Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.0 LAccepted-AOC | ₹9.0 L | L1 | Accepted-AOC OK |
| 2 | L2₹10.4 LRejected-Finance R O VILLAGE P O CHARATGARH TEHSIL DISTT UNA H P | UNA | HIMACHAL PRADESH | 174301 | ₹10.4 L | L2 | Rejected-Finance L2 |
Tender Value
₹11.6 L
EMD Value
₹23,200
Closing Date
2 Apr 2026, 5:00 pmClosed
EXECUTIVE ENGINEER HIMUDA DIVISION PARWANOO
EXECUTIVE ENGINEER HIMUDA DIVISION PARWANOO
Repair and Restoration in 31 Nos Schools Approved under PDNA 2023 in Dharampur Block Distt. Solan HP SH Construction of Damaged Retaining wall at GPS Sandhog PF Steel fabric fencing on existing R Wall Water proofing of School Building and PF G I She
2026_HIMUD_132483_1
No.HIMUDA/PD/CB/TN-8727-35 DT 23.03.2026
Open Tender
Civil Works
120 days
PARWANOO
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,770
₹23,200
18 Apr 2026
25 Mar 2026
4 Apr 2026
25 Mar 2026
2 Apr 2026
25 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within all lead & lift as per direction of Engineer-in-charge : In cement mortar | - | cum | - | - | 1 | |
Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within all lead & lift .All kinds of soil. | - | cum | - | - | 2 | |
Centering and shuttering including strutting, propping etc. and removal of form including carriage of material in all leads and lifts.Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | - | sqm | - | - | 3 | |
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size) | - | cum | - | - | 4 | |
Providing and laying in position cement concrete 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) of specified grade excluding the cost of centering and shuttering including carriage of material in all leads & lifts. All work up to plinth level including carriage of material in all leads & lifts | - | cum | - | - | 6 | |
Providing weepholes in brick masonry / stone masonry /plain reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full with of the structures with slop of 1(v):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7 | - | Rmt | - | - | 7 | |
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | - | cum | - | - | 8 | |
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar.including carriage of material in all leads & lifts | - | cum | - | - | 9 | |
Centering and shuttering including strutting, propping etc. and removal of form including carriage of material in all leads and lifts.Columns, Pillars, Piers, Abutments, Posts and Struts including carriage of material in all leads & lifts | - | sqm | - | - | 10 | |
Providing and layingcement concrete in retainingwalls, returnwalls,walls (any thickness) includingattachedpilasters, columns, piers, abutments, pillars, posts, struts, buttresses, stringor lacingcourses, parapets, coping, bedblocks, anchor blocks,plainwindowsills, fillets,sunkenflooretc.,uptofloor fivelevel,excluding the cost of centering, shuttering and finishing :1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) | - | cum | - | - | 11 |
stage.html
html • 0.04 MB
technical_195932.pdf
techsummary_195932.pdf
finance_195932.pdf
BOQ Comparative Chart
xlsx
finsummary_195932.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
Tendernotice_2.pdf
PDF • 0.31 MB
Tendernotice_3.pdf
PDF • 1.35 MB
BOQ_195932.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid