Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.0 LAccepted-Finance | L1 | Accepted-Finance Rate as per BSR |
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
18 Mar 2026, 1:00 pmClosed
VDO
GP Khiyera
Digital Librery Bhawan nirmaan kary Khiyera
2026_PRD_546262_3
151-153
Open Tender
Miscellaneous Works
Percentage
180 days
as per tender document
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
GP Khiyera, MD RISL
₹50,000
Yes
8 Apr 2026
14 Mar 2026
18 Mar 2026
14 Mar 2026
18 Mar 2026
14 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.1 | work detial | - | - | - | - |
| 1.01 | Earth work in foundation excavation up to 1.5m, ramming bottom, dressing sides, back filling and disposal of surplus soil with
in a lead of 50m. | 43.09 | cum | 178.46 | ₹7,689.84 |
| 1.02 | Cement concrete in foundation and plinth
with stone ballast size 40mm including curing and compaction etc in 1:4:8 mix | 8.08 | cum | 3,629.72 | ₹29,328.14 |
| 1.03 | Brick work in foundation and plinth using
bricks of class designation-75 in CM 1:6 | 112.81 | cum | 4,346.06 | ₹4,90,279.03 |
| 1.04 | DPC with RCC 1:1.5:3 mix | 4.19 | cum | 5,823.04 | ₹24,398.54 |
| 1.05 | Brick work in super structure using bricks of
class designation-75 in CM 1:6 | 61.79 | cum | 248.61 | ₹15,361.61 |
| 1.06 | Reinforced cement concrete work including curing compaction, finishing with rendering in cement sand mortar 1:3 and making good and joints excluding cost of centering, shuttering and reinforcement in 1:1.5:3 (1cement: 1.5course sand: 3-graded stone
aggregate 20mm nominal size) | 25.07 | Cum | 5,823.04 | ₹1,45,983.61 |
| 1.07 | Providing and fabricating reinforcement for RCC work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) in foundation and super structure up to 4.5m height above plinth level hot rolled deformed (IS: 1139) cold twisted (IS: 1786)
bars | 3,047.3 | Kg | 97.94 | ₹2,98,452.56 |
| 1.08 | Centering and shuttering with plywood or steel sheets including strutting, propping, bracing both ways with wooden members
and removal of from work | 175.17 | Sqm | 319.04 | ₹55,886.24 |
| 1.09 | Cement concrete in foundation and plinth with stone ballast size 40mm including
curing and compaction etc in 1:3:6 mix | 11.43 | Cum | 3,912.73 | ₹44,722.5 |
stage.html
html • 0.03 MB
techsummary_974118.pdf
BOQ Comparative Chart
xlsx
finsummary_974118.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.01 MB
BOQ_974118.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .