Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAccepted-AOC 6 JAGRITI OLD KOLKATA ROAD KOLKATA 700123 | KOLKATA | KOLKATA | WEST BENGAL | 700123 | ₹4.6 L | L1 | Accepted-AOC Lowest Rate. |
| 2 | L2₹4.6 L+₹2,985.37 (0.65%)Rejected-Finance | ₹4.6 L+₹2,985.37 (0.65%) | L2 | Rejected-Finance Higher Rate. |
| 3 | L3₹4.7 L+₹4,058.24 (0.88%)Rejected-Finance 3 K N MUKHERJEE ROAD TALPUKUR BARRACKPORE NORTH 24 PARGANAS KOL 700123 | BARRACKPORE | NORTH 24 PARGANAS | WEST BENGAL | 700123 | ₹4.7 L+₹4,058.24 (0.88%) | L3 | Rejected-Finance Higher Rate. |
| 4 | Rejected-Technical AG 112 SALT LAKE CITY SECTOR II UNIT 608 6TH FLOOR KOLKATA 700091 | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | - | - | Rejected-Technical Required documents not submitted. |
| 5 | Rejected-Technical 5A GOBINDA SARKAR LANE KOLKATA 700 012 | KOLKATA | WEST BENGAL | 700012 | - | - | Rejected-Technical Required documents not submitted. |
Tender Value
₹4.7 L
EMD Value
₹9,329
Closing Date
12 Mar 2026, 2:00 pmClosed
Assistant Engineer,PWD,SSKM(H)Sub- Division.
244 AJC Bose Road, Kolkata-700020
IPGMER-SSKM Hospital-Emergent patch repairing work at roof treatment work of PGT hostel, Roof of Block-A, B, C and Group-D quarter at 244 AJC Bose Road and IOP OPD attached Doctor room during the year 2025-26.
2026_WBPWD_1015623_7
WBPWD/AE/SSKMHSD/NIT-15e/25-26
Open Tender
CIVIL WORKS
Percentage
21 days
Kolkata
Please refer Tender documents.
5 documents required · 5 mandatory
₹9,329
Yes
25 Sept 2026
26 Feb 2026
16 Mar 2026
5 Mar 2026
12 Mar 2026
5 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. | 164 | Sqm | 19 | ₹3,116 |
| 2 | Applying 2 coats of bonding agent with synthetic multi functional rubber emulsion having adhesive and water proofing properties by mixing with water in proportion (1 bonding agent : 4 water : 6 cement) as per Manufacturer's specification [Cement to be supplied by the Department] | 164 | Sqm | 88 | ₹14,432 |
| 3 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]
With 1:6 cement mortar
20 mm thick plaster
2nd Floor | 164 | Sqm | 179.73 | ₹29,475.72 |
| 4 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
Extra for staging beyond 4 m in any floor (Mode of measurement: area in plan x mean height of staging upto soffit of shuttering above initial 4 m) | 882 | Cum | 61 | ₹53,802 |
| 5 | Application of priming coat for standard bituminous waterproofing treatment over flat roof with Bitumen primer of approved brand fufilling the provision of I.S. 1346 - 1991
& 3384 - 1986 applied @ 0.27 Liters /Sq.m. over clean and prepared roof surface complete as per satisfaction of the Engineer - in - Charge.
All Floor - | 164 | Sqm | 24 | ₹3,936 |
| 6 | Emergent roof treatment by application of ready to use, non toxic, water besed, cold applied, single component, elastomeric in-situ seamless monolithic, acrylic modified bituminious liquid water proofing membrane (Tarfelt LM or any other equivalent product) after preparing the surface by cleaning and repairing the roof cracks by cement & sand mortar (1:4) preferably with antishrinkage mortar (repair by morter to be paid separately) if any Apply one coats (@0.70 kg/Sqm without dilution with water ) after application of a priming coat (diluted with water in the ratio of 50:50 and apply @ 400 gm/Sqm of the mixture) (time gap between coats after priming coat allow it to touch dry and after final coat allow 36 hrs for any further work) including the cost of materials and base cleaning, tools & plants complete as per direction of Engineer-in-charge (Conduct pinding test after 7 days of curing at ambient temperature) cover layer not required) | 406 | Sqm | 223.44 | ₹90,716.64 |
| 7 | Labour for painting roof surface with Bitumen (using 135 kg (avg.) per % Sq.m.)including cleaning roof, heating bitumen as directed and spreading sand and complete including cost of sand @ 0.6 cu.m. per % Sq.m. and cost of carriage of Bitumen from deptt godown but excluding the cost of bitumen. (If heating is not reqd. then deduct Rs.3.45/- per Sq.m) | 520.6 | Sqm | 26 | ₹13,535.6 |
| 8 | Supplying & laying 3mm thick pre-fabricated plastomeric water proofing membrane conforming to EN 12311-1 & ASTMD 5147, manufactured with atactic poly propylene (APP) modified premium grade asphalt , specially reinforced with non-woven polyester core with polyester reinforcement @160 gms per sqm & both faces covered with thermo-fusible polyethylene film /MineraL on top face over a coat of primer @ 0.40 lit/sqm of manufacturer's specification on smooth,clean dry surface prepared wherever required.Lap joint shall be provided of 75 mm in longitudinal & 100 mm in transverse direction and fused using LPG/ Propane torch employing extra care ensuring full bondage, complete removal of entrapped air and sealing edges into grooves in appropriate manner as per direction of Engineer -in-charge all complete including materials,labour and applicable taxes. (Payment shall be made on the basis of finished surface area.).
Membrane Property: Softening Point > 150 deg C, Cold Flexibility < -6 deg C, Tensile Strength, N/cm : 600 (longitudinal), 450 (transverse), Tearing Strength, N:
300 (longitudinal), 200 (transverse) | 448.11 | Sqm | 407 | ₹1,82,380.77 |
| 9 | Add GST @ 18% on Rs.391396.00 i.e total amount over item no. 1 to 8 | - | Percent (%) | 18 | - |
| 10 | Add Labour Welfare Cess @ 1% on Rs 461847.00 i.e. Total amount over item No. 1 to 9 | - | Percent (%) | 1 | - |
stage.html
html • 0.11 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
Tendernotice_2.pdf
PDF • 1.88 MB
BOQ_2494976.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .