Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹4.6 L+₹17,529.20 (3.92%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹4.7 L+₹25,508 (5.70%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹4.8 L+₹33,305.48 (7.45%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹5.3 L+₹83,112.58 (18.6%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹6.0 L
EMD Value
₹12,080
Closing Date
24 Aug 2026, 4:30 pmClosed
Executive Engineer University of Kashmir
Construction Division
Renovation of Canteen at Kupwara Campus, University of Kashmir (Civil work)
2026_UDJK_320621_1
F(E.Tend)(Ren. Canteen Kup. Campus)(UCD)/KU/14/26
Open Tender
Civil Works
Percentage
30 days
Kupwara Campus
As per NIT
4 documents required · 4 mandatory
₹300
Registrar University of Kashmir
₹12,080
7 Sept 2026
15 Aug 2026
25 Aug 2026
15 Aug 2026
24 Aug 2026
15 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying and laying of stone soling hand packed tightly including ramming, watering and carriages complete. | 2.95 | CUM | 1,250 | ₹3,687.5 |
| 2 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement all work up to all levels.
1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20mm nominal size) Crushed | 0.27 | CUM | 7,604 | ₹2,053.08 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to all levels.
1:3:6 (1Cement: 3 coarse sand:6 graded stone aggregate 20mm nominal Size) Crushed | 3.44 | CUM | 6,233 | ₹21,441.52 |
| 4 | Centering and shuttering including strutting propping etc. removal of form work in Suspended floors, roofs, landings, balconies, access plat forms, Lintels, beams, plinth beams, girders, bressumers, cantilevers, Columns, pillars, piers, abutments, posts and struts and edges of slabs etc. (M.S. Plates/Ply wood) | 3.6 | SQM | 718 | ₹2,584.8 |
| 5 | 15mm thick cement plaster on brick / concrete wall of mix 1:6 (1cement: 6 coarse sand) | 19.8 | SQM | 306.85 | ₹6,075.63 |
| 6 | Providing and fixing false ceiling at all height including providing and fixing of frame work made of special sections, power pressed from M.S sheets and galvanized with zinc coating of 120 gms/sqm (both side inclusive) as per IS:277 and consisting of angle cleats of size 25 mm widex1.6mm thick with flanges of 27mm and 37 mm, at 1200 mm centre to centre, one flange fixed to the ceiling with dash fastener 12.5 mm dia x40mm long with 6 mm dia bolts, other flange of cleat fixed to the angle hangers of 25x10x0.5mm of required length with nuts & bolts of required size and other end of angle hanger fixed with G.I. channels 45x15x0.9 mm running at the spacing of 1200 centre to centre, to which the ceiling section 0.5mm thick bottom wedge of 80mm with tapered flanges of 26 mm each having clips of 10.5 mm at 450mm centre to centre, shall be fixed in a direction perpendicular to G.I. intermediate channel with connecting clips made out of 2.64mm diaX230 mm long G.I. wire at every junction, including fixing perimeter channels 0.5mm thick 27mm high having flanges of 20mm and 30 mm long, the perimeter of ceiling fixed to wall/partition with the help of rawl plugs at 450 mm centre to centre, with 25mm long drive-all screws @ 230 mm interval ,including fixing of gypsum board/calcium silicate board to ceiling section and perimeter channel with the help of dry wall screws of size 3.5x25mm at 230mm c/c, including jointing and finishing to a flush finish of tapered and square edges of the gypsum board with recommended jointing compound, jointing tapes, finishing with jointing compound in 3 layers covering upto 12.5 mm thick tapered edge gypsum plain board conforming to IS: 2095-Part 1 : 2011 (Board with BIS certification marks) | 29.51 | SQM | 1,350 | ₹39,838.5 |
| 7 | Steel Work
Reinforcement for RCC works including straightening, cutting, bending placing in position and binding all complete up to all floors.
Thermo mechanically heated bars. | 50 | K.G | 138.2 | ₹6,910 |
| 8 | Providing and applying cemement based wall putty 1mm thickness over plastered surface to prepare the surface even and smooth complete. | 60 | SQM | 138.1 | ₹8,286 |
| 9 | Wall painting with plastic emulsion paint (two or more coats) of approved brand and manufacture to give an even shade. New work | 96.16 | SQM | 136.65 | ₹13,140.26 |
| 10 | Removing white or color wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 48.05 | SQM | 14.5 | ₹696.72 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_1066401.xls
BOQ • 0.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .