| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹33.2 LAccepted-AOC | ₹33.2 L | 1 | Accepted-AOC L1 |
| 2 | 2₹33.3 LRejected-AOC | ₹33.3 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Mahadevi K L1 | J Elango L2 |
|---|---|---|---|---|---|
| 1.00Providing Interlocking paver block Road in TNHB Plot No. 4378 to 5527 In Ayapakkam Panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead including cost of conveyance etc,..completed | 32.4 | cu.m | 131.8 ₹4,270 | 133 ₹4,309 |
| 3.00 | Filling with M sand including cost and conveyance of all materials to site etc., complete | 10.8 | cu.m | 2,062 ₹22,270 | 2,064 ₹22,291 |
| 4.00 | Cement Concrete 1:4:8 ( One Cement Five sand and Ten Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. comple | 10.8 | cu.m | 5,783.5 ₹62,462 | 5,785 ₹62,478 |
| 5.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing using mild steel sheets of size 90 x 60 cm for all labour charges etc | 165.6 | sqm | 136.8 ₹22,654 | 138 ₹22,853 |
| 6.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) . | 740.3 | cu.m | 2,893.2 ₹21.4 L | 2,895 ₹21.4 L |
| 7.00 | Flooring with paver blocks laid as interlocking blocks inclouding cost and conveyance and other labour charges ( 80MM thick block) | 592.2 | sqm | 928 ₹5.5 L | 930 ₹5.5 L |
| 8.00 | Painting in Two Sides Corewall inclouding cost and conveyance and other labour charges | 165.6 | sqm | 81 ₹13,414 | 83 ₹13,745 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 5,06,964.24 ₹5.1 L | 5,07,526.38 ₹5.1 L |
Tender Value
₹12.2 L
EMD Value
₹30,600
Closing Date
20 Jan 2026, 3:00 pmClosed
Block Development Officer
Block Development Office VKM at Ambathur
Providng Paver Block Road at TNHB Plot no 4378 to 5527 in Ayapakkam Panchayat
2026_RDTN_642043_1
14TH FINANCE SAVING FUND 2025-26
Open Tender
Civil Works
90 days
Villivakkam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹30,600
Yes
27 Feb 2026
10 Jan 2026
20 Jan 2026
10 Jan 2026
20 Jan 2026
10 Jan 2026
Providing Interlocking paver block Road in TNHB Plot No. 4378 to 5527 In Ayapakkam Panchayat
Earth work excavation and depositing on bank with in initial lead including cost of conveyance etc,..completed
Filling with M sand including cost and conveyance of all materials to site etc., complete
Cement Concrete 1:4:8 ( One Cement Five sand and Ten Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. comple
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing using mild steel sheets of size 90 x 60 cm for all labour charges etc
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Flooring with paver blocks laid as interlocking blocks inclouding cost and conveyance and other labour charges ( 80MM thick block)
Painting in Two Sides Corewall inclouding cost and conveyance and other labour charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_768999.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
tenderdocument.pdf
Tender Documents • 0.82 MB
BOQ_768999.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid