Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance SALEM | SALEM | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical EMD Condition not Statisfied |
Tender Value
Refer Docs
EMD Value
₹4,200
Closing Date
23 Mar 2023, 2:00 pmClosed
SE-ES
SUPERINTENDING ENGINEER/ ELECTRICAL SYSTEM, NCTPS-I, CHENNAI-120
NCTPS I ES Circle EM I Division S Dn IV Rewinding and Replacement of rotor shaft and Dynamic balancing of 3 phase 415V 150 KW Instrument Air Compressor motor 1No Repair and rewinding of 3 phase 415 V 55 KW Sea Water Booster pump motor 2 N
2023_EB_294078_1
SE ES NCTPS I WC No 130 2022 23
Open Tender
Power/Energy Projects/Products
Works
45 days
NCTPS-I
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹4,200
Yes
5 Apr 2023
9 Mar 2023
24 Mar 2023
9 Mar 2023
23 Mar 2023
9 Mar 2023
Amount
Labour Charges for Rewinding of 150 KW Instrument Air compressor motor.
Labour Charges for replacement of rotor shaft of 150 KW instrument Air Compressor motor including preparing the rotor by removing the core locks by machining the welding removing old shaft from the rotor core using hydraulic press, Conducting UT testing of new material to rule out any internal defects, Heat treating to stress- relieving of material in the furnace, Machining the new material to required dimensions, grinding and polishing the surface of entire shaft, Cutting the key ways for core length, coupling length outer fan surface placing the core assembly in the hydraulic press and inserting the core with shaft by providing lock and welding (150 KW Instrument Air compressor motor)
Charges for Dynamic balancing of rotor of 150 KW Instrument Air Compressor motor
Labour charges for rewinding of 55 KW Sea Water booster pump motor.
Labour charges for metal filling, machining and repairing of worn out shafts/ bearing seating surface of one side checking of bearing housings, providing sleeves in the end cover of one side. (55 KW Sea Water Booster pump motor)
Labour charges for Fabrication of terminal cover, copper terminal flat, hylemsheet for support insulation including assembling (55 KW Sea Water Booster pump motor)
Material (Copper wire, Insulating material, New steel material of En-12 quality)
New PVC fan and cooling fan cover (55 KW)
Material (Bearings) N 321 (for 150 KW DE side)
6318 (For 150 KW NDE side)
NU 215 (for 55 KW DE side)
6215C3 (For 55 KW NDE side)
Consumable & T&P
Transporting charges
Delta Roto Tech Private LimitedV
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .