or submitted as Bank Guarantee bond from a scheduled commercial bank of India or as mentioned in tender documents. The Bank Guarantee bond shall be as per AnnexureVIA and shall be valid for a period of 90days beyond the bid validity period. In case, submission of Bid Security in the form of Bank Guarantee, following shall be ensured: (i).A scanned copy of the Bank Guarantee shall be uploaded on eProcurement Portal (IREPS) while applying to the tender. (ii).The original Bank Guarantee should be delivered to Chief Office Superintendent Rate before closing date for submission of bids i.e., excluding the last date of submission of bids. (ACS-5 dtd 20.10.2023). (iii)Non submission of scanned copy of Bank Guarantee with the bid on etendering portal (IREPS) and/or non submission of original Bank Guarantee within the specified period shall lead to summary rejection of bid. (iv) The Tender Security shall remain valid for a period of 90 days beyond the validity period for the Tender. (v) The details of the BG, physically submitted should match with the details available in the scanned copy and the data entered during bid submission time, failing which the bid will be rejected (vi).The Bank Guarantee shall be placed in an envelope, which shall be sealed. The envelope shall clearly bear the identification "Bid for the ***** Project" and shall clearly indicate the name and address of the Bidder. In addition, the Bid Due Date should be indicated on the right hand top corner of the envelope. (vii)The envelope shall be addressed to the officer and address as mentioned in the tender document. (viii).If the envelope is not sealed and marked as instructed above, the Railway assumes no responsibility for the misplacement or premature opening of the contents of the Bid submitted and consequent losses, if any, suffered by the Bidder.
We fail to submit the requisite Performance Guarantee [P.G] in the prescribed format even after 60 (Sixty days) from the date of issue of Letter of Acceptance, we are aware that the contract liable to be terminated duly forfeiting Bid Security and other dues, if any payable against the contract.
The work shall be maintained after completion for a period of 4 years by the contractor and he shall make good any defects, imperfection shrinkages or faults which may appear at his own cost.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Any firm recognized by Department of Industrial Policy and Promotion (DIPP) as 'Startups' shall be only exempted from payment of Bid Security. Labor Cooperative Societies shall submit only 50% of above Bid Security.
Tenderers are abiding by the General Conditions of Contract (GCC) April-2022 & any statutory modification thereof and also abide to carry out the work accordingly.
Tenderers are requested to visit the web site https//www.ireps.gov.in frequently till the closing date and time for any update.
Tenderer should have to upload only exact & specific, clear and readable documents, irrelevant documents should not be uploaded, and documents uploaded once should not be repeated
As per official Gazette Notification from "The Institute of Chartered Accountants of India( ICAI) (Set up by an Act of Parliament) dated 02/08/2019,Unique Document Identification Number (UDIN) has been made mandatory from 1st July, 2019 for all Audit/Assurance/Attest function.(Official Gazette Notification attached below).'ICAI has conceptualised and implemented an innovative concept called Unique Document Identification Number (UDIN). ICAI at its 379th Council Meeting held on 17th - 18th December, 2018 made generation of UDIN mandatory for every signature of Full time Practising Chartered Accountants in phased manner for the following services: 1) All Certificates with effect from 1st February, 2019 2) GST and Income Tax Audit with effect from 1st April, 2019 3) All Audit and Assurance Functions with effect from 1st July, 2019 Therefore, UDIN is being made mandatory for all Audit and Assurance Functions like Documents and Reports certified / issued by full time Practising Chartered Accountants from 1st July, 2019'.Any document verified by CA but not having UDIN No. (Wherever applicable) shall not be considered.
1)Improvement of Arch Bridges by extending barrel length and construction of Retaining wall, wing wall and ballast retainer on Bridge no 561/2 DN(span 3 x 5.60m), 577/1 DN(span 2 x 6.10m) , 581/1 DN(span 2 x 6.10m) and 587/2 UP&DN(span 5 x 8.10m) in DUD-WD section of Solapur Division. 2)Rebuilding of 04 ORN -3 Bridges ( 536/1A, 589/2, 589/3DN SUR-WD section & 427/3 KWV-MRJ section) in Solapur Division.
05-2026-SrDENCo
05-2026-SrDENCo
Open
Works - General
18 Months
Solapur, Maharashtra
₹0
₹11.5 L
5 Mar 2026
9 Feb 2026
76 items across 2 schedules · ₹22,50,33,908.56 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| in filling in embankment, bunds, around buried type bridge gaps, trolley refuges, etc. with contractor's own conforming to Soil Quality Class after preparation of as applicable, benching in banks wherever required, in layers with motor grader, the moisture content to OMC, compaction to specified n d dressing of bank to final as per RDSO Specifications: IRS-0004 with latest slips. Note: 1) Foundation Benching including earthwork on account of this, required, shall be paid extra relevant schedule item for 2) Payment for Earthwork item shall be made based on section measurements (i) with original ground profile bank based on initial ground doing benching and (ii) final the bank worked out with final per prevailing guidelines. | — | — | — | — | |
| 1 | Class SQ3 | cum | 4500.00 | 306.16 | 13,77,720 |
| portable fencing along running work is to be done in close of track, maintaining during of work and removing after of the work as per direction of Fencing shall consist of self steel angles of size 50mm x 6mm, 1.5m long provided with and embedded in CC 1:2:4 size 0.23m x 0.23m x 0.23m c/c distance of 2m along track. rods in three horizontal layers tack welded with angle posts. Released material will be property contractor after completion of of cement required for CC be paid separately. | — | — | — | — | |
| 2 | of one 50mm wide retro- tape in horizontal direction, secured/tight with vertical posts. | Metre | 2500.00 | 198.4 | 4,96,000 |
| of barricading with contractor's / ballies vertical post of 100mm at every 2m interval, at least 1.5m above ground driven firmly (minimum 0.5m) ground and including painting horizontals with red luminous strips at alternative bay on Barricades shall be maintained out the execution of the work be removed in workman like completion of the work only instruction of Engineer in-Charge. 60% payment shall be made on of barricading at work-site and 40% payment after removal of (2) The released bamboos / shall be the property of the | — | — | — | — | |
| 3 | horizontal bamboo / balli of minimum 50mm dia. spaced | RM | 500.00 | 144.87 | 72,435 |
| in excavation by mechanical (Hydraulic Excavator)/Manual foundations and floors of the retaining walls etc. including dressing of sides, ramming of getting out the excavated back filling in layers with material and consolidation of by ramming and watering etc. all lift, disposal of surplus soil of 300m, all types of shoring with all labour and material as per drawing and technical as directed by Engineer in Note: This item will be used for work in connection with other works also like side drains, for OHE masts and other structures in connection Conversion, Doubling, New | — | — | — | — | |
| 4 | soils | cum | 25000.00 | 199.78 | 49,94,500 |
| 5 | (not requiring blasting) | cum | 7000.00 | 420.29 | 29,42,030 |
| 6 | (blasting prohibited ) | cum | 2000.00 | 636 | 12,72,000 |
| and laying in position Plain concrete of specified Nominal miscellaneous works like side foundation for OHE masts and miscellaneous structures excluding of Cement, centering and - All work up to plinth level : | — | — | — | — | |
| 7 | cement : 2 coarse sand (zone-III) stone aggregate 20 mm size) | cum | 1900.00 | 2,667.2 | 50,67,680 |
| 8 | and laying in position machine machine mixed and machine Cement Concrete of specified per approved Design Mix in Mobile Concrete Plant at site or RMC from plants) using 20mm graded stone aggregate and coarse approved quality in RCC raft & Pile cap including finishing, Plasticiser in approved proportions IS:9103), to modify workability impairing strength and durability as per specifications and of the Engineer in charge. Note: for cement, reinforcement shall be made extra under item. 2. Plasticiser shall be used in approved to increase workability with possible quantity of cement for of Design Mix Concrete unless it approved citing reasons for plasticiser at the stage of Mix in that case deduction shall as per relevant item. | cum | 1400.00 | 2,536.39 | 35,50,946 |
| and laying in position machine machine mixed and machine Cement Concrete of specified per approved Design Mix in Mobile Concrete Plant at site or RMC from plants) using 20mm graded stone aggregate and coarse approved quality for the following cement concrete structural up to height of 9.0 m from top level, including finishing, Plasticiser in approved proportions IS:9103), to modify workability impairing strength and durability as per specifications and of the Engineer in charge. Note: for cement, reinforcement shall be made extra under item. 2. Plasticiser shall be used in approved to increase workability with possible quantity of cement for of Design Mix Concrete unless it approved citing reasons for plasticiser at the stage of Mix in that case deduction shall as per relevant item. | — | — | — | — | |
| 9 | and Return wall | cum | 2100.00 | 2,600.49 | 54,61,029 |
| 10 | slab at formation level, Dirt wall at formation level | cum | 300.00 | 2,568.45 | 7,70,535 |
| 11 | and fixing Weep Holes in Wing walls and Return walls new bridges with 110mm dia Type A ISI marked with all men, material, all taxes as per and as directed by | Metre | 800.00 | 244.14 | 1,95,312 |
| 12 | and casting machine batched, mixed and machine vibrated Concrete of specified grade as Design Mix, mixed in Concrete Batching/Mixing Plant at from approved plants, (Cast in bottom/top slab, side wall and sumps haunch filling thrust bed or any other using 20mm graded crushed aggregate and coarse sand of quality of RCC box of any size finishing, Plasticiser in proportions (as per IS:9103), to workability without impairing and durability, complete as per and technical specifications as by Engineer in charge. Note: 1. for cement, reinforcement and shall be made extra under item. 2. Plasticiser shall be used in approved to increase workability with possible quantity of cement for of Design Mix Concrete unless it approved citing reasons at of Mix Design and in that case shall be made as per relevant | cum | 2700.00 | 2,303 | 62,18,100 |
| 13 | and laying in position machine machine mixed and machine Design Mix Cement Concrete, in Mobile Concrete Plant at site or RMC from plants, of specified grade (cast using 20mm graded crushed aggregate and coarse sand of quality in Drop and curtain wall structures below bed level, in all respect as per drawings technical specifications to the of Engineer-in-Charge. Note: for cement, reinforcement and shall be made extra. | cum | 900.00 | 2,070 | 18,63,000 |
| of precast RCC box segments size and barrel length for line as per approved to the correct alignment and in electrified / non-electrified safeguarding all utilities ( S&T cable, OHE, pipelines etc.) transportation of box segments yard to site of launching, of the existing track, & stacking of ballast, removing dismantling of existing bridge stone masonry / cement including cutting of formation, of Box segments in position base slab or prepared backfilling after launching of box segment and compaction of surcharge, ballasting & re-laying to correct alignment and packing and further till allowing non-stop 20 the re-laid track, complete in as per approved drawing to satisfaction of Engineer-in-charge. all inclusive except the cost of Segments, Base Slabs (if and backfill material which be supplied by railway or under relevant item.Note: Unit here means bridge of span(s) linear waterway up to 3m. | — | — | — | — | |
| 14 | Note: Minimum equipment shall be (i) Crawler mounted excavator of min 200 HP and capacity 2.5 cum - 3 numbers (ii) minimum 150 T capacity - 3 nos., Breaker - 1 no., (iv) Road 20 MT capacity - 1 no., - 2 nos. and (vi) Tractors - 2 Slope Vibratory compactor - 1 other required machineries etc. working condition at site of work. | Each | 1.00 | 7,37,996.76 | 7,37,996.76 |
| 15 | Line Note: Minimum equipment shall be (i) Crawler mounted excavator of min 200 HP and capacity 2.5 cum - 3 numbers (ii) minimum 200 T capacity - 3 nos., Breaker - 1 no., (iv) Road 20 MT capacity - 1 no., - 2 nos. and (vi) Tractors - 2 Slope Vibratory compactor - 2 other required machineries etc. working condition at site of work. | Each | 3.00 | 12,96,674.01 | 38,90,022.03 |
| 16 | and applying two coats of coal bitumen confirming to IS:3117- version on the top and sides of box/slabs @ 1.70 kg/sqm after the surface with all labour and complete job as directed by the | Sqm | 3746.00 | 157.51 | 5,90,032.46 |
| and shuttering including propping etc. and removal of | — | — | — | — | |
| 17 | of bridge sub-structures, e.g. abutment, wing wall, retaining wall, type foundations, Abutment Cap, Inspection Platform & over Pier cap, Fender wall, wall etc. up to 5m above | Sqm | 17500.00 | 329 | 57,57,500 |
| 18 | of bridge super-structures, e.g. I-girders, T-girders, Box girders etc. above ground level. | Sqm | 400.00 | 427.7 | 1,71,080 |
| 19 | additional height over item no. 025032 wherever required adequate bracing, propping etc. height of 5 metres for every height of 1 metre or part | Sqm | 3000.00 | 56.75 | 1,70,250 |
| 20 | and laying in position machine machine mixed and machine Cement Concrete of specified per approved Design Mix in Mobile Concrete Plant at site using 20mm crushed stone aggregate and sand of approved quality in of piers and abutments from foundation up to a height of designed thickness of jacketing finishing, using Plasticiser in proportions (as per IS:9103), to workability without impairing and durability complete as per and direction of the in charge. Note: 1. Payment for reinforcement and shuttering paid extra under relevant item. shall invariably be used in proportion to increase with minimum possible of cement for all grade of Mix Concrete unless it is approved citing reasons for plasticisers at the stage of Mix in that case deduction shall as per relevant item. | cum | 50.00 | 2,711.15 | 1,35,557.5 |
| 025040 for drilling of holes of dowel bars in case of | — | — | — | — | |
| 21 | drilling 32mm dia. holes for anchoring | Metre | 100.00 | 79.14 | 7,914 |
| 22 | inserting of dowel bars of dia. (cost of rods to be paid | Metre | 100.00 | 9.31 | 931 |
| 23 | spreading and compacting hard stone of 63mm average (maximum up to 80mm size) in the foundation of box culverts, including all lead, lift, ascent, etc. complete job as per of Engineer In-charge. | cum | 2110.00 | 1,357.12 | 28,63,523.2 |
| using Cement at Worksite | — | — | — | — | |
| 24 | Portland Cement 53 grade of brands/makes | MT | 3970.00 | 8,100.61 | 3,21,59,421.7 |
| of steel reinforcement of brands/makes for R.C.C. work straightening, cutting, bending, in position and binding all | — | — | — | — | |
| 25 | Thermo-Mechanically Treated bars of Fe-500D or more of approved | Kg | 1100000.00 | 88.9 | 9,77,90,000 |
| 26 | and installation of single/twin of all sizes with or without web section after supporting on temporary girders including pushing scheme, thrust bed, all RCC components, with grade of controlled concrete, it in correct position and below Railway track/Road all measures of track safety by technique" as per approved in all types of soils of surplus earth away from 1 Km, fixing arrangement for & utilities including parapet both sides, wearing course, foot plaques, drainage arrangements all other incidental works to the ROB/RUB/Canal crossing in as per specifications to the of Engineer-in-Charge. Note: rate includes all items of for complete job in all except "cost of Reinforced concrete, cement, reinforcement of (i) main RCC Box; (ii) Bed; (iii) Footpath (iv) Parapet (v) wearing Course only, which paid extra under relevant items (2) The CC Cribs as required Girder shall be supplied at available location. (3) of Temporary Girder to be paid separately under item.. (4) The payment for this be made for the clear inner section area of the parent RCC and barrel length i.e. clear of parent RCC Box/Boxes. | cum | 800.00 | 5,853.05 | 46,82,440 |
| transportation of Precast RCC Slabs / Ballast retainers / Steel etc. from Casting Yard to Site of unloading and stacking at site of prescribed location as directed Engineer-in-Charge up to 60 kms. | — | — | — | — | |
| 27 | Km | MT | 100.00 | 121.58 | 12,158 |
| 28 | km up to 10 km | MT | 100.00 | 151.88 | 15,188 |
| 29 | km up to 15 km | MT | 100.00 | 179.02 | 17,902 |
| 30 | km up to 20 km | MT | 100.00 | 203.97 | 20,397 |
| 31 | km up to 25 km | MT | 100.00 | 227.31 | 22,731 |
| 32 | km up to 30 km | MT | 100.00 | 249.46 | 24,946 |
| 33 | km up to 35 km | MT | 100.00 | 270.68 | 27,068 |
| 34 | km up to 40 km | MT | 100.00 | 291.17 | 29,117 |
| 35 | km up to 60 km | MT | 100.00 | 338.19 | 33,819 |
| transportation of Precast RCC Slabs / Ballast retainers / Steel etc. from Casting Yard to Site of unloading and stacking at site of prescribed location as directed Engineer-in-Charge above 60 kms. | — | — | — | — | |
| 36 | km up to 80 km | MT | 100.00 | 412.23 | 41,223 |
| 37 | km up to 200 km | MT | 100.00 | 843.81 | 84,381 |
| 38 | of stone boulders weighing not 35 kg each at specified bridge | cum | 4100.00 | 853.24 | 34,98,284 |
| 39 | and laying of Apron with concrete blocks cast in-situ and nominal mix of 1:2:4 with all labour, tools and plants. Note: to be made for concrete Cement and shuttering to be | cum | 1200.00 | 2,597.64 | 31,17,168 |
| 40 | and laying Pitching with Stone weighing not less than 35kg voids filled with cement sand on slopes laid over prepared including boulder apron laid front of toe of embankment as per drawing and Technical (filter media to be paid under the relevant item). Rate cost of cement which shall extra under relevant item. | cum | 1200.00 | 2,508.64 | 30,10,368 |
| 41 | and laying Filter Material as per Specifications underneath pitching complete as per drawing and Specification. | cum | 4200.00 | 2,463.29 | 1,03,45,818 |
| 42 | and inserting nipples of size 12 dia. with approved fixing after drilling holes for as per Technical Specifications subsequent cutting/removal of the hole as necessary after of grouting. | Each | 400.00 | 67.62 | 27,048 |
| of masonry/concrete by process duly Sealing of cracks, nipples complete as per Specification and procedure IRBM Para No 209 including admixture. Payment shall be of cement by weight in case cement/cement mortar grouting of Epoxy in case of Epoxy (Cement will be paid extra). | — | — | — | — | |
| 43 | Epoxy Grout | Kg | 2100.00 | 583.07 | 12,24,447 |
| 44 | and laying of filter media of granular materials of GW, groups as per IS:1498 (latest) in profile behind boulder filling of wing walls / return walls etc. level with all labour and complete job as per drawing technical specification of RDSO | cum | 4000.00 | 1,270.88 | 50,83,520 |
| 45 | the HFL mark and Danger level of HFL on bridge abutments with ready mixed paint as per in two coats over one coat of all materials, labour, tools, all lead and lift etc. including complete. | Each | 24.00 | 99.41 | 2,385.84 |
| 46 | cast in situ bridge number as per Railway drawing in concrete 1:2:4 mix using 20mm aggregate embedded in notch in Bridge parapet coping the letter and figures and indicating the direction of flow the top exposed surface mortar 1:3, painting letters with two coats of black paint on two coats of white with all labour, tools, paint etc. with all leads and lifts. | Each | 4.00 | 375.22 | 1,500.88 |
| 47 | Boulder Backing behind wing wall, retaining wall with hand boulders & cobbles with smaller toward the back including lift, labour & other incidental complete work in all respect. for boulder/cobbles will be done | cum | 3600.00 | 166.97 | 6,01,092 |
| 48 | of natural or accumulated any location. Payment to be Horse power of pump multiplied hours. | HP Hour | 97000.00 | 14.42 | 13,98,740 |
| of temporary girder in place of involving dismantling of track, ballast and neatly stacking for excavation & installation of wooden crib at both ends as design in one or more blocks, excavation for creating insertion of girder as required, of girder by contractor's & plants, filling of earth/sand at different stages as linking of track and connecting approaches, ballasting, boxing approach sleepers to make 20 kmph to the satisfaction of in-charge. Note: 1. The CC Cribs and Temporary Girder shall by Railways at available 2. Transportation of Temporary site shall be paid separately relevant item. 3. The charges for sleepers/blocks required for and bearing as per approved be paid extra as per relevant case bridge timber / channel are required to be laid on girder, shall be paid separately under item. | — | — | — | — | |
| 49 | girder of length varying to 16.3m using road crane 50 MT | Each | 3.00 | 83,505.47 | 2,50,516.41 |
| 50 | and using wooden required for matting and per approved design for use above CC Crib for insertion of Girder etc.. Note: The item is time use and released wooden shall be the property of | cum | 100.00 | 1,698.71 | 1,69,871 |
| of temporary girder, crib on and placing temporary girder cess away from Railway track as by engineer at site under traffic filling of Railway's earth by pulling ballast from stack / track / same track, laying track, approach track and packing for opening track at 20 kmph boxing & dressing of cess, ballast etc. Note: If earth is to be contractor from outside, the be paid separately. | — | — | — | — | |
| 51 | girder of length varying to 16.3m using road crane 50 MT | Each | 3.00 | 90,476.26 | 2,71,428.78 |
| of machinery for minor works for short duration operator/driver, fuel, lubricants consumable. The contractor shall statutory permits as required and regulations prevailing in the work. Payment shall be made for working hours at site. | — | — | — | — | |
| 52 | Loaders 3DX Plus or similar 1.10 cum bucket capacity | Hour | 3000.00 | 752.64 | 22,57,920 |
| 53 | with Trolley for local or other misc. works. | Hour | 1000.00 | 199.17 | 1,99,170 |
| Schedule total | ₹21,50,26,163.56 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC-2022-uptoACS10.pdf
PCEcircular207.pdf
PCEcir208.pdf
SafetyrulesatworksiteinElectrifiedsections.pdf
PCSOSafetyCircular.pdf
ProcedureforpaymentofContractorbillasperGSTImplementation_GST_290617.pdf
LETTEROFCREDITASMODEOFPAYMENT062018.pdf
ImplementationofContractore-MeasurementBook.pdf
EMPLOYMNTOFRETIREDRAILWAYOFFICERSCERTIFICATEFORMAT.pdf
DETAILSOFPERSONNELPLANTANDMACHINERYWORKSONHANDFORMATS.pdf
NEFTFORM.pdf
proforma1previousyearbalancesheet.pdf
Proforma3-LCmorethan10Cr.pdf
CECircularno190.pdf
SCCforArchbridgeandorn3bridge.pdf
SafetyatWorksite.pdf
Bidcapacity09thfeb.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .