Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.2 LAccepted-AOC JAMBAD COLLIERY PARSEA CHURULIA KAJORA 713384 WEST BENGAL INDIA | KAJORA | PASCHIM BARDHAMAN | WEST BENGAL | 713384 | ₹3.2 L | 1 | Accepted-AOC as per TCR |
| 2 | 2₹3.5 L+₹31,012.70 (9.72%)Rejected-Finance | ₹3.5 L+₹31,012.70 (9.72%) | 2 | Rejected-Finance as per TCR |
| 3 | 3₹3.7 L+₹54,881.80 (17.2%)Rejected-Finance | ₹3.7 L+₹54,881.80 (17.2%) | 3 | Rejected-Finance as per TCR |
Tender Value
₹3.2 L
EMD Value
₹4,100
Closing Date
17 Oct 2024, 5:00 pmClosed
Area Engineer (EnM) Kajora Area ECL
Office of The General Manager, Kajora Area ECL WB - 713338
Making of delivery range casing for submersible pumps-03 nos ranges, removal of the old delivery range casing of 8 inch dia pipes 02 nos ranges, fitting of submersible pump motor pipe complete set, delivery pipeline repairing in highwalls, suction, d
2024_ECL_318413_1
GM/Kaj/ AE(EnM)/e-Tender /24-25/21 Date 30.09.2024
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Kajora Area, ECL
As per Tender Documents
4 documents required · 4 mandatory
₹4,100
24 Apr 2025
3 Oct 2024
18 Oct 2024
3 Oct 2024
17 Oct 2024
3 Oct 2024
3 Oct 2024 - 14 Oct 2024
Amount
Item Description/ Heading
Digging of trench at the haul road going towards upper bench and then laying of MS pipes to act as casing for heliflex delivery hose of submersible pumps. Making of total 03 no.s of such delivery case
Removing of old delivery range casing made of 8 inch dia MS pipes from the above said haul road that was laid down earlier and is now redundant, so the the MS pipes will be used in the lower bench
Fitting of submersible pump motor set and pontoon for the new sump at coalface for Pump No.01
Installation of submersible pump motor pipeline, suction and delivery range, and fitting of foot valve
Doing the same job for 2nd and 3rd pump in succession one after the other
Before joining of the pipeline, fitting of flange and welding of flanges in the pipes
Again as the water recedes, shifting of both the submersible pumps from the 2nd location to the 3rd location along with pontoon and valves after dismantling from the old location
Maintenance of the delivery pipelines for the next couple of weeks
Suction and delivery pipe line work of turbing pump as the water level reduces
Non return and footvalve changing of No.1 turbing pump after taking repaired valves from fitter store to site
Foot valve repairing of domestic pump Roto-4 Stage, after taking repaired valves from fitter store to site
Lifitng of motor or/and pump in case there is fault in the motor in the coming months, then necessary on site repairing and lowering of the pump
Delivery pipeline repairing in the highwalls
Supply of nut bolt 5/8" X 2"
Supply of heliflex hose of submersible pump, durable quality, cable of handling
Total impact of GST for the purpose of CTC
KHALSA ENTERPRISE
SATGURU ENGG WORKS
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .