Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L1₹4.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L1₹4.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L1₹4.2 LAdmitted-Fee/PreQual/Technical/Finance AT CHUNNATI PO KUPARI PS KHAIRA DIST BALASORE | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L1₹4.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.2 L
EMD Value
₹4,201
Closing Date
14 Aug 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION NO.II, BALASORE
S/R to R.I. Office Cum-Residence at Bishnupur_building for 2026-27 - 42/6651
2026_CERWI_137406_1
E-TCN No4 of 2026-27-9
Open Tender
Civil Works - Buildings
Percentage
30 days
Balasore
2 documents required · 2 mandatory
₹2,000
₹4,201
Yes
21 Aug 2026
1 Aug 2026
17 Aug 2026
1 Aug 2026
14 Aug 2026
1 Aug 2026
1 Aug 2026 - 13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling and removing 2.5 cm grading concrete from roof slab cleaning the surface lowering & removing the debris within 50 meter lead including cost of all labour, T&P etc. required complete as directed by the Engineer- in- Charge. | 1 | Sqm | 132.64 | ₹132.63 |
| 2 | 2.5 cm thick grading concrete (1:2:2) on Roof slab with 6 mm size hard broken granite chips on new works | 1 | Sqm | 417.56 | ₹417.52 |
| 3 | Distempering 2-coat to walls with distemper of approved shade on old/new work to give on even shade excluding cost of distemper. | - | Sqm | 89.26 | - |
| 4 | Finishing wall surface with weather coat painting 2 coat to the old surfaces of walls with all cost. (Data for 10Sqm.) | 1 | Sqm | 98.69 | ₹98.68 |
| 5 | Painting 2-coats with any approved paint on new wood work including cost of materials. | 1 | Sqm | 187.87 | ₹187.85 |
| 6 | Single Under ream Pile foundation with RCC-M20 using 12mm size black hard granite chips including cost of boring but excluding cost of MS/Tor steel and labour charges for cutting , bending and binding of steel. | - | Nos | 2,328.42 | - |
| 7 | Earth work excavation in foundation of hard soil or gravelly soil within 50 m initial lead & 1.5m initial lift including rough dressing and breaking clods to maximum 5 cm to 7cm, laying in layers to exceeding 0.3m in depth and as per direction of the department. | - | Cum | 282.89 | - |
| 8 | Supplying and filling in foundation & plinth with approved quality sand watered and rammed. | 1 | Cum | 1,427.07 | ₹1,426.93 |
| 9 | Providing and laying plain cement concrete 1: 3 : 6 using 40 mm size metal etc & all complete. | - | Cum | 6,894.94 | - |
| 10 | RCC work of M-25 grade with 20mm & down-grade size black hard granite(crusher broken) chips including hoisting&laying.(Data for 15 cum.Pile Cape | - | Cum | 7,756.82 | - |
stage.html
html • 0.06 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_3.pdf
PDF • 0.64 MB
Tendernotice_2.pdf
PDF • 2.21 MB
Tendernotice_1.pdf
PDF • 1.39 MB
BOQ_603775.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .