| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 CrAccepted-AOC NAYAKKAR STREET MAPILLAI NAYAKANPATTI RAVUSAPATTI POST THANJAVUR DISTRICT 613403 | THANJAVUR | TAMIL NADU | 613403 | ₹2.8 Cr Quoted ₹2.9 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹2.9 Cr+₹3.0 L (1.06%)Rejected-AOC | ₹2.9 Cr+₹3.0 L (1.06%) | L2 | Rejected-AOC Rejected |
| 3 | L3₹3.0 Cr+₹9.1 L (3.16%)Rejected-AOC | ₹3.0 Cr+₹9.1 L (3.16%) | L3 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | N KRISHNASAMY L2 | K Subramaniyan & Co L3 | R.Venkatraj L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting inclusive of shoring shuttering, baling out water wherever necessary, refilling the foundation with excavated earth and depositing the surplus earth within compound in places shown by the departmental officers with an initial lead of 10 metre and initial lift of 2 metre and clearing and leveling the site etc., complete complying with standard specification and as directed by the departmental officers. | 1,049.1 | cum | 227 ₹2,38,145.7 | 232 ₹2,43,391.2 | 224 ₹2,34,998.4 Lowest |
| 2.00 | Earthwork Open excavation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting inclusive of shoring shuttering, baling out water wherever necessary refilling the foundation with excavated earth other than sandy soil in layers of not more than 15 cm thick layers well rammed and depositing the surplus earth within compound in places shown by the departmental officers with an initial lead of 10 metre and initial lift of 2 metre and clearing and leveling the site etc., complete complying with standard specification and as directed by the departmental officers. | 96.62 | cum | 106 ₹10,241.72 | 108 ₹10,434.96 | 105 ₹10,145.1 Lowest |
| 3.00 | Refilling basement with excavated earth other than sand with an initial head lead of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed, watered and consolidated etc. complete complying with standard specification. | 245 | cum | 43 ₹10,535 Lowest | 45 ₹11,025 | 43 ₹10,535 Lowest |
| 4.00 | Supplying and Filling in foundation and basement with gravel in layers of not more than 15cm thick well rammed watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 528 | cum | 459 ₹2,42,352 | 470 ₹2,48,160 | 454 ₹2,39,712 Lowest |
| 5.00 | Supplying and Filling in foundation and basement with filling M sand in layers of not more than 15cm thick well rammed watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 161.1 | cum | 2,081 ₹3,35,249.1 | 2,132 ₹3,43,465.2 | 2,061 ₹3,32,027.1 Lowest |
| 6.00 | Cement concrete 1:5:10 (one cement, five M sand and ten aggregate) using 40mm gauge hard broken blue granite stone jelly for foundation and basement including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete complying with standard specification and as directed by the departmental officers. | 74.55 | cum | 5,424 ₹4,04,359.2 | 5,555 ₹4,14,125.25 | 5,372 ₹4,00,482.6 Lowest |
| 7.00 | Cement concrete 1:5:10 (one cement, five M sand and ten aggregate) using 40mm gauge hard broken blue granite stone jelly for flooring including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete complying with standard specification and as directed by the departmental officers. | 85 | cum | 5,424 ₹4,61,040 | 5,555 ₹4,72,175 | 5,372 ₹4,56,620 Lowest |
| 8.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
For column footing plinth beam etc. | 441 | sqm | 965 ₹4,25,565 | 988 ₹4,35,708 | 955 ₹4,21,155 Lowest |
| 9.00Supplying and erecting steel centering including necessary supports for plane surfaces, for all RCC works including strutting upto 3.29m in all floors using mild steel shutters of size 90cmx60cm of BG 10 stiffened with mild steel angles of size 25mmx 25mmx3mm laid over silver oak (Country wood) Joists of size 10cmx6.5cm spaced at about 90cm c/c and supported by casurina props of 10cm to 13cm dia. (spaced at 75cm c/c) etc., complete complying with standard specification and as directed by the departmental officers. (The centering will be removed after specified period of concrete without damaging the concrete) | ||||||
| 9.01 | For plane surface such as rectangular or square RCC columns, sunshdes, top and bottom slab of RCC, etc., | 800 | sqm | 1,072 ₹8,57,600 | 1,098 ₹8,78,400 | 1,062 ₹8,49,600 Lowest |
Tender Value
₹2.8 Cr
EMD Value
₹1.5 L
Closing Date
26 Jun 2025, 3:00 pmClosed
Chief Engineer
Office of Chief Engineer, Sardar Patel Road, Dote Campus, Chennai 25
Construction of 5 class rooms with toilet block in Government College of Engineering at Sengipatti in Thanjavur District.
2025_HE_568625_2
Sengipatti_2025
Open Tender
Civil Works - Buildings
Lump-sum
210 days
Sengipatti
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹1.5 L
Yes
12 Nov 2025
19 Jun 2025
27 Jun 2025
19 Jun 2025
26 Jun 2025
19 Jun 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .