Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAccepted-AOC | ₹9.3 L | L1 | Accepted-AOC Lowest L1 |
| 2 | L2₹10.1 L+₹80,736.89 (8.66%)Rejected-AOC | ₹10.1 L+₹80,736.89 (8.66%) | L2 | Rejected-AOC Highest L2 |
| 3 | L3₹10.2 L+₹88,127.12 (9.45%)Rejected-AOC | ₹10.2 L+₹88,127.12 (9.45%) | L3 | Rejected-AOC Highest L3 |
| Sl No | Description | Qty | Unit | G V AND CO L1 | V RAMASAMY L2 | G. Babu L3 |
|---|---|---|---|---|---|---|
| 1.00Name of the Work : Construction of CSC toilet at Merkku Minnapalayam H/O Kulavilakku, Modakkurichi Panchayat Union of Erode District, under SBM II - 2025-26 | ||||||
| 2.00 | Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification(upto 0.30 depth) | 9.16 | M3 | 272.2 ₹2,493.35 Lowest | 295.8 ₹2,709.53 | 297.9 ₹2,728.76 |
| 3.00 | Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification(Depth 0.30-0.60) | 4.53 | M3 | 336 ₹1,522.08 Lowest | 365.1 ₹1,653.9 | 367.7 ₹1,665.68 |
| 4.00 | Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification(above 0.60 depth) | 14.98 | M3 | 349 ₹5,228.02 Lowest | 379.2 ₹5,680.42 | 381.9 ₹5,720.86 |
| 5.00 | Cement concrete 1:4:8 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete | 8.08 | M3 | 4,648.2 ₹37,557.46 Lowest | 5,050.6 ₹40,808.85 | 5,086.2 ₹41,096.5 |
| 6.00 | Cement concrete 1:2:4 mix using 20mm iss HBG metal for foundation & flooring including labour charges etc., complete | 0.65 | M3 | 5,752.4 ₹3,739.06 Lowest | 6,250.4 ₹4,062.76 | 6,294.4 ₹4,091.36 |
| 7.00Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | ||||||
| 8.00 | Column footing, Column up to GL, Grade beam, Cross wall, Cross wall | 41.33 | M2 | 464.8 ₹19,210.18 Lowest | 505 ₹20,871.65 | 508.6 ₹21,020.44 |
| 9.00 | Jolly bottom, Door botttom, Door botttom, Door botttom | 31.28 | M2 | 929.6 ₹29,077.89 Lowest | 1,010.1 ₹31,595.93 | 1,017.2 ₹31,818.02 |
| 10.00 | Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete | 0.97 | Mtr | 78,037.8 ₹75,696.67 Lowest | 84,793.7 ₹82,249.89 | 85,391.2 ₹82,829.46 |
Tender Value
₹11.1 L
EMD Value
₹22,500
Closing Date
8 Jul 2026, 3:00 pmClosed
Block Development Officer (V.P), Modakkurichi
Block Development Officer (V.P), Modakkurichi Block
Construction of CSC toilet at Merkku Minnapalayam H/O Kulavilakku, Modakkurichi Panchayat Union of Erode District, under SBM II -2025-26
2026_RDTN_682316_1
Roc No. 1321/2026/B5 Dt. 19.06.2026
Open Tender
Civil Works - Buildings
Item Rate
180 days
Modakkurichi
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹22,500
9 Jul 2026
22 Jun 2026
8 Jul 2026
22 Jun 2026
8 Jul 2026
22 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of the Work : Construction of CSC toilet at Merkku Minnapalayam H/O Kulavilakku, Modakkurichi Panchayat Union of Erode District, under SBM II - 2025-26 | - | - | - | - |
| 2 | Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification(upto 0.30 depth) | 9.16 | M3 | - | - |
| 3 | Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification(Depth 0.30-0.60) | 4.53 | M3 | - | - |
| 4 | Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification(above 0.60 depth) | 14.98 | M3 | - | - |
| 5 | Cement concrete 1:4:8 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete | 8.08 | M3 | - | - |
| 6 | Cement concrete 1:2:4 mix using 20mm iss HBG metal for foundation & flooring including labour charges etc., complete | 0.65 | M3 | - | - |
| 7 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | - | - | - | - |
| 8 | Column footing, Column up to GL, Grade beam, Cross wall, Cross wall | 41.33 | M2 | - | - |
| 9 | Jolly bottom, Door botttom, Door botttom, Door botttom | 31.28 | M2 | - | - |
| 10 | Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete | 0.97 | Mtr | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.27 MB
techbid.pdf
Tender Documents • 0.71 MB
BOQ_820111.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .