Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.6 LAccepted-AOC MORWA SHUKLA MODE WARD NO 2 P O SINGRAULI DISTT SINGRAULI M P PIN 486889 | SINGRAULI | SINGRAULI | MADHYA PRADESH | 486889 | L1 | Accepted-AOC Accepted as resultant single L-1 bidder basis in OPEN TENDER ENQUIRY |
Tender Value
₹32.3 L
EMD Value
₹40,500
Closing Date
10 Feb 2025, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GENERAL MANAGER (EXCAVATION)
OFFICE OF GM(EXCV) NIGAHI PROJECT , NCL , PO-NIGAHI , DISTRICT-SINGRAULI , M.P.
(A.) Repairing of critical cracks in Live Ring Roller Pads (baseANDrotate Frame), Base Centre pintail, Base ChambersANDRotate frame structure above Rail segment machining pad of 24/96 Krishna DL (B.) Estimate of Repairing of cracks in swing shaft be
2025_NCL_326365_1
NGH/EXCV/TENDERS/24-25/174
Open Tender
Excavation Department Work
Item Rate
60 days
NIGAHI PROJECT
AS PER NIT
4 documents required · 4 mandatory
₹40,500
20 May 2025
21 Jan 2025
11 Feb 2025
21 Jan 2025
10 Feb 2025
22 Jan 2025
21 Jan 2025 - 31 Jan 2025
Amount
Name and scope of Part A: Repairing of critical cracks in Live Ring Roller Pads (base & rotate Frame), Base Centre pintail, Base Chambers & Rotate frame structure above Rail segment machining pad of 24/96 Krishna DL having scope of work as follows: 1. Thorough Joint cleaning: Ensuring that the joint is thoroughly cleaned prior to welding is essential to achieve high-quality welds. 2. Crack Removal Confirmation: It is crucial to confirm the complete removal of any cracks through DP Test. 3. Preheating the joint: Preheating the joint before welding helps to prevent thermal shock and reduce the risk of cracking. 4. Maintaining Interpass Temperature: Carefully maintaining the Interpass temperature is necessary to ensure the integrity of the weld. 5. Post-Heating the Weld Joint : Post-Heating the weld joint after completion helps to relieve residual stresses and reduce the risk of cracking 6. UT test 7. Controlled cooling Rate: After welding is completed, it is imperative to properly cover the weld joint to control the cooling rate, preventing the formation of undesirable microstructures. 8. Submission of Report. Note: 1. Welding electrode per crack in Roller pads (base & rotate frame ) Base Center pintle , Rotate frame structure: 8018 , 3.15 mm : 5 kg & 8018 , 4mm : 10kg 2. Welding electrode per crack in various chambers of Dragline : 8018 , 3.15 mm : 2 kg & 8018 , 4mm : 5 kg
Cost/ charges for Grinding of crack for V preparation including charge of grinders , grinding wheel & accessories (average grinding hrs/ crack is 8 hrs) for 01 crack in Roller pads (base & rotate frame ) Base Center pintle , Rotate frame structure . ( Total 45 Nos. cracks)
Cost/ charges for DP test 3 times (after root , after 03 layer, after final welding) (3 nos per crack) for 01 crack in Roller pads (base & rotate frame ) Base Center pintle , Rotate frame structure . ( Total 45 Nos. cracks)
Cost/ charges for UT test for 01 crack in Roller pads (base & rotate frame ) Base Center pintle , Rotate frame structure . ( Total 45 Nos. cracks)
Cost/ charges for Stress relieving control heating up to 600 degree celcius & cooling for 01 crack in Roller pads (base & rotate frame ) Base Center pintle , Rotate frame structure . ( Total 45 Nos. cracks)
Cost/ charges for Repairing of 01 no. crack in Roller pads (base & rotate frame ) Base Center pintle , Rotate frame structure including labour charges , contractor profit , etc. (labour consisting of Skilled fitter , Skilled welder/Gas Cutter , Unskilled helper ) . ( Total 45 Nos. cracks)
Cost/ charges for Hiring of Welding machines with all accessories for 01 crack in Roller pads (base & rotate frame ) Base Center pintle , Rotate frame structure . ( Total 45 Nos. cracks)
Cost/ charges for Grinding of crack for V preparation including charge of grinders , grinding wheel & accessories (average grinding hrs/ crack is 8 hrs) for 01 crack in various chambers of the dragline. ( Total 40 Nos. cracks)
Cost/ charges for DP test 3 times (after root , after 03 layer, after final welding) (3 nos per crack) for 01 crack in various chambers of the dragline. ( Total 40 Nos. cracks)
Cost/ charges for UT test for 01 crack in various chambers of the dragline. ( Total 40 Nos. cracks)
Cost/ charges for Stress relieving control heating up to 600 degree celcius & cooling for 01 crack in various chambers of the dragline. ( Total 40 Nos. cracks)
Cost/ charges for Repairing of 01 no. crack in various chambers of the dragline including labour charges , contractor profit , etc. (labour consisting of Skilled fitter , Skilled welder/Gas Cutter , Unskilled helper ) . ( Total 40 Nos. cracks)
Cost/ charges for Hiring of Welding machines with all accessories for 01 crack in various chambers of the dragline ( Total 40 Nos. cracks)
Name and scope of Part B: Estimate of Repairing of cracks in swing shaft bearing housing and lower swing shaft spacer housing by mean of dismantling of both swing shaft (upper & lower)of 24/96 Krishna Dragline having scope of work as follows: 1. Cleaning of entire working area. 2. Cutting & removing of damaged portion of Housing area. 3. ‘V’ groove making by grinding, etc. in cracked area. 4. Welding of Cracks by suitable electrode. 5. D.P. Test (after root , after 3 layer & after final welding) 6. Welding of stiffener plates where required. Note: Welding electrode 8018 as per requirement will be provided by NCL
Cost/ charges for Cleaning of working area of 01 no. including labour charges , contractor profit , etc. (labour consisting of Unskilled helper ) . ( Total 03 nos)
Cost/ charges for Crack repairing including labour charges , contractor profit , etc. (labour consisting of Skilled fitter , Skilled welder , Semi skilled manpower ) . ( Total 03 Nos.)
Cost/ charges for DP test (after root , after 03 layer, after final welding) (3 nos per crack) 3 times in 10 cracks. ( Total 03 Nos.)
Name and scope of Part C: Repair of cracks in RHS rear A-frame leg & both LHS & RHS Boom foot points of 24/96 KRISHNA Dragline at Nigahi Project having scope of work as follows: 1. Cleaning of cracks by removing dust, grease & paint, etc. 2. ‘V’ groove making by grinding, etc. in cracked area. 3. Welding of joint by suitable electrode. 4. Perform D.P. test after root layer and every 2-3 layers. 5. Performing NDT. 6. Providing re-enforcement bars/plates if required.
Cost/ charges for removing 01 no. crack by grinding , 'V' groove making & welding , etc.including labour charges , contractor profit , etc. (labour consisting of Skilled fitter , Skilled welder ,Semi-skilled manpower) . ( Total 3 Nos. cracks)
Cost/ charges for DP test 3 times (after root , after 03 layer & after final welding) (3 nos per crack) for 01 crack . ( Total 3 Nos. cracks)
Cost/ charges for UT test for 01 crack . ( Total 3 Nos. cracks)
Cost/ charges for Hiring of Gas Cutting Sets. with all accessories for 01 crack . ( Total 3 Nos. cracks)
Cost/ charges for Hiring of welding machines with all accessories for 01 crack . ( Total 3 Nos. cracks)
Cost/ charges for Hiring of grinding machines , grinding wheels with all accessories for 01 crack . ( Total 3 Nos. cracks)
Cost/ charges for Welding Electrode L&T NH660 4mm : 20kg for 01 crack . ( Total 3 Nos. cracks)
Total impact of GST for the purpose of CTC
techsummary_338284.pdf
PDF • 0.22 MB
finsummary_338284.pdf
PDF • 0.22 MB
1622159WO15T174.pdf
PDF • 2.14 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .