Loading…
Loading…
Tender Value
₹8.1 L
EMD Value
₹81,100
Closing Date
16 Jun 2026, 1:00 pm
EXECUTIVE OFFICER
NPP MAU
WARD NO 02 BHITI KE NEW BALAJI NAGAR ME LAAL JI YADAV KE MAAN SE ANIL PANDEY KE MAKAN SE DEEPAK KUMAR BARNWAL KE MAKAN TAK NALI WA INTERLOCKING KA KARYA
2026_DOLBU_1131400_2
68-298
Open Tender
Civil Works
120 days
work
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,040
EXECUTIVE OFFICER
₹81,100
Yes
4 Jun 2026
4 Jun 2026
16 Jun 2026
4 Jun 2026
16 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W filling in embankment with cartage soil
up to 8.00 km distances etc com. | 7.09 | CUM | 301 | ₹2,134.09 |
| 2 | E/W in Excavation in ordenery soil in
foudation including labour and matrials
and T/P with all com. Work SI No. 251 | 47.9 | CUM | 115 | ₹5,508.5 |
| 3 | C.C. Work in 1:6:12 in cement, fine sand
and 40 mm Gauge Brick Ballast including
labour and matrials , T/P with all com. | 8.06 | CUM | 3,250 | ₹26,195 |
| 4 | M-150 B/W in 1:4 in cement and coar sand
mortar including labour and matrials , T/P
with all com. Work SI No.305 | 26.01 | CUM | 4,980 | ₹1,29,529.8 |
| 5 | 12mm thick Plaster work in 1:3 in cement
and fine sand mortar including labour and
matrials, T/P with all com. Work SI No.583 | 89.1 | SQM | 189 | ₹16,839.9 |
| 6 | R.C.C. Work in 1:1.5:3 in cement coarse
sand and 20mm gauge including labour
and matrials, T/P with all com. Work SI
No.285 | 0.6 | CUM | 9,430 | ₹5,658 |
| 7 | MS work in R.C.C. work including
labour and matrials , T/P with all com.
Work SI No.504 | 0.47 | QTL | 5,650 | ₹2,655.5 |
| 8 | Providing laying WBM Grade-3 with 22.4 -53mm size Stone Ballast spreading and compacting stone aggregates of specific Sizes to Water bound macadam Specification including spreading in uniform thickness hand packing rolling with there wheeled static roller 8-10 tonnes in stages to proper grade and | 34.43 | CUM | 4,149.77 | ₹1,42,876.58 |
| 9 | P /L of 80 mm thick rubber moulded
interlocking cement concrete Paver
blocks,Work SI No. | 344.25 | SQM | 750 | ₹2,58,187.5 |
| 10 | PCC Work in 1:2:4 in cement, Coarse sand and 20 mm GaugeStone grit including labour and materials, T/P with all com Work SI No. 279(B) | 2.67 | CUM | 6,990 | ₹18,663.3 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.43 MB
tech6801.pdf
Tender Documents • 6.53 MB
BOQ_2166519.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid