| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-AOC AT MALLIBANDHA PO KALAMACHHUNIN TALCHER DIST ANGUL ODISHA 759103 | ANUGUL | ODISHA | 759103 | ₹1.2 L Quoted ₹1.0 L | L1 | Accepted-AOC AWARDED FOR BEING L1 BIDDER |
| 2 | L2₹1.1 LRejected-Finance JARADA TUBEY DIST ANGUL ODISHA 759132 | JARADA | ANGUL | ODISHA | 759132 | ₹1.1 L | L2 | Rejected-Finance REJECTED FOR NOT BEING L1 BIDDER |
| 3 | L3₹1.4 LRejected-Finance | ₹1.4 L | L3 | Rejected-Finance REJECTED FOR NOT BEING L1 BIDDER |
| 4 | L4₹1.4 LRejected-Finance AT PO MALLIBANDHA TALCHER DIST ANGUL ODISHA PIN 759103 | TALCHER | ANGUL | ODISHA | 759103 | ₹1.4 L | L4 | Rejected-Finance REJECTED FOR NOT BEING L1 BIDDER |
| Sl No | Description | Qty | Unit | ABHAYA KUMAR MOHANTY L1 | M/S ANIRUDHA SAMAL L4 | SHREE LAXMI TRADERS L2 | RUNUBALA SAMAL L3 |
|---|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | |||||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil | 4.05 | Cum | 117 ₹473.85 | 152 ₹615.60 | 100 ₹405 | 148.5 ₹601.42 |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources). | 3.31 | Cum | 4,500 ₹14,895 | 6,300 ₹20,853 | 4,698 ₹15,550.38 | 6,111 ₹20,227.41 |
| 1.03 | Supplying at site : R.C.C. Standards post/ struts/rails/ poles of mix 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6 mm bar nibs wherever required as per direction of Engineer-in- charge (cost of earth works in excavation, concrete works in foundation to be paid separately). | 3.25 | Cum | 19,999 ₹64,996.75 | 26,800 ₹87,100 | 21,368 ₹69,446 | 26,108 ₹84,851 |
| 1.04 | Fencing with R.C.C. post placed at required distance, embedded incement concrete blocks, every 15th post, last but one end post andcorner post shall be strutted on both sides and end post one sideonly, provided with horizontal lines and two diagonals of barbed wireweighing 9.38 kg per 100 metres (minimum), between the two postsfitted and fixed with G.I. staples on wooden plugs or G.I. binding wiretied to 6 mm bar nibs fixed while casting the post (cost of R.C.C.posts, struts, earth work and concrete to be paid for separately) :-Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire | 2,300 | metre | 10 ₹23,000 | 15 ₹34,500 | 10 ₹23,000 | 13 ₹29,900 |
| 2.00 | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC | 1 | Nos | 1,033.66 ₹1,033.66 | 1,430.69 ₹1,430.69 | 1,084.01 ₹1,084.01 | 1,355.8 ₹1,355.80 |
Tender Value
₹1.6 L
EMD Value
₹2,000
Closing Date
24 Dec 2025, 5:00 pmClosed
STAFF OFFICER (CIVIL), HINGULA AREA
SO (CIVIL), OFFICE OF THE GM, HINGULA AREA, P.O._N.S.NAGAR, TALCHER, ANGUL_759148, ODISHA, INDIA
Providing and fixing barbed wire fencing at Gopal prasad Patna Sahi Mines Quarry edge of Hingula OCP under Hingula Area.
2025_MCL_349678_1
MCL/GM(HA)/Civil/e-Tender/ 25-26/102 Dt.18.12.2025
Open Tender
Civil Works - Others
5 days
HINGULA OCP
AS PER NIT
3 documents required · 3 mandatory
₹2,000
Yes
2 Apr 2026
19 Dec 2025
24 Dec 2025
19 Dec 2025
24 Dec 2025
19 Dec 2025
19 Dec 2025 - 21 Dec 2025
Amount
Item Description/ Heading
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources).
Supplying at site : R.C.C. Standards post/ struts/rails/ poles of mix 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6 mm bar nibs wherever required as per direction of Engineer-in- charge (cost of earth works in excavation, concrete works in foundation to be paid separately).
Fencing with R.C.C. post placed at required distance, embedded incement concrete blocks, every 15th post, last but one end post andcorner post shall be strutted on both sides and end post one sideonly, provided with horizontal lines and two diagonals of barbed wireweighing 9.38 kg per 100 metres (minimum), between the two postsfitted and fixed with G.I. staples on wooden plugs or G.I. binding wiretied to 6 mm bar nibs fixed while casting the post (cost of R.C.C.posts, struts, earth work and concrete to be paid for separately) :-Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire
Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC
SHREE LAXMI TRADERS (BID ID -1206020)
RUNUBALA SAMAL (BID ID -1206697)
M/S ANIRUDHA SAMAL (BID ID -1206712)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.