Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.7 LAdmitted-Fee/PreQual/Technical/Finance | -20.98% | ₹5.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.4 L+₹64,177.21 (11.2%)Admitted-Fee/PreQual/Technical/Finance | -12.16% | ₹6.4 L+₹64,177.21 (11.2%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹6.6 L+₹84,623.69 (14.7%)Admitted-Fee/PreQual/Technical/Finance | -9.35% | ₹6.6 L+₹84,623.69 (14.7%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹7.2 L+₹1.4 L (24.6%)Admitted-Fee/PreQual/Technical/Finance | -1.51% | ₹7.2 L+₹1.4 L (24.6%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹7.3 L
EMD Value
₹14,560
Closing Date
2 Sept 2026, 4:00 pmClosed
Executive Engineer ID Ompora
Executive Engineer ID Ompora
Construction of RCC channel with crate protection on Dalwan khul branch of Munshi Canal at RD1500 m and 1650 MTS.
2026_IFC_320620_12
enit No 7 of 08 2026
Open Tender
Civil Works
Percentage
30 days
Budgam
Please refer Tender documents.
5 documents required · 5 mandatory
₹300
Chief Engineer Kmr I and FC Deptt.
₹14,560
7 Sept 2026
12 Aug 2026
3 Sept 2026
12 Aug 2026
2 Sept 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 119.81 | cum | 592.9 | ₹71,035.35 |
| 2 | Dumping stone excluding cost of stones. in Horizontal on level | 6.84 | cum | 237.9 | ₹1,627.24 |
| 3 | Hand-packing stones in wire-crates; excluding cost of crates and stones | 110 | cum | 371.15 | ₹40,826.5 |
| 4 | Supply of Stones (Nallah ) 225 mm nominal size | 116.84 | cum | 700 | ₹81,788 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 4.71 | cum | 5,202.9 | ₹24,505.66 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) | 5.23 | cum | 6,591.25 | ₹34,485.42 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 16.58 | cum | 7,104.35 | ₹1,17,790.12 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 631.34 | kg | 123.2 | ₹77,781.09 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 73.49 | sqm | 286.35 | ₹21,043.86 |
| 10 | 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 coarse sand) | 90.05 | sqm | 283.8 | ₹25,556.19 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.96 MB
BOQ_1066799.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .