Loading…
Loading…
Tender Value
₹2.2 L
EMD Value
₹6,600
Closing Date
28 Jul 2026, 6:00 pm2d left
office of the executive engineer rew ang
office of the executive engineer rew ang
CROSSING BHAGWANPORA NEAR TRANSFORMER BLOCK SHAHABAD
2026_RDPR_317094_10
ENIT72of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹6,600
21 Jul 2026
21 Jul 2026
29 Jul 2026
21 Jul 2026
28 Jul 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earthwork in excavation by manual means in trenches for foundations etc ( exceeding 1.5m in width) and exceeding 10 sqm on plan, depth upto 1.5m including disposal of excavated earth upto 1m from cutting edge, disposed earth to be leveled | 1 | cum | - | - |
| 0.0 | Providing and laying of stone soling of tightly hand picked by tamping including carriage upto 15 km lead without head load. | - | Cum | - | - |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 | - | Cum | - | - |
| 0.0 | plums @ 20 % | - | cum | - | - |
| 0.0 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth leve with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | cum | 1 | - |
| 0.0 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | kgs | - | - |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc.
A) Abutts | - | sqm | - | - |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc.
B) Slab | 1 | sqm | - | - |
| 0.0 | edges | - | sqm | 1 | - |
| 0.0 | cement/shuttering/steel reinforcement | - | no | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
BOQ_1037765.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].