Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance 10 0 RAMBAG COLONY RATLAM RATLAM MADHYA PRADESH 457001 | RATLAM | MADHYA PRADESH | 457001 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
4 Jun 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer RnB Division Kulgam
Executive Engineer RnB Division Kulgam
Macadamization link road from main road Qaimoh Shrine by way Providing/laying of 75mm thick Wet Mix in stretches, P/L 50mm thick bituminous Macadam and 25mm thick semidense with 6mm thick seal coat on existing pavement mechanically with paver
2021_PWDJK_125254_9
09/2021-22/RnB/Kul/991-1011 dated 25-05-2021
Open Tender
Civil Works
Item Rate
3 days
Kulgam
Please refer Tender documents.
4 documents required · 4 mandatory
₹600
Executive Engineer RnB Division Kulgam
Exempted
5 Jun 2021
28 May 2021
5 Jun 2021
28 May 2021
4 Jun 2021
28 May 2021
120 days
Amount
Providing/Laying 75mm Wet mix macadam on the preprared sub base with crushed quarry stone agg. of spacified grading ( as per IRC/MOST specification) including mixing of crushed material with pre determined quantity of water ( which should not varry from OMC determined as per IS:2720 PT-VIII by more than agg. limit) in accordince with specification to form dense mass which is spread and rolled with vibatory roller 80-100 KN speed of which should not exceed 5 Kms per Hour each layer and rolling should countinue till 98% density is achieved to approved lines / grades , X-sectons. The mixing is to be prepared in approved mechnical mixing plant of suitable capacity ( excluding laying of cold Emulsion with Bitumen pressure sprayer on surface free from dust dirt, wetness @0.75 Kgs/Sqm complete(but excluding cost of cold Emulsion) incld. all carriages taxes, octories, TP & E Testing Charges during execution of work complete job. incld: scarifing where ever required
Providing and applying of tack coat using hot straight run bitumen of grade 80/100 including heating the bitumen, spraying the bitumen with mechnical operated spray unit fitted on bitumen boiler,cleaning and preparing the existing road surface as per specifications clause 503 of MOST on WBM Surface @0.75 Kg/Sqm including all carriages etc complete job.
P/L of Bitumenous macadam base course with stone agg. of quality size and grading as specified in C.P.W. D specifications and straight run bitumen of grade 80/100 @ 3.30% by weight of total mix including hot mixing of stone agg. and bitumen in hot mix plant transporting, mixed material and laying mixed with paver finisher to the required level and grade, rolling with road roller of 8 to 10 tonne capacity to achieve the required compaction and density confirming to MOST specification (50mm compacted thickness) complete including cost and carriage of all materials.
P/L of 25mm thick Semidence asphaltic base course using mineral aggregate satisfying the gradation set out in specifications, with 5 percent binding content (by weight of total mix) bitumen of grade 80/100 @ 2.88 Kg/Sqm with the aid of hot mix plant and paver finisher including rolling with 8 to 10 tonne capacity to achieve the required compaction and density confirming to MOST specifications (with bitumen 80/100 (quarry)including cost and carriage of all materials.
Providing and laying seal coat of premixed fine agg. (Passing 2.36mm and retained on 180 micron sieve) with bitumen using 128 Kgs, of bitumen of grade 80/100 bitumen per Cum of fine agg. and 0.60 Cum of fine agg. Per 100 Sqm of road surface to achieve the desired compaction as per MOST specifications including rolling and finishing with road all complete
Providing and laying berm filling using quary muck having 60% metal including spreading compacting with road rooler and cleaning of site complete with all carriage of material
M/S UNITED CONSTRUCTION CO
MIR CONSTRUCTION
M/S KHAN ROAD CONSTRUCTIONS
M/s HIGH WAY CONSTRUCTIONS
stage.html
html • 0.02 MB
finance_245418.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .