| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 LAdmitted-Finance | -5.00% | ₹2.6 L | L1 | Admitted-Finance |
| 2 | L2₹2.6 L+₹2,820.78 (1.11%)Admitted-Finance NEAR WAR HEROES MEMORIAL SCHOOL VILLAGE BASTARA TEHSIL GHARAUNDA DISTT KARNAL | KARNAL | HARYANA | 132001 | -3.95% | ₹2.6 L+₹2,820.78 (1.11%) | L2 | Admitted-Finance |
| 3 | L3₹2.6 L+₹5,238.60 (2.05%)Admitted-Finance | -3.05% | ₹2.6 L+₹5,238.60 (2.05%) | L3 | Admitted-Finance |
| 4 | L4₹3.0 L+₹40,296.94 (15.8%)Admitted-Finance PANCHKULA | +10.00% | ₹3.0 L+₹40,296.94 (15.8%) | L4 | Admitted-Finance |
| 5 | L5₹3.0 L+₹45,669.86 (17.9%)Admitted-Finance | +12.00% | ₹3.0 L+₹45,669.86 (17.9%) | L5 | Admitted-Finance |
Tender Value
₹2.7 L
EMD Value
₹7,000
Closing Date
5 Sept 2026, 6:00 pmClosed
MOHIT VASHISHTA
W.S. Divn. Palwal
estimate for construction of truss foot bridge at rd 0m 7f 569ft of bhanguri
2026_HRY_544584_1
202611D9A988 5E7A 4348 BDDE 6FD8026991BF164IRR
Open Tender
Civil Works
Works
90 days
Palwal
3 documents required · 3 mandatory
₹500
Yes
₹7,000
Yes
10 Sept 2026
31 Aug 2026
7 Sept 2026
31 Aug 2026
5 Sept 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | HSR [4.4.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. | 8.39 | Cum | 83 | ₹696.62 |
| 2 | HSR [4.33]Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation
etc. complete | 84.95 | Cum | 138 | ₹11,723.24 |
| 3 | HSR [6.1.4]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 4. 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded
stone aggregate 20 mm nominal size) | 15.8 | Cum | 2,911 | ₹45,985.07 |
| 4 | HSR [6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 17.1 | Cum | 3,476 | ₹59,453.5 |
| 5 | HSR [6.29.1]Centering and shuttering including strutting, propping etc. and removal of form work for : 1. Foundations, footings, bases for columns | 27.31 | Sqm | 155 | ₹4,233.67 |
| 6 | HSR [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 1,628.26 | Kg | 83 | ₹1,35,145.17 |
| 7 | HSR [13.30.1]Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. 1. Hot finished welded type tubes | 97.01 | Kg | 105 | ₹10,185.84 |
| 8 | HSR [34.50]Painting on Steel Surfaces Providing and applying two coats of ready mix paint of approved brand on steel surface after through cleaning of surface to give an even shade | 20.39 | Sqm | 60 | ₹1,223.16 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_624132.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .