| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹74.6 CrAccepted-AOC | ₹74.6 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹76.2 CrRejected-Finance | ₹76.2 Cr | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | M/S SMB CONSTRUCTION L1 | M/S BN INFRAPROJECTS LLP L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. (i) By Manual Means, (a) In Area of light jungle. | 9.76 | Hect. | 54,129.17 ₹5.3 L | 54,129.17 ₹5.3 L |
| 2.00 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201.(i) Girth from 300mm to 600mm | 76 | Each | 261.43 ₹19,868.68 | 261.43 ₹19,868.68 |
| 3.00 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201.(ii) Girth from 600mm to 900mm | 45 | Each | 447.93 ₹20,156.85 | 447.93 ₹20,156.85 |
| 4.00 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201.(iii) Girth from 900mm to 1800mm | 4 | Each | 896.34 ₹3,585.36 | 896.34 ₹3,585.36 |
| 5.00 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material,disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 metres) (B) By Mechanical Means (a)Cement Concrete Grade M-15 & M-20 | 28.28 | Cum | 723.67 ₹20,465.39 | 723.67 ₹20,465.39 |
| 6.00 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material,disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 metres) (B) By Mechanical Means (b) Prestressed / Reinforced cement concrete grade M-20 & above | 59.75 | Cum | 723.67 ₹43,239.28 | 723.67 ₹43,239.28 |
| 7.00 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material,disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 metres) (B) By Mechanical Means b) Rubble stone masonry in cement mortar. | 350.25 | Cum | 211.8 ₹74,182.95 | 211.8 ₹74,182.95 |
| 8.00 | Dismantling Kilometre Stone (Dismantling of kilometre stone including cutting of earth, foundation and disposal of dismantled material with all lifts and lead upto 1000 m and back filling of pit.) (B) Ordinary KM Stone | 18 | Each | 226.68 ₹4,080.24 | 226.68 ₹4,080.24 |
| 9.00 | Removing all type of hume pipes and stacking within a lead of 1000 metres including earthwork and dismantling of masonry works. Quantity From Details of Measurement (b) Above 600 mm to upto 900 mm dia | 370 | RM | 194.01 ₹71,783.70 | 194.01 ₹71,783.70 |
| 10.00 | Scarifying : Scarifying Existing Bituminous Surface to a Depth of 150mm by Mechanical Means : Scarifying the existing bituminous road surface to a depth of 150mmand disposal of scarified material with a lift upto3.0m and lead upto1000m as per Technical Specification Clause 301.4(II) By Mechanical Means (a) Bituminous courses | 1,19,289.3 | Sqm | 7.51 ₹9.0 L | 7.51 ₹9.0 L |
Tender Value
₹74.6 Cr
EMD Value
₹1.5 Cr
Closing Date
29 Oct 2025, 2:00 pmClosed
CE, PWD(Roads), Assam, Chandmari, Ghy-3
CE, PWD(Roads), Assam, Chandmari, Ghy-3
ASOM_MALA_3.0_25_26_39 Improvement and Upgradation of Itakhola-Diplonga Sootea-Tewaripal Road (From Ch-0.00 Km at Itakhola) to ( Ch-21.893 Km at Tewaripal) under Asom Mala 3.0 for the year of 2025-26
2025_PWD_47928_2
CE/DEV/TB/116/2025-26/34 Dtd- 25.09.2025
Open Tender
Civil Works – Roads
540 days
Sonitpur
Please refer Tender Documents
5 documents required · 5 mandatory
₹30,000
₹1.5 Cr
Yes
CE, PWD(Roads), Assam, Chandmari, Ghy-3
29 May 2026
9 Oct 2025
29 Oct 2025
9 Oct 2025
29 Oct 2025
16 Oct 2025
9 Oct 2025 - 14 Oct 2025
15 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.77 MB
Tendernotice_2.pdf
PDF • 9.88 MB
Tendernotice_3.pdf
PDF • 0.60 MB
BOQ_76346.xls
BOQ • 0.48 MB
Download all tender documents and submit your bid