| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 CrAccepted-AOC GURDASPUR CITY | ₹9.7 Cr | L1 | Accepted-AOC Lowest bidder |
| 2 | L2₹10.1 CrRejected-AOC 47 C MODEL TOWN EXTENSION LUDHIANA PB | LUDHIANA | PUNJAB | 141001 | ₹10.1 Cr | L2 | Rejected-AOC Not Lowest |
| 3 | L3₹10.1 CrRejected-AOC 1111 PHASE 3 STREET MODEL TOWN BATHINDA | ₹10.1 Cr | L3 | Rejected-AOC Not Lowest |
| 4 | L4₹10.5 CrRejected-AOC | ₹10.5 Cr | L4 | Rejected-AOC Not Lowest |
| Sl No | Description | Qty | Unit | MANMOHAN SINGH CONTRACTOR L3 | V.S. Saini L4 | MS GARGA ASSOCIATES L1 | AMANDEEP SINGH CONTRACTOR L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in RBM/Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m | 38,638.89 | Cum | 40 ₹15.5 L | 29 ₹11.2 L | 39 ₹15.1 L | 35 ₹13.5 L |
| 2.00 | Carriage of Surkhi, Sand, Earth, Fly Ash, Bajri, Ballast, Stone Boulders,
Kankar and Building Rubbish. For 90 m with katcha | 38,638.89 | Cum | 56 ₹21.6 L | 39 ₹15.1 L | 45 ₹17.4 L | 50 ₹19.3 L |
| 3.00 | Cement concrete 1:3:6 with stone ballast or shingle mixing by mechanical means using concrete mixer volumetric type. Including all lifts and leads complete in all respect as per requirment of site incharge | 174 | Cum | 5,200 ₹9.0 L | 4,899 ₹8.5 L | 5,500 ₹9.6 L | 6,410 ₹11.2 L |
| 4.00 | Reinforced cement concrete M-25 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in
foundation and plinth Including all lifts and leads complete in all respect as per requirment of site incharge | 3,195 | Cum | 7,900 ₹2.5 Cr | 7,499 ₹2.4 Cr | 6,750 ₹2.2 Cr | 7,291 ₹2.3 Cr |
| 5.00 | Reinforced cement concrete M-25 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in superstructure. Including all lifts and leads complete in all respect as per requirment of site incharge | 3,167.2 | Cum | 8,800 ₹2.8 Cr | 8,399 ₹2.7 Cr | 7,900 ₹2.5 Cr | 8,488 ₹2.7 Cr |
| 6.00 | Extra for using computerised concrete batch mixing plant including carriage by transit mixer within 1 km lead (note: where concrete mixer is already included in the rate the same shall be deducted ) | 6,362.2 | Cum | 100 ₹6.4 L | 79 ₹5.0 L | 70 ₹4.5 L | 107 ₹6.8 L |
| 7.00 | Extra for carriage of RMC/batch mixed concrete with transit mixture beyond 1st km . | 6,362.2 | Cum | 20 ₹1.3 L | 29 ₹1.8 L | 35 ₹2.2 L | 76 ₹4.8 L |
| 8.00 | Extra for pumping charges of Batch Mix
Concrete / Ready mix conrete work (RMC) Computrised Batch Mix Plant | 6,362.2 | Cum | 80 ₹5.1 L | 69 ₹4.4 L | 39 ₹2.5 L | 15 ₹95,433 |
| 9.00 | Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of
RCC including bending and binding placing in position complete | 2,413.71 | Qtl | 9,000 ₹2.2 Cr | 8,399 ₹2.0 Cr | 8,650 ₹2.1 Cr | 9,000 ₹2.2 Cr |
| 10.00 | Providing & Fixing of PVC Water Stopper as per the instruction of engineer-in-charge | 2,880.96 | Mtr | 50 ₹1.4 L | 449 ₹12.9 L | 500 ₹14.4 L | 547 ₹15.8 L |
Updated dates
Tender Value
₹11.8 Cr
EMD Value
₹23.6 L
Closing Date
15 Jan 2026, 10:00 amClosed
Executive Engineer SPK Power Houses Division
Shed no 9 Shahpurkandi Township
Estimate for Construction of Retaining wall/Guide Wall on Left Side of River Ravi near Power House No 2
2025_WR_156160_1
08/2025
Open Tender
Civil Works
90 days
Madhopur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹23.6 L
Through VC
28 Jan 2026
23 Dec 2025
15 Jan 2026
23 Dec 2025
15 Jan 2026
23 Dec 2025
30 Dec 2025
Excavation in RBM/Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m
Carriage of Surkhi, Sand, Earth, Fly Ash, Bajri, Ballast, Stone Boulders, Kankar and Building Rubbish. For 90 m with katcha
Cement concrete 1:3:6 with stone ballast or shingle mixing by mechanical means using concrete mixer volumetric type. Including all lifts and leads complete in all respect as per requirment of site incharge
Reinforced cement concrete M-25 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth Including all lifts and leads complete in all respect as per requirment of site incharge
Reinforced cement concrete M-25 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in superstructure. Including all lifts and leads complete in all respect as per requirment of site incharge
Extra for using computerised concrete batch mixing plant including carriage by transit mixer within 1 km lead (note: where concrete mixer is already included in the rate the same shall be deducted )
Extra for carriage of RMC/batch mixed concrete with transit mixture beyond 1st km .
Extra for pumping charges of Batch Mix Concrete / Ready mix conrete work (RMC) Computrised Batch Mix Plant
Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete
Providing & Fixing of PVC Water Stopper as per the instruction of engineer-in-charge
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
Centering and shuttering for faces of walls, partitions, retaining walls and the like (vertical or battering including, attached pilasters buttresses etc.
Supply of Boulder Stone as per departmental specifications I/C digging, Collection, all taxes, loading, unloadding, stacking and including recarriage if any from Govt approved quarry to stack site to site of work.
Loading of Stone (building or pitching) Sand, Earth, Fly Ash, Bajri, Shingle, Spalls, Brick bats, Brick ballast and Stone metal. (Manual means)
Filling boulder stone into wire crates, hand packing (Only Labour)
Weaving wire netting for wire crates including binding sides and partitions to make of 15cm x 15cm or 25cm x 7.5cm mesh incl.cost of MSA wire 4 mm dia (8 SWG) conforming to latest IS specifications
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
Loading, Carriage,Spreading, Dozing and Compaction of Material complete in all respect as per requirment of site incharge lead upto 120m
Making dewatering arrangement by pumping set 4'' *4'' (Tractor driven)
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.63 MB
SBDforguidewall.pdf
Tender Documents • 1.61 MB
BOQ_316802.xls
BOQ • 0.29 MB
Drawings.pdf
Additional Documents • 7.85 MB
Download all tender documents and submit your bid