| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance SOLAKKALIPALAYAM PERIYA VATTAM POST KODUMUDI VIA ERODE | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 Cr+₹5.5 L (3.43%)Admitted-Finance NO 5 8 KANKATTI ALA PERIYAKUTTY MADUVU POST VAZHAPPADI TALUK SALEM 636101 | SALEM | SALEM | TAMIL NADU | 636101 | ₹1.6 Cr+₹5.5 L (3.43%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | K T R AND CO L1 | Selliamman constructions L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all kinds of soils and sub soils to full depth as directed by the departmental officers except hard rock requiring blasting inclusive of shoring strutting and balling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated and depositing the surplus earth with in the compound in places shown by the departmental officers with initial lead of 10 meters and initial lift of 2 meters including clearing leveling the site etc., complete complying with standard specification (TNDSS No. 23, 24) | 1,920 | M3 | 77.2 ₹1,48,233.6 Lowest | 81.5 ₹1,56,480 |
| 2.00 | Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 1,440 | M3 | 2,031.14 ₹29,24,838.72 Lowest | 2,150 ₹30,96,000 |
| 3.00 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications | 9,575 | M2 | 66.14 ₹6,33,305.82 Lowest | 70 ₹6,70,250 |
| 4.00 | Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications | 9,575 | M2 | 12.94 ₹1,23,927.31 Lowest | 15 ₹1,43,625 |
| 5.00 | Providing and laying tack coat of 2 kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications | 13,352 | M2 | 19.39 ₹2,58,868.04 Lowest | 20 ₹2,67,040 |
| 6.00Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by | |||||
| 6.01 | Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 Specification | 605 | M3 | 8,710.41 ₹52,69,798.66 Lowest | 9,150 ₹55,35,750 |
| 7.00Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below with 45.27kgs of VG30 / VG40 bitumen and 5.03Kg of plastic waste (50.30*10%=5.03Kg) for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / | |||||
| 7.01 | Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5. TH Rev-5 specifications. | 688 | M3 | 8,901.46 ₹61,24,201.73 Lowest | 9,350 ₹64,32,800 |
| 8.00 | Raising the UGSS manhole cover upto proposed road level refixing the same over the cement concrete surface to an average height of 0.15 meter to 0.25 meter plain cement concrete 1:2:4 (one cement, two sand and four aggregate) mix using 20 mm HBG ISS metal including cost and conveyance of all materials to site, cost of centering and all labour charges for removing and refixing man hole cover etc., complete as directed by the departmental officer. | 115 | Nos | 2,598.01 ₹2,98,770.92 | 130 ₹14,950 Lowest |
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
25 Feb 2021, 3:00 pmClosed
THE COMMISSIONER, ERODE CITY MUNICIPAL CORPORATION
246, MEENAKSHI SUNDARANAR SALAI, ERODE
Restoration of B.T Road Damaged Due to UGSS and water supply scheme at Iraniyan street in ward no 34, Rajaji street-1,2, 3 in ward no.36, Muthampalayam Housing Unit Phase-III in ward no.37, Kumaran street in ward no-40, Periyar nagar
2021_MAWS_197855_1
E1-535-2021-3.ERODE CITY MUNICIPAL CORPORATION.
Open Tender
Civil Works - Roads
Works
120 days
ERODE CITY MUNICIPAL CORPORATION
Please refer Tender documents.
16 documents required · 16 mandatory
₹0
₹1.5 L
ERODE CITY MUNICIPAL CORPORATION
2 Jul 2021
20 Feb 2021
26 Feb 2021
20 Feb 2021
25 Feb 2021
20 Feb 2021
22 Feb 2021
Amount
Earth work excavation for foundation in all kinds of soils and sub soils to full depth as directed by the departmental officers except hard rock requiring blasting inclusive of shoring strutting and balling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated and depositing the surplus earth with in the compound in places shown by the departmental officers with initial lead of 10 meters and initial lift of 2 meters including clearing leveling the site etc., complete complying with standard specification (TNDSS No. 23, 24)
Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications
Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications
Providing and laying tack coat of 2 kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by
Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 Specification
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below with 45.27kgs of VG30 / VG40 bitumen and 5.03Kg of plastic waste (50.30*10%=5.03Kg) for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory /
Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5. TH Rev-5 specifications.
Raising the UGSS manhole cover upto proposed road level refixing the same over the cement concrete surface to an average height of 0.15 meter to 0.25 meter plain cement concrete 1:2:4 (one cement, two sand and four aggregate) mix using 20 mm HBG ISS metal including cost and conveyance of all materials to site, cost of centering and all labour charges for removing and refixing man hole cover etc., complete as directed by the departmental officer.
Conveyance of excess excavated and surpluse earth to low laying areas upto 3 km lead including loading , unloading charges and cost of transportion charges, including cost of all labours charges etc complete
Selliamman constructions
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_236315.xls
BOQ • 0.29 MB
3.pdf
Tender Documents • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .