Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.1 CrAccepted-AOC 104 26 72 D CHANDRALOK COMPLEX BIRHANA ROAD KANPUR KANPUR UTTAR PRADESH 208001 | KANPUR NAGAR | UTTAR PRADESH | 208001 | ₹11.1 Cr Quoted ₹10.9 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹12.1 Cr+₹1.1 Cr (10.4%)Rejected-Finance 104 CHANDRALOK COMPLEX 26 72D BIRHANA ROAD KANPUR NAGAR 208001 UTTAR PRADESH | KANPUR NAGAR | UTTAR PRADESH | 208001 | ₹12.1 Cr+₹1.1 Cr (10.4%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹12.5 Cr+₹1.5 Cr (14.0%)Rejected-Finance NEW CHANDMARI MOTIHARI DISTT EAST CHAMPARAN | ₹12.5 Cr+₹1.5 Cr (14.0%) | L3 | Rejected-Finance Rejected |
| 4 | L4₹12.7 Cr+₹1.8 Cr (16.3%)Rejected-Finance | ₹12.7 Cr+₹1.8 Cr (16.3%) | L4 | Rejected-Finance Rejected |
| 5 | L5₹13.0 Cr+₹2.1 Cr (19.1%)Rejected-Finance | ₹13.0 Cr+₹2.1 Cr (19.1%) | L5 | Rejected-Finance Rejected |
Tender Value
₹17.9 Cr
EMD Value
₹35.8 L
Closing Date
11 Jun 2024, 12:00 pmClosed
Chief Executive Officer, UPRRDA
4TH and 5TH FLOOR, GANNA KISAN SANSTHAN NEW BERRY ROAD, LUCKNOW.
Construction and 5 year Maintenance Works of District- Kanpur Nagar Under FDR Group UPFDR- 207
2024_UPRRD_133496_12
8903/T-251/ UPRRDA/PMGSY-3/23-24 Dt. 28-2-24
Open Tender
CIVIL
Percentage
365 days
Kanpur Nagar
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
₹35.8 L
Chief Executive Officer, UPRRDA
6 Mar 2025
2 Apr 2024
12 Jun 2024
2 Apr 2024
11 Jun 2024
15 Apr 2024
10 Apr 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of Road:- Gangupur Pihani Hilalpur Kharamau To Araul Makanpur road, Pkg No UP 4193 | - | - | - | - |
| - | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. Non thorny jungle) ( By Mechanical Means) | 28,520 | Sqm | 7.01 | ₹1,99,925.2 |
| - | Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 . | 98.96 | Cum | 172.72 | ₹17,092.37 |
| - | Construction of Embankment with approved soil with a lift upto 1.5 m laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet requirement of table 300.1 and 300.2 | 14,031.39 | Cum | 166.7 | ₹23,39,032.71 |
| - | Construction of Embankment with approved soil with a lift upto 1.5 m and lead 1000 mts laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet requirement of table 300.1 and 300.2 | 1,065 | Cum | 241.59 | ₹2,57,293.35 |
| - | Construction of Subgrade and Earthen Shoulder with approved soil with all lifts and leads, laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet at least 100 % procter density complete to specification requirements | 918.42 | Cum | 170.69 | ₹1,56,765.11 |
| - | Construction of Subgrade and Earthen Shoulder with approved soil with all lifts and leads 1000 mts, laying in layers, breaking clods, dressing to required lines, curves, grade and sections, watering and compaction to meet at least 100 % procter density complete to specification requirements | 129.69 | Cum | 245.58 | ₹31,849.27 |
| - | Stabilization of in-situ (existing pavement crust) or soil or otherwise sub base/ base course up to the required depth by cold in-situ recycling using cement and chemical additives / otherwise: Providing pulverizing, spreading, milling and mixing of chemical additives at the appropriate rate as per job mix design in accordance with IRC-SP-72-2015 , IRC-37-2012 & 2018 and IRC SP 89 (part II) 2018. Cementitious additive @ rate of minimum 5 - 7% and CCS/CS additive should be spread on the existing pavement using a mobile truck mounted containerized cement/ additive spreader with micro processor controlled weighing and spreading system. The additive spreader shall have variable working width sufficient to cover whole pavement lane. The in-situ stabilization process shall be carried out by a mobile and self propelled stabilizer / reclaimer of working width of 2.4 m and with minimum engine horse power of 440 kw with a variable working depth up to 50 cm. The resultant stabilized mix then would be profiled to the required grade, level and thickness using motor grader and the mix would be compacted using 20 tonne pad foot roller in combination with smooth wheel roller to achieve desired proctor density as per IRC 37-2012 & 2018 and complete in all respect and curing with water as required including all materials, labour and machinery etc. The entire in-situ process would be carried out in single pass with milling and pulverising of damaged asphalt pavement / soil/ aggregates / soil-aggregate mixture to the desired depth and with simultaneous addition of additives and water with machine integrated spray bars fited on the wheeled self-propelled and vibratory pad foot roller to achieve the desired proctor density in all respects. The tandem roller be followed by Pneumatic Tyre Roller. The minimum unconfined compressive strength (UCS) of stabilized sub base/ base should be 4.5 to 7 MPa after 7 / 28 days of curing as per IRC-SP-72-2015 , IRC-37-2012 & 2018 . Also durability aspects (wet-dry cycles) of stabilized sub base should be satisfied as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The gradation mixes and materials should be as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The train of equipments to be used are binder spreader- water Tanker- Additive Truck- Recycler- Padfoot Roller (20 Tonne) + Single Drum Compactor- Grader- Tandom Roller- Pneumatic Tyre Roller (20 Tonne) | 8,150.83 | Cum | 3,760 | ₹3,06,47,120.8 |
| - | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavater at OMC, and compacting with smooth wheeled roller to achieve the desired density as per clause 401(GSB Grade I) | 273.3 | Cum | 3,587.94 | ₹9,80,584 |
| - | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85 kg/sqm using mechanical means as per Technical Specification Clause 502 | 29,236.42 | Sqm | 43.76 | ₹12,79,385.74 |
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_209453.xls
BOQ Document • 0.46 MB
142884575.pdf
Tender Document • 2.93 MB
SBD_UPFDR_207.pdf
Tender Document • 1.50 MB
142884577.html
Tender Document • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .