Loading…
Loading…
| # | Company | Amount |
|---|---|---|
| 1 | ₹1.5 Cr | ₹1.5 Cr |
Tender Value
Refer Docs
Closing Date
19 Mar 2026, 2:15 pmClosed
CONTROL ARM SET FOR LHB BOGIES
03252709
03252709
Indigenous
Chennai, Unknown (Unspecified Location)
₹0
Exempted
17 Mar 2026
17 Mar 2026
Description :ONE COACH SET OF (1)CONTROL ARM LOWER RIGHT TO DRG NO.AAA02028 ALT'd' - 4 N os, (2)CONTROL ARM LOWER LEFT TO DRG NO. AAA02027 ALT'd' - 4 Nos, (3)CONTORL ARM UPPER TO DRG NO AAA02026 ALT'j' - 8 Nos. (THESE THREE ITEMS FORM ONE SET) Special Condition : 1. Each ite m to be properly wrapped in biodegradable transparent plastic sheet to avoid water ingress. 2. The ite ms should be separated by using suitable eco friendly cushioning material to protect machined portion from damage & rubbing. 3. All machined surface shall be protected from corrosion as per RCF spec. M D.44121 dt.19.04.2011(para 1). 4.Items to be stacked properly in sturdy wooden boxes, which can be handled by fork lift/crane. 5. Control arm upper 8nos. In one box and control arm lower 8 nos. (4 left a nd 4 right) in one box. 6. Label with details of Description of item, Drg. No., Quantity, PO No., PL No., a nd name of the supplier, etc., to be affixed on the pallet. INFRASTRUCTURE REQUIREMENTS SHALL BE AS PER MDTS-241 Rev.02 [ Warranty Period: 30 Months after the date of delivery ] [Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitt ed: Max 8 lacs ] ] Consignee Shell Depot/ICF,Chennai, ICF Tamil Nadu 200.00 Set UVAM Item ref. ( Item Id :- 3100595 - Control Arm Lower Left, Right & Top (Casting, Casting & Machining) for FIAT Bogie , Sub Item Id:-3100595001 - Control Arm Lower Left, Right & Top (Casting, Casting & Machining) for FIAT Bogie ) Inspection Stage Inspection Not Required Details
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
5716729.pdf
ATTACHMENT
5664274.pdf
ATTACHMENT
Download all tender documents and submit your bid