Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.4 CrAdmitted-Finance 3RD FLOOR FLAT NO 302 DOOR NO 6 3 347 22 6 SRI DURGA TULASI APARTMENT DWARAKAPURI COLONY PUNJAGUTTA HYDERABAD TELANGANA 500082 | HYDERABAD | HYDERABAD | TELANGANA | 500082 | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | HR SQUARE PRIVATE LIMITED L1 |
|---|---|---|---|---|
| 0.00NOTE:- (Applicable for all parts/items/):- The bidders/contractors are advised to read tender document, all drawings & all corrigendum/ amendments and General conditions of contracts before entry/quoting the rates. | ||||
| 1.00Schedule 'A' Part-I(SOLID WASTE MANAGEMENT WORKS INCLUDING CIVIL WORKS, PLANTS, MACHINERIES, ELECTRICAL, MECHANICAL, AREA DRAINAGE, SEWAGE DISPOSAL, ROADS, PATH, COMPOUND WALL, GATE, FIRE FIGHTING, ETC. WITHIN AND INCLUDING THE PERIPHERY OF COMPOUND WALL) | ||||
| 1.00 | Design, procurement, construction, commissioning, solid waste management plant (at Abohar and Fazilka Mil Stn) for daily guaranteed Acceptable Waste of 2.6 tonnes at 90% probability confidence level and probable future expansion of 25% for 10 years of the contract period (for a population of 6500) with fully automated dirty materials recovery facility (MRF) with AI enabled and PLC controlled screening for handling including all activities relating to sorting, segregation, material recovery, collection, secondary storage, shredding, baling, crushing, loading, unloading, transportation, processing and disposal of solid wastes and monitoring through SCADA and complying the Solid Waste Management Rules, 2016 including creating assets, comprehensive maintenance and service with including consumable materials, chemicals, power, water etc. and shall comprise as under for the scope of works: -
(a) Preparation and finalisation of Detail Project report
(b) The space for stacking of solid waste of minimum 2 days.
(c) Disposal of the waste materials out of the Cantonment/ defence area without any extra cost to the Department and the submission of No Objection Certificate for disposal of the waste materials in case it is asked by the department.
(d) Design, prepare architectural/ structural drawing, fabrication, supply, transportation, erection of shed.
(e) Design, prepare architectural/ structural drawing, supply, transportation, construction, installation of Weigh Bridge.
(f) Design, prepare architectural/ structural drawing, supply, transportation, construction of wash/ change room (both male and female), various storage, processing area, dispatch area, etc.
(g) Design, fabrication, supply, transportation, installation of Solid Waste Management Plant including feeding hooper, conveyor belts, trammel screening machine, magnetic separator, shredder machine, balling machine, organic waste composer, air blower, solid waste incinerator. | 2 | Each Job | 2,85,00,000 ₹5,70,00,000 Lowest |
| 1.00Srl Item No 1.001 Continued...... (h) Standby power back up with Diesel Generator Set and Solar Power Plant as per the discretion of the contractor of suitable capacity. The fuel shall be supplied by the contractor during the operation, maintenance and service period. Diesel Engine Generator Set shall be as per the latest CPCB norms. (i) Electricity supplied by the department shall be charged from the contractor at the rate charged by the concerned State Power Corporation Limited from the department. (j) Design, prepare architectural/ structural drawing, supply, transportation, construction of garages, compound wall of height 2.4 metre, barbed wire fencing of height 0.6 metre above the compound wall, gates, roads, area drainage, sewage disposal, internal electrification, inter water supply, firefighting arrangement, area lighting. (k) Obtain statutory clearance from Government. (l) Maintain, operate, including repairing, replacing, etc. plants and the infrastructure created for 10 years after creating the assets. The contractor shall have full ownership of the materials extracted from solid waste. No royalty shall be charged by the Government. However no compensation shall be paid for lesser quantities of solid waste. (m) The rates quoted are inclusive of operation, comprehensive maintenance and service and the payment schedule shall be as under: - (A) After Finalisation of detail project report- Nil (B) After creating assets - 70% of the quoted amount (As per the Yard stick approved by CE for Interim Payment/ Advance on Account) (C) After creating assets - 70% of the quoted amount (As per the Yard stick approved by CE for intermediate period) (D) After completion of 1 year of comprehensive maintenance: 72% (E) After completion of 2 year of comprehensive maintenance: 74% (F) After completion of 3 year of comprehensive maintenance: 76% (G) After completion of 4 year of comprehensive maintenance: 79% (H) After completion of 5 year of comprehensive maintenance: 82% (I) After completion of 6 year of comprehensive maintenance: 85% | ||||
| 1.00Srl Item No 1.001 Continued...... (J) After completion of 7 year of comprehensive maintenance: 88% (K) After completion of 8 year of comprehensive maintenance: 92% (L) After completion of 9 year of comprehensive maintenance: 96% (M) After completion of 10 year of comprehensive maintenance: 100% (N) The retention money shall be as applicable. (n) Monthly testing solid waste parameters before and after processing from NABL approved lab. | ||||
| 1.00 | Design, procurement, construction, commissioning, solid waste management plant (at Lalgarh Jattan and Sri Ganganagar Mil Stn) for daily guaranteed Acceptable Waste of 6.4 tonnes at 90% probability confidence level and probable future expansion of 25% for 10 years of the contract period (for a population of 16000) with fully automated dirty materials recovery facility (MRF) with AI enabled and PLC controlled screening for handling including all activities relating to sorting, segregation, material recovery, collection, secondary storage, shredding, baling, crushing, loading, unloading, transportation, processing and disposal of solid wastes and monitoring through SCADA and complying the Solid Waste Management Rules, 2016 including creating assets, comprehensive maintenance and service with including consumable materials, chemicals, power, water etc. and shall comprise as under for the scope of works: -
(a) Preparation and finalisation of Detail Project report
(b) The space for stacking of solid waste of minimum 2 days.
(c) Disposal of the waste materials out of the Cantonment/ defence area without any extra cost to the Department and the submission of No Objection Certificate for disposal of the waste materials in case it is asked by the department.
(d) Design, prepare architectural/ structural drawing, fabrication, supply, transportation, erection of shed.
(e) Design, prepare architectural/ structural drawing, supply, transportation, construction, installation of Weigh Bridge.
(f) Design, prepare architectural/ structural drawing, supply, transportation, construction of wash/ change room (both male and female), various storage, processing area, dispatch area, etc.
(g) Design, fabrication, supply, transportation, installation of Solid Waste Management Plant including feeding hooper, conveyor belts, trammel screening machine, magnetic separator, shredder machine, balling machine, organic waste composer, air blower, solid waste incinerator. | 2 | Each Job | 3,00,00,000 ₹6,00,00,000 Lowest |
| 1.00Srl Item No 1.002 Continued...... (h) Standby power back up with Diesel Generator Set and Solar Power Plant as per the discretion of the contractor of suitable capacity. The fuel shall be supplied by the contractor during the operation, maintenance and service period. Diesel Engine Generator Set shall be as per the latest CPCB norms. (i) Electricity supplied by the department shall be charged from the contractor at the rate charged by the concerned State Power Corporation Limited from the department. (j) Design, prepare architectural/ structural drawing, supply, transportation, construction of garages, compound wall of height 2.4 metre, barbed wire fencing of height 0.6 metre above the compound wall, gates, roads, area drainage, sewage disposal, internal electrification, inter water supply, firefighting arrangement, area lighting. (k) Obtain statutory clearance from Government. (l) Maintain, operate, including repairing, replacing, etc. plants and the infrastructure created for 10 years after creating the assets. The contractor shall have full ownership of the materials extracted from solid waste. No royalty shall be charged by the Government. However no compensation shall be paid for lesser quantities of solid waste. (m) The rates quoted are inclusive of operation, comprehensive maintenance and service and the payment schedule shall be as under: - (A) After Finalisation of detail project report- Nil (B) After creating assets - 70% of the quoted amount (As per the Yard stick approved by CE for Interim Payment/ Advance on Account) (C) After creating assets - 70% of the quoted amount (As per the Yard stick approved by CE for intermediate period) (D) After completion of 1 year of comprehensive maintenance: 72% (E) After completion of 2 year of comprehensive maintenance: 74% (F) After completion of 3 year of comprehensive maintenance: 76% (G) After completion of 4 year of comprehensive maintenance: 79% (H) After completion of 5 year of comprehensive maintenance: 82% | ||||
| 1.00Srl Item No 1.002 Continued...... (I) After completion of 6 year of comprehensive maintenance: 85% (J) After completion of 7 year of comprehensive maintenance: 88% (K) After completion of 8 year of comprehensive maintenance: 92% (L) After completion of 9 year of comprehensive maintenance: 96% (M) After completion of 10 year of comprehensive maintenance: 100% (N) The retention money shall be as applicable. (n) Monthly testing solid waste parameters before and after processing from NABL approved lab. | ||||
| 1.00 | Design, procurement, construction, commissioning, solid waste management plant (at Faridkot Mil Stn) for daily guaranteed Acceptable Waste of 3.0 tonnes at 90% probability confidence level and probable future expansion of 25% for 10 years of the contract period (for a population of 7500) with fully automated dirty materials recovery facility (MRF) with AI enabled and PLC controlled screening for handling including all activities relating to sorting, segregation, material recovery, collection, secondary storage, shredding, baling, crushing, loading, unloading, transportation, processing and disposal of solid wastes and monitoring through SCADA and complying the Solid Waste Management Rules, 2016 including creating assets, comprehensive maintenance and service with including consumable materials, chemicals, power, water etc. and shall comprise as under for the scope of works: -
(a) Preparation and finalisation of Detail Project report
(b) The space for stacking of solid waste of minimum 2 days.
(c) Disposal of the waste materials out of the Cantonment/ defence area without any extra cost to the Department and the submission of No Objection Certificate for disposal of the waste materials in case it is asked by the department.
(d) Design, prepare architectural/ structural drawing, fabrication, supply, transportation, erection of shed.
(e) Design, prepare architectural/ structural drawing, supply, transportation, construction, installation of Weigh Bridge.
(f) Design, prepare architectural/ structural drawing, supply, transportation, construction of wash/ change room (both male and female), various storage, processing area, dispatch area, etc.
(g) Design, fabrication, supply, transportation, installation of Solid Waste Management Plant including feeding hooper, conveyor belts, trammel screening machine, magnetic separator, shredder machine, balling machine, organic waste composer, air blower, solid waste incinerator. | 1 | Each Job | 2,85,00,000 ₹2,85,00,000 Lowest |
| 1.00Srl Item No 1.003 Continued...... (h) Standby power back up with Diesel Generator Set and Solar Power Plant as per the discretion of the contractor of suitable capacity. The fuel shall be supplied by the contractor during the operation, maintenance and service period. Diesel Engine Generator Set shall be as per the latest CPCB norms. (i) Electricity supplied by the department shall be charged from the contractor at the rate charged by the concerned State Power Corporation Limited from the department. (j) Design, prepare architectural/ structural drawing, supply, transportation, construction of garages, compound wall of height 2.4 metre, barbed wire fencing of height 0.6 metre above the compound wall, gates, roads, area drainage, sewage disposal, internal electrification, inter water supply, firefighting arrangement, area lighting. (k) Obtain statutory clearance from Government. (l) Maintain, operate, including repairing, replacing, etc. plants and the infrastructure created for 10 years after creating the assets. The contractor shall have full ownership of the materials extracted from solid waste. No royalty shall be charged by the Government. However no compensation shall be paid for lesser quantities of solid waste. (m) The rates quoted are inclusive of operation, comprehensive maintenance and service and the payment schedule shall be as under: - (A) After Finalisation of detail project report- Nil (B) After creating assets - 70% of the quoted amount (As per the Yard stick approved by CE for Interim Payment/ Advance on Account) (C) After creating assets - 70% of the quoted amount (As per the Yard stick approved by CE for intermediate period) (D) After completion of 1 year of comprehensive maintenance: 72% (E) After completion of 2 year of comprehensive maintenance: 74% (F) After completion of 3 year of comprehensive maintenance: 76% (G) After completion of 4 year of comprehensive maintenance: 79% (H) After completion of 5 year of comprehensive maintenance: 82% (I) After completion of 6 year of comprehensive maintenance: 85% | ||||
Tender Value
₹16.5 Cr
EMD Value
₹11.5 L
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Chief Engineer Bathinda Zone
Headquarters Chief Engineer Bathinda Zone Military Engineer Services PIN- 900484 C/o 56 APO
PROVISION OF SOLID WASTE MANAGEMENT WORKS AT VARIOUS STNS UNDER AOR OF CWE SRIGANGANAGAR
2025_MES_746392_1
84551 CA NO CE BTZ/SGNR/TOKEN-57 OF 2025-26
Open Tender
Civil Works
Lump-sum
4015 days
GE Sriganganagar
As per Notice Inviting Tender (NIT)
8 documents required · 8 mandatory
₹3,000
GE Sriganganagar
₹11.5 L
Yes
HQ Chief Engineer Bathinda Zone
3 Mar 2026
27 Dec 2025
2 Feb 2026
27 Dec 2025
31 Jan 2026
24 Jan 2026
27 Dec 2025 - 31 Jan 2026
9 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Schedule 'A' Part-I(SOLID WASTE MANAGEMENT WORKS INCLUDING CIVIL WORKS, PLANTS, MACHINERIES, ELECTRICAL, MECHANICAL, AREA DRAINAGE, SEWAGE DISPOSAL, ROADS, PATH, COMPOUND WALL, GATE, FIRE FIGHTING, ETC. WITHIN AND INCLUDING THE PERIPHERY OF COMPOUND WALL) | |||||
| 0.9999 | Design, procurement, construction, commissioning, solid waste management facility for daily guaranteed Acceptable Waste of 2.6 tonnes at 90% probability confidence level and probable future expansion of 25% for 10 years of the contract period (for a population of 6500) with fully automated dirty materials recovery facility (MRF) with AI enabled and PLC controlled screening for handling including all activities relating to sorting, segregation, material recovery, collection, secondary storage, shredding, baling, crushing, loading, unloading, transportation, processing and disposal of solid wastes and monitoring through SCADA and complying the Solid Waste Management Rules, 2016 including creating assets, operation, maintenance and service for 10 years and shall comprise as under: -
(a) Preparation and finalisation of Detail Project report
(b) The space for stacking of solid waste of minimum 2 days.
(c) Disposal of the waste materials out of the Cantonment/ defence area without any extra cost to the Department and the submission of No Objection Certificate for disposal of the waste materials in case it is asked by the department.
(d) Design, prepare architectural/ structural drawing, fabrication, supply, transportation, erection of pre-engineered shed.
(e) Design, prepare architectural/ structural drawing, supply, transportation, construction, installation of Weigh Bridge.
(f) Design, prepare architectural/ structural drawing, supply, transportation, construction of Admin Block with conference room, Guard House, Wash room (both male and female), change room (both male and female), rest room, various storage, processing are, dispatch area, etc.
(g) Design, fabrication, supply, transportation, installation of Solid Waste Management Plant including feeding hooper, conveyor belts, trammel screening machine, magnetic separator, shredder machine, balling machine, organic waste composer, air blower, solid waste incinerator. | 2 | Each Job | - | - |
| 0.3999 | Srl Item No 1.001 Continued......
(h) Design, supply, transportation, installation, commission and testing of Diesel Engine Generator Set. The fuel shall be supplied by the contractor during the operation, maintenance and service period.
(i) Design, prepare architectural/ structural drawing, supply, transportation, construction of garages, compound wall of height 2.4 metre, barbed wire fencing of height 0.6 metre above the compound wall, gates, roads, area drainage, sewage disposal, internal electrification, inter water supply, firefighting arrangement, area lighting.
(j) Obtain statutory clearance from Government.
(k) Maintain, operate, including repairing, replacing, etc. plants and the infrastructure created for 10 years after creating the assets. The contractor shall have full ownership of the materials extracted from solid waste. No royalty shall be charged by the Government.
(l) The contractor shall bear the cost of electricity at prevailing rates however the electricity shall be supplied by the department
(m) The rates quoted are inclusive of comprehensive maintenance and the payment schedule shall be as under: -
(i) After Finalisation of detail project report- Nil
(ii) After creating assets - 70% of the quoted amount (As per the Yard stick approved by CWE for intermediate period)
(iii) After completion of 1 year of comprehensive maintenance: 72%
(iv) After completion of 2 year of comprehensive maintenance: 74%
(v) After completion of 3 year of comprehensive maintenance: 76%
(vi) After completion of 4 year of comprehensive maintenance: 79%
(vii) After completion of 5 year of comprehensive maintenance: 82%
(viii) After completion of 6 year of comprehensive maintenance: 85%
(ix) After completion of 7 year of comprehensive maintenance: 88%
(x) After completion of 8 year of comprehensive maintenance: 92%
(xi) After completion of 9 year of comprehensive maintenance: 96% | - | - | - | - |
| 0.7999 | Srl Item No 1.001 Continued......
(xii) After completion of 10 year of comprehensive maintenance: 100%
The retention money shall be as applicable. | - | - | - | - |
| 0.0000 | Design, procurement, construction, commissioning, solid waste management facility for daily guaranteed Acceptable Waste of 6.4 tonnes at 90% probability confidence level and probable future expansion of 25% for 10 years of the contract period (for a population of 16000) with fully automated dirty materials recovery facility (MRF) with AI enabled and PLC controlled screening for handling including all activities relating to sorting, segregation, material recovery, collection, secondary storage, shredding, baling, crushing, loading, unloading, transportation, processing and disposal of solid wastes and monitoring through SCADA and complying the Solid Waste Management Rules, 2016 including creating assets, operation, maintenance and service for 10 years and shall comprise as under: -
(a) Preparation and finalisation of Detail Project report
(b) The space for stacking of solid waste of minimum 2 days.
(c) Disposal of the waste materials out of the Cantonment/ defence area without any extra cost to the Department and the submission of No Objection Certificate for disposal of the waste materials in case it is asked by the department.
(d) Design, prepare architectural/ structural drawing, fabrication, supply, transportation, erection of pre-engineered shed.
(e) Design, prepare architectural/ structural drawing, supply, transportation, construction, installation of Weigh Bridge.
(f) Design, prepare architectural/ structural drawing, supply, transportation, construction of Admin Block with conference room, Guard House, Wash room (both male and female), change room (both male and female), rest room, various storage, processing are, dispatch area, etc.
(g) Design, fabrication, supply, transportation, installation of Solid Waste Management Plant including feeding hooper, conveyor belts, trammel screening machine, magnetic separator, shredder machine, balling machine, organic waste composer, air blower, solid waste incinerator. | 1 | Each Job | - | - |
| 0.3999 | Srl Item No 1.002 Continued......
(h) Design, supply, transportation, installation, commission and testing of Diesel Engine Generator Set. The fuel shall be supplied by the contractor during the operation, maintenance and service period.
(i) Design, prepare architectural/ structural drawing, supply, transportation, construction of garages, compound wall of height 2.4 metre, barbed wire fencing of height 0.6 metre above the compound wall, gates, roads, area drainage, sewage disposal, internal electrification, inter water supply, firefighting arrangement, area lighting.
(j) Obtain statutory clearance from Government.
(k) Maintain, operate, including repairing, replacing, etc. plants and the infrastructure created for 10 years after creating the assets. The contractor shall have full ownership of the materials extracted from solid waste. No royalty shall be charged by the Government.
(l) The contractor shall bear the cost of electricity at prevailing rates however the electricity shall be supplied by the department
(m) The rates quoted are inclusive of comprehensive maintenance and the payment schedule shall be as under: -
(i) After Finalisation of detail project report- Nil
(ii) After creating assets - 70% of the quoted amount (As per the Yard stick approved by CWE for intermediate period)
(iii) After completion of 1 year of comprehensive maintenance: 72%
(iv) After completion of 2 year of comprehensive maintenance: 74%
(v) After completion of 3 year of comprehensive maintenance: 76%
(vi) After completion of 4 year of comprehensive maintenance: 79%
(vii) After completion of 5 year of comprehensive maintenance: 82%
(viii) After completion of 6 year of comprehensive maintenance: 85%
(ix) After completion of 7 year of comprehensive maintenance: 88%
(x) After completion of 8 year of comprehensive maintenance: 92%
(xi) After completion of 9 year of comprehensive maintenance: 96% | - | - | - | - |
| 0.7999 | Srl Item No 1.002 Continued......
(xii) After completion of 10 year of comprehensive maintenance: 100%
The retention money shall be as applicable. | - | - | - | - |
| 0.9999 | Design, procurement, construction, commissioning, solid waste management facility for daily guaranteed Acceptable Waste of 11.8 tonnes at 90% probability confidence level and probable future expansion of 25% for 10 years of the contract period (for a population of 29500) with fully automated dirty materials recovery facility (MRF) with AI enabled and PLC controlled screening for handling including all activities relating to sorting, segregation, material recovery, collection, secondary storage, shredding, baling, crushing, loading, unloading, transportation, processing and disposal of solid wastes and monitoring through SCADA and complying the Solid Waste Management Rules, 2016 including creating assets, operation, maintenance and service for 10 years and shall comprise as under: -
(a) Preparation and finalisation of Detail Project report
(b) The space for stacking of solid waste of minimum 2 days.
(c) Disposal of the waste materials out of the Cantonment/ defence area without any extra cost to the Department and the submission of No Objection Certificate for disposal of the waste materials in case it is asked by the department.
(d) Design, prepare architectural/ structural drawing, fabrication, supply, transportation, erection of pre-engineered shed.
(e) Design, prepare architectural/ structural drawing, supply, transportation, construction, installation of Weigh Bridge.
(f) Design, prepare architectural/ structural drawing, supply, transportation, construction of Admin Block with conference room, Guard House, Wash room (both male and female), change room (both male and female), rest room, various storage, processing are, dispatch area, etc.
(g) Design, fabrication, supply, transportation, installation of Solid Waste Management Plant including feeding hooper, conveyor belts, trammel screening machine, magnetic separator, shredder machine, balling machine, organic waste composer, air blower, solid waste incinerator. | 1 | Each Job | - | - |
| 0.3999 | Srl Item No 1.003 Continued......
(h) Design, supply, transportation, installation, commission and testing of Diesel Engine Generator Set. The fuel shall be supplied by the contractor during the operation, maintenance and service period.
(i) Design, prepare architectural/ structural drawing, supply, transportation, construction of garages, compound wall of height 2.4 metre, barbed wire fencing of height 0.6 metre above the compound wall, gates, roads, area drainage, sewage disposal, internal electrification, inter water supply, firefighting arrangement, area lighting.
(j) Obtain statutory clearance from Government.
(k) Maintain, operate, including repairing, replacing, etc. plants and the infrastructure created for 10 years after creating the assets. The contractor shall have full ownership of the materials extracted from solid waste. No royalty shall be charged by the Government.
(l) The contractor shall bear the cost of electricity at prevailing rates however the electricity shall be supplied by the department
(m) The rates quoted are inclusive of comprehensive maintenance and the payment schedule shall be as under: -
(i) After Finalisation of detail project report- Nil
(ii) After creating assets - 70% of the quoted amount (As per the Yard stick approved by CWE for intermediate period)
(iii) After completion of 1 year of comprehensive maintenance: 72%
(iv) After completion of 2 year of comprehensive maintenance: 74%
(v) After completion of 3 year of comprehensive maintenance: 76%
(vi) After completion of 4 year of comprehensive maintenance: 79%
(vii) After completion of 5 year of comprehensive maintenance: 82%
(viii) After completion of 6 year of comprehensive maintenance: 85%
(ix) After completion of 7 year of comprehensive maintenance: 88%
(x) After completion of 8 year of comprehensive maintenance: 92%
(xi) After completion of 9 year of comprehensive maintenance: 96% | - | - | - | - |
| 0.7999 | Srl Item No 1.003 Continued......
(xii) After completion of 10 year of comprehensive maintenance: 100%
The retention money shall be as applicable. | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_835779.xls
BOQ • 0.30 MB
84551TenderDocumentsComplete.pdf
Tender Documents • 1.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .