Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC SHIMLA DIVISION NO I HIMACHAL PRADESH HP | SHIMLA | HIMACHAL PRADESH | 171001 | ₹2.9 L | L1 | Accepted-AOC AOC |
| 2 | L2₹3.0 LRejected-Finance GOVT CONTRACTOR VILLAGE BHATLA P O BALDYAN TEHSIL DISTT SHIM A | ₹3.0 L | L2 | Rejected-Finance 2nd Lowest |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
30 Apr 2026, 10:00 amClosed
Executive Engineer Division Kasumpti HPPWD Shimla
Executive Engineer Division Kasumpti HPPWD Shimla-
Cutting work ni km. 5/00 to 5/150
2026_PWD_134533_6
SD-I-CTR-Tender-1084 dt 17-04-2026
Open Tender
Civil Works
30 days
mashobra
As per SBD
13 documents required · 13 mandatory
₹350
₹6,000
25 Jun 2026
21 Apr 2026
30 Apr 2026
21 Apr 2026
30 Apr 2026
21 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting and disposal of earth work in by mechanical in all heights and depths in all kinds of soils, including saturated soils comprising of pick work, jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock (where blasting is prohibited) and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site., according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at dumping site as per satisfaction of Engineer- in -charge through all modes of transportation including head load ,animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour ( if required the cost of all useful material along road side 97.06 cum ,such as stone will be recovered @ 300/- cum which shall not be blasting work which sall be proportinoately increase decrease as the quantity of earth work. All the surplus excavated earth to be dumped at dumping site(dumping sites will be arranged by the contractor on his own cost). Any loss to the public and private propriety, human being, machinery during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | 1 | Per Cubic Metre | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
SBD291195.pdf
Tender Documents • 7.00 MB
BOQ_199079.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid