| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹3.5 L+₹59,995.20 (20.7%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹4.2 L+₹1.3 L (46.6%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹5.0 L
EMD Value
₹10,000
Closing Date
15 May 2026, 3:00 pmClosed
Executive Engineer
Ex. Eng. Jal Shakti (PHE) City Div. No.1 BC Road Jammu
Providing of water supply connections by laying of pipes for toilet facility, bathing and laundry purposes at different locations under Capex SANJY 2026
2026_PHE_309306_2
e-NIT No. JS/PHECD-1/03 of 2026-27
Open Tender
Civil Works
Percentage
90 days
JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
CAO, JMC
₹10,000
21 May 2026
4 May 2026
16 May 2026
4 May 2026
15 May 2026
4 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling manually/ mechanically including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: Bituminous road. | 13.2 | sqm | 305.95 | ₹4,038.54 |
| 2 | Carriage of pipes from the stackling place to the site of work about 500m by head load, including lifting back upto the stacking place after the completion of the yatra (Deptt. pipes to be dismantled and returned to store) | 2.57 | MT | 340.01 | ₹873.83 |
| 3 | Earthwork in execavation by manual means in trenches for foundations, drains, pipes , cables etc. (Not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 m² on plan, depth upto 1.5 mtr including disposal of execavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in
(All kinds of soil) | 27 | Cum | 479.3 | ₹12,941.1 |
| 4 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge:1:3:6 or richer mix (i/c equivalent design mix) | 2.62 | cum | 1,725.2 | ₹4,520.02 |
| 5 | Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) 15 mm dia. nominal bore | 350 | mtr | 179.2 | ₹62,720 |
| 6 | Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) 20 mm dia. nominal bore | 300 | mtr | 227.9 | ₹68,370 |
| 7 | Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) 25 mm dia. nominal bore | 250 | mtr | 311.95 | ₹77,987.5 |
| 8 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work.15 mm and 20 mm dia. G.I. pipes | 300 | mtr | 22.25 | ₹6,675 |
| 9 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work. 25 mm and 32 mm dia. G.I. pipes | 150 | mtr | 33.7 | ₹5,055 |
| 10 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work.40 mm and 50 mm dia. G.I. pipes | 100 | mtr | 44.85 | ₹4,485 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_1001378.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .