Loading…
Loading…
Tender Value
₹3,245
EMD Value
₹2.7 L
Closing Date
28 Sept 2026, 2:00 pm3d left
Executive Officer
Nagar Panchayat Jalalabad
Construction of RCC Nala from H/O Shahzad Malik to near Pump house Moh - Qajiyaan ward no,07 at Nagar panchayat Jalalabad,Distt-Bijnor
2026_DOLBU_1184303_1
04/ET/NPJ/2026-27
Open Tender
Civil Works
Percentage
90 days
Nagar Panchayat Jalalabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,245
Yes
Executive Officer
₹2.7 L
Yes
11 Sept 2026
11 Sept 2026
28 Sept 2026
11 Sept 2026
28 Sept 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentling brick work or stone work in lime or cement mortar and including stacking of materials as directed by the Engineer-in-charge with-in-charge with in distance of 60 meeter (200 fee). | 11.04 | Cum | 620 | ₹6,844.8 |
| 2 | Deduction of old and workable brick of 40% of dismantling brick work including supply of all material,labour and T&P etc.required for proper completion of work. | 2,031 | Nos | 5.8 | ₹11,779.8 |
| 3 | Deduction of bricks bats of 60% of dismantling brick work including supply of all material,labour and T&P etc.required for proper completion of work. | 6.62 | Cum | 1,050 | ₹6,951 |
| 4 | De-watering of Nala to divert running water including supply of all materials, labour & T&P required for proper completion of work as per | 160 | Hours | 165 | ₹26,400 |
| 5 | Earth work in excavation in ordinary soil including supply of all materials, labour & T&P required for proper completion of work as per | 240 | Cum | 200 | ₹48,000 |
| 6 | Concrete in 1:4:8 with Stone ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work. | 36 | Cum | 6,850 | ₹2,46,600 |
| 7 | R.C.C. Work with cement approved coarse sand and 2cm. gauge approved stone grit in proportion of 1:1.5:3 in Raft foundation excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc. and supply of all meterials, labour and T&P etc. | 36 | Cum | 7,665 | ₹2,75,940 |
| 8 | R.C.C. Work with cement approved coarse sand and 2cm. gauge approved stone grit in proportion of 1:1.5:3 in RCC wall excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc. and supply of all meterials, labour and T&P etc. | 80 | Cum | 8,460 | ₹6,76,800 |
| 9 | R.C.C. Work with cement approved coarse sand and 2cm. gauge approved stone grit in proportion of 1:1.5:3 in RCC Slab excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc. and supply of all meterials, labour and T&P etc. | 30 | Cum | 8,295 | ₹2,48,850 |
| 10 | Mild steel or iron in plain work such as concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work. | 108.96 | Qtl | 7,050 | ₹7,68,168 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
BOQ_2227887.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .