Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.2 CrAdmitted-Finance | -4.25% | ₹19.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹19.3 Cr+₹80,394.13 (0.04%)Admitted-Finance 38 HATHROL KILE KE NICHE AJMER ROAD WARD 26 JAIPUR PIN 302006 JAIPUR WEST INDIA | JAIPUR | RAJASTHAN | 302006 | -4.21% | ₹19.3 Cr+₹80,394.13 (0.04%) | L2 | Admitted-Finance |
| 3 | L3₹23.6 Cr+₹4.4 Cr (22.9%)Admitted-Finance NO 10 BASCON FUTURA SV IT PARK 11TH FLOOR VENKATANARAYANA RD T NAGAR T NAGAR CHENNAI TAMIL NADU 600017 | CHENNAI | TAMIL NADU | 600017 | +17.66% | ₹23.6 Cr+₹4.4 Cr (22.9%) | L3 | Admitted-Finance |
| 4 | L4₹32.2 Cr+₹12.9 Cr (67.2%)Admitted-Finance 4TH FLOOR B K MARKET BACK SIDE PREMISES NO 16 B SHAKESPEARE SARANI KOLKATA 700071 | KOLKATA | KOLKATA | WEST BENGAL | 700071 | +60.05% | ₹32.2 Cr+₹12.9 Cr (67.2%) | L4 | Admitted-Finance |
| 5 | L5₹32.2 Cr+₹12.9 Cr (67.2%)Admitted-Finance 191 1 DIHIBARI KASHIDIH ROAD SAKCHI JAMSHEDPUR EAST SINGHBHUM JHARKHAND 831001 INDIA | EAST SINGHBUM | JHARKHAND | 831001 | +60.12% | ₹32.2 Cr+₹12.9 Cr (67.2%) | L5 | Admitted-Finance |
Tender Value
₹21.2 Cr
EMD Value
₹21.2 L
Closing Date
23 Jun 2026, 3:00 pmClosed
SE(P and W)
SE(P and W),Sarni
Excavation, loading of pond ash from 111 hectare Ash pond of STPS Sarni and its transportation an unloading at designated locations of Construction of 4 laning of NHAI road project of Budhni to Shahganj bypass end.
2026_MPPGC_483291_1
cwt5118
Open Tender
Civil Works - Others
Percentage
730 days
Sarni
As per Tender documents.
12 documents required · 12 mandatory
₹5,000
Yes
₹21.2 L
Yes
15 Sept 2026
7 May 2026
24 Jun 2026
7 May 2026
23 Jun 2026
7 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Sr. No. 1
Loading of ash Iin vehicles at ash pond i/c excavation ,making all arrangementof suitable machines like poclain ,making all arrangement i/c temporary road on ash surface of pond, sprinkling of water to prevent fugitive ash emission ,all labour fuel charges etc. complete as per direction of Engineer In-charge
(Base rate Rs 20.20 per cum)
Note: Rate of GST may please indicate in TC. Bid
Sr. No. 2
Transportation of Ash from 111 hectare ash pond of STPS, Sarni including covering ash surfaces in vehicles with tarpaulin for transportation of pond/PH-IV silo ash, all transportation and unloading upto designated place (Budhni to Shahganj bypass end of NH-146 B ) required toll tax payment, all fuel charges and overhead charges weighment of loaded vehicles engaged for transportation etc. Complete as per direction of engineer-in charge for following distances.
Slab from 100 Km to 125 Km
For 112 Km (Base Rate Rs. 461.27 Per Cum)
For 114 Km (Base Rate Rs. 467.95 Per Cum)
Note: Rate of GST may please indicate in TC. Bid
(Percentage Rate should be quoted excluding GST) 2.Base rate has been derived from MPPWD SOR 2022 | 1 | Select option from given below cell | 20,09,85,319 | ₹20,09,85,319 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.88 MB
Tenderscheduleandscope5118.pdf
Tender Documents • 0.73 MB
Annexurgeneral.pdf
Tender Documents • 0.99 MB
Credentials.xls
Tender Documents • 0.09 MB
NEWSBDworkservices.pdf
Tender Documents • 30.17 MB
BOQ_609555.xls
BOQ • 0.36 MB
TechnicalBiD5118.xls
Tender Documents • 0.32 MB
cwt5118secondextenion.pdf
PDF • 0.16 MB
CWT5118firstextension.pdf
PDF • 0.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .