Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77.9 LAccepted-AOC GRAM NAVALGANJ PARADE SARKAR DISTRICT GONDA UTTAR PRADESH | GONDA | GONDA | UTTAR PRADESH | ₹77.9 L | L1 | Accepted-AOC AS PER BOQ |
| 2 | L2₹78.1 L+₹13,322.73 (0.17%)Rejected-AOC | ₹78.1 L+₹13,322.73 (0.17%) | L2 | Rejected-AOC AS PER BOQ |
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
27 Mar 2021, 5:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER Gandak Irrigation Work Circle-I, Gorakhpur
RECONSTRUCTION OF BRIDGE AT KM. 8.400 OF HATA DY IN DISTRICT KUSHINAGAR.
2021_UPIDC_557801_56
05/SE/2020-21
Open Tender
Civil Works
Item Wise
KUSHINAGAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,354
₹1.6 L
Yes
27 Nov 2021
22 Mar 2021
30 Mar 2021
22 Mar 2021
27 Mar 2021
22 Mar 2021
Amount
Dismantling of old & damage brick work with lime/cement mortar and its proper disposal within an initial lead of 60m.
Dismantling of old & damage Reinforce cement concrete work and its proper disposal within an initial lead of 60m.
Earth work for making Ramp and correction of bank, Diversion and making jeepable service road including all cost of materials,T&P and labours and other accessories required for proper completion of work.
Earth work in digging foundation in all type of soil with all lead and lift including refilling the trench and proper disposal of excess earth as per direction of Engineer-in-charge.
Laying P.C.C. 1:3:6 in foundation with cement, sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (20 mm to 40 mm.) including all cost of materials,T&P and labours and other accessories required for proper completion of work.
Laying R.C.C. work in 1:1:2 (M25) sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (10mm to 20mm.) for Slab, pier cap and abutment cap stir including all cost of materials,T&P and labours and other accessories required for proper completion of work. As per direction of Engineer in Charge.
Laying R.C.C. work in M-30 sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (10mm to 20mm.) Wearing coat 75mm thick top of the slab and parapet. including all cost of materials,T&P and labours and other accessories required for proper completion of work. As per of direction of Engineer in Charge.
Centering and shuttering for C.C. work including all cost of materials,T&P labours and other accessories required for proper completion of work.
Centering and shuttering for R.C.C. work including all cost of materials,T&P labours and other accessories required for proper completion of work.
Bending, binding cutting placing in position reinforcement steel including cost of binding wire and tack welding with material. and other accessories required for proper completion of work. As per direction of Engineer in Charge.
Laying Brick ballast Concrete. 1:3:6 in base of brick pitching with cement, sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (20 mm to 40 mm.) including all cost of materials,T&P and labours and other accessories required for proper completion of work.
1st class brick work in brick pitching in1:4 cement mortar with class brick M-150, sonbhadra coarse sand of FM. Not less then 2.50, including all cost of materials,T&P and labours and other accessories required for proper completion of work
Earthwork in filling for making approach road
Laying bricks on edge soling for approach road including cost of all material labour and T&P taxes etc. but excluding GST.
Brick End Pitching for side slope of canal in internal section with 1:4 cement mortar including preparation of sub-grade to prescribe Slope,filling joint including all cost of materials,T&P and labours and other accessories required for proper completion of work.
Providing one coat of VG -30 bitumen painting with two layer of tarfelt again followed by second coat of bitumen on abutment and pier before laying R.C.C. Slab including cost of all material labour and T & P etc.
Supply and laying of 18 MM thick joint filler board in construction joint including cost of all material labour T&P required for proper completion of work.
Boring with 150 mm dia casing pipe including lowering and extraction of assembly loading unloading and carriage. one boring have 5 meter water dia water dewatering capacity so no. of including all cost of materials,T&P and labours and other accessories required for proper completion of work. As per direction of Engineer in Charge
Running of 5 H.P. genrator set pump for dewatering including arrangement of pump suction and delivery pipe and other accessories at site for proper completion of work.
Fix wheel guard stone of size 900x200x200mm including cost of all material ,labour, t&p etc. required for proper completion of work
Supply and Fixing of P.V.C. Pipe for Drainage spout and weep hole including cost of all material ,labour, t&p etc. required for proper completion of work
M/S SHADHVI SINGH
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .