Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-Finance | ₹4.0 L | L1 | Accepted-Finance Low Rate Quoted |
| 2 | L2₹4.0 LRejected-Finance | ₹4.0 L | L2 | Rejected-Finance High Rate Quoted |
| Sl No | Description | Qty | Unit | G.Vijaya Constractor L1 | Dinesh R L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation | 66.74 | m3 | 263.5 ₹17,585.99 | 300 ₹20,022 |
| 2.00 | Cement Concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges,etc, | 3.71 | m3 | 5,449.5 ₹20,217.65 | 5,500 ₹20,405 |
| 3.00 | Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete. | 25.25 | m3 | 6,235.5 ₹1.6 L | 6,240 ₹1.6 L |
| 4.00 | Supply and fabrication of steel for RCC items including all cost and conveyance of steel, labour charges for cutting, binding, tying to shape, etc, | 0.49 | MT | 91,902.5 ₹45,032.23 | 91,905 ₹45,033.45 |
| 5.00 | Reinforced Cement Concrete 1:1.2:3mix using 20 mm size ISS HBG metal including cost and conceyance of all materials and to site labour charges, etc, complete | 4.14 | m3 | 9,345 ₹38,688.30 | 9,400 ₹38,916 |
| 6.00 | Toward Centering Charges including cost and conveyance of all materials to site and all | 62.01 | m3 | 547.5 ₹33,950.48 | 550 ₹34,105.50 |
| 7.00 | Toward Centering Charges including cost and conveyance of all materials to site and all
Bed Block, Dirtwall and Deck Slab | 19.46 | m2 | 1,095 ₹21,308.70 | 1,100 ₹21,406 |
| 8.00 | GST 18% | 1 | No | 60,161.35 ₹60,161.35 | 60,740.63 ₹60,740.63 |
| 9.00 | LWF 1% | 1 | No | 3,342.3 ₹3,342.30 | 3,374.48 ₹3,374.48 |
Updated dates
Tender Value
₹4 L
EMD Value
₹4,000
Closing Date
10 Mar 2026, 10:00 amClosed
BLOCK DEVELOPMENT OFFICER
BLOCK DEVELOPMENT OFFICE
CONS OF CULVERT AT METTU COLONY IN PALLI
2026_RDTN_671459_1
CONS OF CULVERT AT METTU COLONY
Open Tender
Civil Works
90 days
BLOCK DEVELOPMENT OFFICE
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,000
12 Mar 2026
6 Mar 2026
10 Mar 2026
6 Mar 2026
10 Mar 2026
6 Mar 2026
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation
Cement Concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges,etc,
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete.
Supply and fabrication of steel for RCC items including all cost and conveyance of steel, labour charges for cutting, binding, tying to shape, etc,
Reinforced Cement Concrete 1:1.2:3mix using 20 mm size ISS HBG metal including cost and conceyance of all materials and to site labour charges, etc, complete
Toward Centering Charges including cost and conveyance of all materials to site and all
Toward Centering Charges including cost and conveyance of all materials to site and all Bed Block, Dirtwall and Deck Slab
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
BOQ_806936.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid