| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC | ₹1.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.7 LRejected-Finance | ₹1.7 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | C REVATHI L1 | SEENAPPA BASKAR L2 |
|---|---|---|---|---|---|
| 1.00 | Supplying and Delivery of the following sizes of HDPE Pipes PE-100 - PN8 conforming to IS-4984/1995, as specified to technical specifications in standard length including labour charges for loading, un-loading and staging at stock yard etc.., complete as per standard specification as directed by the Department Officers.(p.no.29) 90mm HDPE Pipe 90mm HDPE Pipe | 230 | Rm | 304 ₹69,920 | 310 ₹71,300 |
| 2.00 | Earth work excavation and deposition on the bank with an initial lead and lift of 10 meters and initial lift of 2 meters in hard stiffy clay stiff black cotton hard red earth murram, gravelly soils(SS20B) etc., complete as per std., specification. | 230 | Rm | 207 ₹47,610 | 208 ₹47,840 |
| 2.01 | Lowering the following HDPE pipes and specials into trench and laying to proper grade and alignment complete as per standard specification by deparment officers etc.., HDPE Pipe 90mm | 230 | Rm | 20 ₹4,600 | 21 ₹4,830 |
| 2.02 | Jointing the HDPE pipes and specials and testing the required pressure with water etc.., Complete as per standard specification HDPE Pipe 90mm | 230 | Rm | 30 ₹6,900 | 33 ₹7,590 |
| 2.03 | Testing of pipes for water supply with hudralic testing equipments by filling with water including cost of water @ 60/KL and testing to recommended Pressure in convenient stretches and attending the brusts if any occurred during the test excluding the cost of pipes but including other incidential and operational charges ETC... complete for the following diameteres of pipes HDPE Pipe 90mm | 230 | Rm | 80 ₹18,400 | 81 ₹18,630 |
| 2.04 | Refilling the excavated earth in to the trenches after laying the P.V.C. pipe in to the trench including cost of all labour charges and all other incidental charges etc., complete. | 230 | Rm | 28 ₹6,440 | 29 ₹6,670 |
| 2.05 | Supplying and Delivery of the following sizes of HDPE Pipes PE-100 - PN8 conforming to IS-4984/1995, as specified to technical specifications in standard length including labour charges for loading, un-loading and staging at stock yard etc.., complete as per standard specification as directed by the Department Officers. 90 mm HDPE stup bend | 2 | Nos | 1,200 ₹2,400 | 1,200 ₹2,400 |
| 3.00 | 90 mm HDPE Elbow | 5 | Nos | 343 ₹1,715 | 345 ₹1,725 |
| 4.00 | 90 mm HDPE Flange set | 2 | Nos | 1,100 ₹2,200 | 1,100 ₹2,200 |
| 5.00 | 110 mm HDPE Tee | 2 | Nos | 815 ₹1,630 | 816 ₹1,632 |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
23 Jan 2026, 3:00 pmClosed
THE COMMISIONER
hosur city municipal corporation bagalur road
Providing 90 mm HDPE pipeline work at ward No. 32 Rangasamy Pillai Street borewell to Anna Colony in Hosur City Municipal Corporation
2026_MAWS_640128_10
00027/2025/E2/HOSUR CITY MUNICIPAL CORPORATION
Open Tender
Civil Works - Water Works
60 days
Hosur City Municipal Corporation
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2,000
27 Mar 2026
8 Jan 2026
23 Jan 2026
8 Jan 2026
23 Jan 2026
8 Jan 2026
Supplying and Delivery of the following sizes of HDPE Pipes PE-100 - PN8 conforming to IS-4984/1995, as specified to technical specifications in standard length including labour charges for loading, un-loading and staging at stock yard etc.., complete as per standard specification as directed by the Department Officers.(p.no.29) 90mm HDPE Pipe 90mm HDPE Pipe
Earth work excavation and deposition on the bank with an initial lead and lift of 10 meters and initial lift of 2 meters in hard stiffy clay stiff black cotton hard red earth murram, gravelly soils(SS20B) etc., complete as per std., specification.
Lowering the following HDPE pipes and specials into trench and laying to proper grade and alignment complete as per standard specification by deparment officers etc.., HDPE Pipe 90mm
Jointing the HDPE pipes and specials and testing the required pressure with water etc.., Complete as per standard specification HDPE Pipe 90mm
Testing of pipes for water supply with hudralic testing equipments by filling with water including cost of water @ 60/KL and testing to recommended Pressure in convenient stretches and attending the brusts if any occurred during the test excluding the cost of pipes but including other incidential and operational charges ETC... complete for the following diameteres of pipes HDPE Pipe 90mm
Refilling the excavated earth in to the trenches after laying the P.V.C. pipe in to the trench including cost of all labour charges and all other incidental charges etc., complete.
Supplying and Delivery of the following sizes of HDPE Pipes PE-100 - PN8 conforming to IS-4984/1995, as specified to technical specifications in standard length including labour charges for loading, un-loading and staging at stock yard etc.., complete as per standard specification as directed by the Department Officers. 90 mm HDPE stup bend
90 mm HDPE Elbow
90 mm HDPE Flange set
110 mm HDPE Tee
110 x 90 mm HDPE Reducer
90 mm PVC Ball Valve
90 mm HDPE Tee
90 x 75 mm HDPE Reducer
2" x 3" HDPE Reducer
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.01 MB
Tendernotice_2.pdf
PDF • 0.97 MB
BOQ_766585.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid