Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49,500Qualified | L1 | Qualified | |
| 2 | L2₹51,200+₹1,700 (3.43%)Qualified | L2 | Qualified | |
| 3 | L3₹52,000+₹2,500 (5.05%)Qualified FIRST FLOOR SATLASANA AMBAJI HIGHWAY SATLASANA MAHESANA GUJARAT 384330 | MAHESANA | GUJARAT | 384330 | L3 | Qualified MSE, Category: General | |
| 4 | Disqualified 96 BARTHAKUR MILL ROAD ULUBARI KAMRUP ASSAM 781007 | KAMRUP METRO | ASSAM | 781007 | - | Disqualified MSE, Category: General | |
| 5 | Disqualified 154 AND 155 154 155 E 19 SECTOR 3 ROHINI OTHER DELHI 110085 | NORTH WEST DELHI | DELHI | 110085 | - | Disqualified MSE, Category: General |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
12 Sept 2022, 9:00 amClosed
Soil Investigation for Special Repair to Building No 350 Archery at HQ EAC U AF BOQ Title BOQ BID
3760925
GEM/2022/B/2510941
Soil Investigation for Special Repair to Building No 350 Archery at HQ EAC U AF
60 days
Meghalaya; East Khasi Hills
Total value wise evaluation
BOQ
5 documents required · 5 mandatory
2 yrs
50%
Exempted
12 Sept 2022
7 Sept 2022
12 Sept 2022
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | Soil Investigation for Special Repair to Building No 350 Archery at HQ EAC U AF | Soil exploration by wash boring using 50 mm casing pipe driven into ground, water force under pressure through a hollow drill rod 25 mm dia fitted with chopping bit including collection of disturbed and undisturbed samples at 150 cm interval and carrying out all relevant lab test , test should also covered standard penetration test, total depth of soil investigation should be 6 mtr to 10 mtr depth, The report of soil investigation should clearly specify the following for 02 Nos Holes , Introduction, Object of investigation, Scope of Work oblique project detail, Field investigation, Different field area, Lab investigation, Different lab investigation, Method of computing Safe Bearing Capacity oblique Pile Capacity, Soil profile base log detail, SBC from field test like plate load oblique SPT oblique SCPT, SBC from lab test like Direct Shear, C and O value of soil, SBC from settlement criteria settlement calculation shall be given considering specific structure to be constructed, Dept of foundation for seismic zone V, Final recommendation for SBC, Any suggestion oblique precaution measures for improvement of SBC, Typical calculation for SBC from shear criterion, Site plan for indication field test and sample collection, Bore logs indicating type of soil and classification Cc value, Cv value, field density, Lab test in tubular form, Test result on rock core if core is done on rock, Triaxial, Direct Consolidation test graphs, Typical elastic and consolidation settlement calculation | 2 | Each Bore Hole | East Khasihills | 60 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_3760925.pdf
GEM_BID
soil-investigation-for-special-repair-to-building-n_2022-09-07-11-27-01_983c1927894d114583a732e3817857f2.pdf
BOQ
soil-investigation-for-special-repair-to-building-n_2022-09-07-11-27-01_ff4119b1bf8b3c8f44075e43735a5b11.csv
BOQ
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .