| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.8 Cr+₹27,115.45 (0.15%)Admitted-Finance B 2 JAI INDUSTRIES INDUSTRIAL ESTATE UTRAULA ROAD DISTRICT BALRAMPUR | BALRAMPUR | BALRAMPUR | UTTAR PRADESH | L2 | Admitted-Finance |
Tender Value
₹1.8 Cr
EMD Value
₹11.0 L
Closing Date
22 Sept 2026, 12:00 pmClosed
SE GONDA CIRCLE PWD GONDA
SE GONDA CIRCLE PWD GONDA
Construction work of From Belwa Sultanjot to Manwariya via the Panchayat Bhavan road
2026_CEDPW_1184260_3
4007/2Com(B)/Gonda Circle/26-27 Dt. 25.08.26
Open Tender
Civil Works
Percentage
180 days
Balrampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,600
Yes
₹11.0 L
Yes
Gonda
29 Sept 2026
10 Sept 2026
22 Sept 2026
10 Sept 2026
22 Sept 2026
10 Sept 2026
10 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Embankment with Material Obtained from Borrow Pits / Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 | 6,750 | cum | 103 | ₹6,95,250 |
| 2 | Construction of Subgrade and Earthen Shoulders - Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1 | 1,870 | cum | 92.9 | ₹1,73,723 |
| 3 | Granular Sub-base with Well Graded Material (Table 400.1) / (A) By Mix in Place Method / Construction of granular sub-base by providing well graded material,spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. / (i) For Grading I Material | 465.75 | cum | 4,050 | ₹18,86,287.5 |
| 4 | Water Bound Macadam Sub-base/base / (3) WBM Grading 3 / Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. / (B) By Mechanical Means | 621 | cum | 5,020 | ₹31,17,420 |
| 5 | Cement Concrete Pavement - Construction of unreinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. | 1,181.25 | cum | 9,670 | ₹1,14,22,687.5 |
| 6 | C/o Hume pipe culvert Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5m. (5fts.) and lead upto 30m. (100fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-incharges upto a distance of 30m. (100 fts.) from the foundation trenches. As per SI No. 251 | - | cum | 125 | - |
| 7 | Providing and laying Cement concrete 1:4:8 (1 cement : 4 fine sand : 8 graded brick aggregate 40 mm. nominal size) including supply of all materials, labour and T & P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors. as per SI No. 281 | - | cum | 4,300 | - |
| 8 | Providing and laying dry brick ballast (O.B.B.) under and half round of the pipe including cost of all materials T&P etc complete. | - | cum | 1,400 | - |
| 9 | First Class brick work in 1 : 4 cement and course sand in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work. As per SI no 305(b) | - | cum | 5,600 | - |
| 10 | Supply & laying of 600mm dia NP3 hume pipe including fixing of collar with 1:2 cement mortar. | - | RM | 2,214 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.99 MB
BOQ_2227853.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .