| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC 1 1 GRAM SAIDAPUR SADAPUR DISTRICT AMBEDKARNAGAR | AMBEDKAR NAGAR | UTTAR PRADESH | 224122 | ₹1.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.3 Cr+₹7.6 L (6.29%)Rejected-AOC GORAKHPUR | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | ₹1.3 Cr+₹7.6 L (6.29%) | L2 | Rejected-AOC L2 |
| 3 | L3₹1.3 Cr+₹10.1 L (8.39%)Rejected-AOC | ₹1.3 Cr+₹10.1 L (8.39%) | L3 | Rejected-AOC L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical As pre uploaded |
| 5 | Rejected-Technical VILLAGE BASIA POST SAHJANWAN THANA SAHJANWAN DISTRICT GORAKHPUR UTTAR PRADESH PIN 273209 | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 273209 | - | - | Rejected-Technical As pre uploaded |
Tender Value
Refer Docs
EMD Value
₹3.3 L
Closing Date
1 Feb 2021, 1:00 pmClosed
Superintending Engineer
Superintending Engineer, Rapti Nahar Nirman Mandal-2 Basti U.P.
Construction of P.R.B. at Km. 18.600 of Baikunthpur dy.
2021_UPIDC_549023_1
04/SE/2020-21
Open Tender
Civil Works
Item Wise
90 days
Maharajganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹3.3 L
Yes
25 Jun 2021
27 Jan 2021
1 Feb 2021
27 Jan 2021
1 Feb 2021
27 Jan 2021
Amount
E/W in excavation of foundation in all type of soil including initial lead up to 30m & lift up to 1.50m and its proper disposal and back filling as per direction by engineer in charge required for proper completion of work including cost of all T&P,Labour etc.
Laying C.C, A-40, M-15 in foundation with cement (OPC 43 Grade),coarse sand of F.M not less then 2.00 and crushed hard stone ballast (20-40mm size) including lead up 60m lift up to 3m mechanical mixing & mechanical vibration but excluding of centering and shuttering required for proper completion of work includind cost of all material, T&P,Labour etc.
Laying R C.C, A-20, M-25 in gaurd stone with cement (OPC 43 Grade),coarse sand of F.M not less then 2.00 and crushed hard stone ballast (4.75-20mm size) including lead up 60m lift up to 3m mechanical mixing & mechanical vibration but excluding of centering and shuttering required for proper completion of work includind cost of all material, T&P,Labour etc.
Laying R.C.C, A-20, M-30 with cement (OPC-43 Grade)coarse sand of F.M not less than 2.0 and crushed hard stone grit of size 4.75 to 20mm, including lead up to 60m lift up to 3m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all meterial, T&P, Labour etc.
Laying C.C for wearing Coat A-10-M-30 with cement (OPC-43 Grade)coarse sand of F.M not less than 2.0 and crushed hard stone grit of size 4.75 to 10mm including lead up to 60m lift up to 3m mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all meterial, T&P, Labour etc.
Centering & Shuttering for R.C.C work with all lead & lift reqired for proper completion of work including cost of all material and scafolding labour, T&P etc
Cutting bending binding and placing TMT steel bar for reinforcement with cost of binding wirw with required for proper completion of work including cost of all material, labour, T&P etc
S/F Draiange spout pipe 100mm dia in R.C.C slab for proper completion of work including cost of all material, labour, T&P etc
E/W in making Diversion in all type of soil including lead up to 30.00 lift up to 1.50m with manual compaction and dressing required for proper completion of work
P/L base material of size 45-63 mm stone ballast including consolidation in 200mm thickness , prepration of sub base , spreading ballast, making medihs to retain OMC and cost of all carriage of material, labour T&P etc
P/L base material of size 22.4-53 mm stone ballast including consolidation in 225mm thickness , prepration of sub base , spreading ballast, making medihs to retain OMC and cost of all carriage of material, labour T&P etc
P/L Prime coat with bitumin emulsion over WBM surface on prepared surface of granular base including cleaning of road surface and spraying primer for proper completion of work and including wages of fire man and tar boiler man
P/L Tack coat with bitumin emulsion over Prime coated surface on prepared surface of granular base including cleaning of road surface and spraying primer for proper completion of work and including wages of fire man and tar boiler man
providing laying & rolling 20 mm thick premix carpet composed of 13.2 mm to 6.7 mm aggregate including mixing in suitable plant and bitumen emulsion including cost of all carriage of material, labour T&P etc
P/L seal coat sealing voids in a bituminous surface ith crused stone chips of 6.7 mm size laid to the specified levels including cost of all carriage of material, labour T&P etc
IInd Class Brick work for Barriar in 1:6 C.M. with coarse sand including all lead & lift and cost of all material, labour, T&P etc
E/W in making canal section u/s and D/S
Dewatering with all cost of power/POL machines,pump well,paint system & operator etc with assembling and dismantling of equipment required for completion of work, labour, T&P etc.
P/L 75 mm dia PVC pipe for weep holes including cost of all material labour t&p etc
P/L 160mm dia PVC pipe in footpath
Dismantling of 2nd class brick barriar including cost of all T&P,Labour etc.
Pucca road cutting of diversion including all lead lift labour t&p etc
E/W in Removing diversion in all type of soil including lead up to 30m and lift up to 1.5 m with cost of all T&P,Labour etc.
M/s VIJENDRA PRATAP SINGH
M/S AJAY CONSTRUCTION COMPANY
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .