Loading…
Loading…
Tender Value
₹97,794
EMD Value
₹1,000
Closing Date
5 Aug 2026, 5:00 pm
EE, ETD-I, Noida
EE, ETD-I, Noida
Work
2026_UPTCL_1172009_1
ST.ET-05/ETD-I/W/2026-27
Open Tender
Electrical Works
Item Rate
30 days
ETD-I, Noida
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE, ETD-I
₹1,000
24 Jul 2026
24 Jul 2026
6 Aug 2026
24 Jul 2026
5 Aug 2026
24 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1The following work is to be done for erection and installation of 132 KV P.T. for interconnection Bay @ 132 KV Main Bus Bay with Other associated works at 132 KV Sub-station Sec-115 Noida under Electricity Transmission Division-I, Noida as detailed under : | |||||
| 2 | Dismantling of old, 1 accuracy class, 145 KV PT from structure, including opening of control cable, jumper & earthing of 132KV Main Bus PT and its shifting from switchyard to substation store with help of hydra/crane including all men, materials and T&Ps provided by contractor for satisfactorily completion of work. | 3 | Nos. | - | - |
| 3 | Erection on new Structure, jumpering of all phase PTs & control cable termination from PT to PT junction box. Proper Earthing with MS Flats has to be ensured.The work also includes modification of structure if needed for placement of new PTs on structure. All men, materials, hydra/crane and T&Ps will be provided by contractor for satisfactorily completion of work. | 3 | Nos. | - | - |
| 4Laying of 4/6core x 2.5 sq mm Copper Control Cables in Cable Trenches from Control Panels in Control Room to 132KV PT Junction Boxes in Switchyard as per Cable Schedule including Shifting of Cables in Drums from Storage Place at the Sub Station to Erection Site and Shifting Back the Balance Cables to Stores at the Sub Station. | |||||
| 5 | 4C x 2.5 sq mm | 500 | Mtr. | - | - |
| 6.01 | Erection of 132 KV Bus isolators of different make as per instruction manual and technical specification with post insulator
perating mechanism box, tie rod, arms and proper alignment fo
smooth operation. This work also included shifting of new isolator
from store to site, termination of control cable, jumper connection,
earthing(Painted with green color) and all associated work for
complete the job as per instruction of Engineer/In-Charge. | 1 | No. | - | - |
| 6.02 | Major overhauling of 145 KV SF-6 gas C.B. of CGL make spring type installed on HV side bay of 63 MVA T/F-I at 132 KV S/S Sector 115 Noida . The work includes overhauling of Control block assembly, Opening, Cleaning and greasing of Motor charging system, Replacement of worn out parts. Checking of shock absorber, closing damper etc, Adjustment of all Gaps, Cleaning and Greasing of Levers, connecting rods, CAM, Disc CAM etc, Checking of mechanism assembly for wear and tear, rectification/repairing of worn out parts. Checking of limit switch, Power Contact, Auxiliary contactors for proper functioning, Checking and retighting of all electrical connections, Checking of Gas leakage from copper pipe assembly of Gas system. | 1 | Job | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
TD05.pdf
Tender Documents • 1.65 MB
BOQ_2200828.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].