Loading…
Loading…
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
16 Jun 2026, 3:00 pm
Commissioner,Nelliyalam Municipality
Nelliyalam Municipality,Pandalur
Construction of new building at pandalur Government hospital in Nelliyalam Municipality
2026_MAWS_679275_1
48/2026/E1
Open Tender
Civil Works - Buildings
Nelliyalam Muncipality
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.5 L
Nelliyalam Municipality
6 Jun 2026
6 Jun 2026
16 Jun 2026
6 Jun 2026
16 Jun 2026
6 Jun 2026
6 Jun 2026 - 16 Jun 2026
11 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth. | ||||||
| 1.01 | First depth upto 2m depth | 345 | m3 | - | - | - |
| 2Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms at the site, etc., complete complying with standard specification and as directed by the departmental officers. | ||||||
| 2.01 | Second depth above 2m depth | 160 | m3 | - | - | BI01010001010000000000000515BI0100001115 |
| 3 | Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as direct-ed by the departmental officers. | 10 | m3 | - | - | BI01010001010000000000000515BI0100001116 |
| 4 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 47 | m3 | - | - | BI01010001010000000000000515BI0100001117 |
| 5 | Supplying and filling in foundation, basement, etc with conveyed earth in layers of not more than 150mm thick layers well watered, rammed with surface vibrator and consolidated including conveyance charges etc. complete complying with standard specification and as directed by the departmental officers. | 67 | m3 | - | - | - |
| 6 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 60 | m3 | - | - | - |
| 7 | Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as direct-ed by the departmental officers. | 21 | m3 | - | - | - |
| 8Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beans, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm * 60cm and 10 BG stiffened with welded mild steel angles of size 25mm * 25mm * 3m for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner, vertical stiffener, side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid). | ||||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
Tendernotice_2.pdf
PDF • 0.72 MB
BOQ_816144.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid